Skip to content

Subdivision · Planning application

Nampa denies 178-home Sagewood subdivision and annexation request

The City Council denied annexing 33.72 acres and the zoning and preliminary plat for the mixed-use subdivision, citing timing, limited green space amenities, distance to homes without pathways, and too few shops and services. The decision was made Feb. 10.

DeniedSPP-00170-2025Filed Nov. 23, 2025South Nampa+3 related filings
Site plan for Nampa denies 178-home Sagewood subdivision and annexation request
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Sagewood Subdivision would bring about 33.7 acres east of Southside Boulevard and north of East Lewis Lane in Nampa into city limits, with a mix of 95 detached single-family homes and 78 attached townhome and duplex units. The plan also includes 7 commercial lots zoned for neighborhood business uses, along with 16 common lots, a neighborhood park, and open space. The Planning and Zoning Commission was asked to recommend approval of the annexation, zoning and preliminary plat to City Council.

Mixed-use development consisting of 178 single-family attached and single-family detached residential, 4 commercial, and 18 common lots on 33.72 acres in the BN, RS4, RS6, and RD zones.

Project name on file: Sagewood

Timeline

  1. Aug. 21, 2026

    42 documents added

  2. March 11, 2026

    Notice to Agencies/Departments

  3. March 11, 2026

    Property Postings

  4. Feb. 10, 2026

    Decision: Denied

    Nampa Planning and Zoning Commission: Denied.

  5. Feb. 10, 2026

    Public hearing: Nampa Planning and Zoning Commission

  6. Jan. 26, 2026

    Notice to Area Property Owners

  7. Dec. 23, 2025

    Assess Fees (Subdivision)

  8. Dec. 12, 2025

    Plan Intake Passed

  9. Dec. 12, 2025

    Accepted for review

  10. Nov. 26, 2025

    Plan Intake Failed

  11. Nov. 23, 2025

    Application filed

Documents

Site plans

  • Site plan for a roughly 2.92-acre commercial subdivision of seven lots, showing garages, driveways and parking-area dimensions, prepared by Bailey Engineering, Inc.

    March 6, 2026 · 1 page · 522 KB · Available Online

    Download Preliminary subdivision plat with zoning and lot layout
  • Landscape plan sheets for the Sagewood Subdivision preliminary plat, dated March 5, 2026, prepared by Bailey Engineering, Inc.

    March 6, 2026 · 5 pages · 7.1 MB · Available Online

    Download Preliminary plat landscape plan
  • Site drawing from Bailey Engineering showing the revised phasing layout, with Phase 1 at about 16.77 acres and Phase 2 at about 16.94 acres, plus lot and driveway notations.

    March 3, 2026 · 1 page · 1.1 MB · Available Online

    Download Revised phasing plan with Phase 1 and Phase 2 acreages
  • Revised preliminary plat sheets with an open space summary, land use summary, and overall project data including lot counts, zoning, and setbacks.

    March 3, 2026 · 5 pages · 4.0 MB · Available Online

    Download Revised preliminary plat
  • Revised zoning exhibit showing zone districts with acreage and unit counts, including commercial lots, townhouse and alley-loaded lots, and driveway layouts.

    March 3, 2026 · 1 page · 1.1 MB · Available Online

    Download Zoning exhibit, revised
  • Engineering exhibit summarizing site acreage and open space calculations, including common lots, open space lots, buffer lots and total qualified open space at 17.14%.

    Nov. 23, 2025 · 1 page · 964 KB · Open Space Exhibit

    Download Open space exhibit with open space summary
  • Engineering exhibit dividing the subdivision into Phase 1 and Phase 2, with acreage labeled for each phase (about 16.98 and 16.73 acres).

    Nov. 23, 2025 · 1 page · 828 KB · Phasing Plan

    Download Phasing exhibit showing Phase 1 and Phase 2 acreage
  • Preliminary plat for a 200-lot subdivision on 33.72 acres, with a land use summary of zoning, lot counts, setbacks, density and open space, prepared by Bailey Engineering.

    Nov. 23, 2025 · 5 pages · 3.2 MB · Prelim Plat

    Download Preliminary subdivision plat with land use summary

Renderings

  • Landscape plan sheet for the preliminary plat, prepared by JensenBelts Associates and dated March 5, 2026, at a scale of 1 inch to 80 feet.

    March 6, 2026 · 1 page · 1.2 MB · Available Online

    Download Preliminary plat landscape plan
  • Rendered landscape plan sheets for the Sagewood Subdivision preliminary plat, prepared by Bailey Engineering, Inc., dated November 4, 2025.

    Nov. 23, 2025 · 6 pages · 8.3 MB · Landscape Plans

    Download Preliminary plat landscape plan rendering

Plans

  • Open space summary table for the subdivision, listing total site area of 33.72 acres, 5.33 acres of qualified open space, and about 21.71% of gross buildable area.

    March 3, 2026 · 1 page · 1.5 MB · Available Online

    Download Revised open space exhibit
  • Revised exhibit for the pathway, prepared by Bailey Engineering, Inc.; the extracted text is mostly stamp and letterhead fragments, so the drawing details are not readable.

    March 3, 2026 · 1 page · 924 KB · Available Online

    Download Revised pathway exhibit (engineer's stamped sheet)
  • Marketing lookbook from CBH Homes showing single-level, two-level, narrow and townhome plans plus interior design styles, not project-specific elevations.

    Nov. 23, 2025 · 13 pages · 2.2 MB · Proposed Building Elevations

    Download Builder design lookbook, summer 2025

Project narrative

  • Cover letter and project narrative for the Sagewood annexation and preliminary plat, covering 204 lots, zoning requests, open space and amenities.

    March 3, 2026 · 2 pages · 516 KB · Available Online

    Download Revised narrative for annexation and preliminary plat
  • Narrative from the applicant's planner describing the 204-lot mixed residential and commercial subdivision, requested zoning, open space, and access.

    Nov. 23, 2025 · 2 pages · 532 KB · Narrative

    Download Project narrative for annexation and preliminary plat

Staff reports

  • Planning staff report for the Feb. 10, 2026 Planning and Zoning Commission hearing on annexation, zoning, a potential development agreement and preliminary plat, with traffic and utility findings.

    May 1, 2026 · 223 pages · 57.0 MB · PZ Staff Report

    Download Staff report for annexation, zoning and preliminary plat
  • City council staff report on annexation, zoning to residential and neighborhood business districts, and a preliminary plat, with traffic study and engineering requirements.

    May 1, 2026 · 74 pages · 43.3 MB · CC Staff Report_May 2026

    Download Staff report for annexation, zoning and preliminary plat
  • Planning staff report recommending City Council action on annexation, zoning, a potential development agreement and preliminary plat for a mixed residential and commercial subdivision, with a revised layout.

    March 6, 2026 · 223 pages · 57.0 MB · Available Online

    Download Staff report for Sagewood Subdivision annexation, zoning and preliminary plat

Decisions

Application

Studies and reports

  • Metes-and-bounds legal description and survey exhibit for a 3.012-acre portion of a section, with line and curve tables.

    March 3, 2026 · 2 pages · 149 KB · Available Online

    Download Zone BN legal description
  • Table of groundwater depths below ground surface at test pits TP-1 through TP-12, recorded on 6/30, 7/21 and 8/29/2025, with a note that one pipe was not yet installed.

    Nov. 23, 2025 · 1 page · 122 KB · Ground Water Reports

    Download Groundwater monitoring table, June through August 2025
  • ALLWEST's geotechnical evaluation of subsurface conditions at the Moore Property Mixed Use Development site, with field results and design and construction recommendations.

    Nov. 23, 2025 · 43 pages · 9.2 MB · Geotech/Soil Reports

    Download Geotechnical evaluation report
  • Preliminary engineering report covering sewer and water connections, average and peak flow estimates for 183 lots, and irrigation considerations for the approximately 34-acre subdivision.

    Nov. 23, 2025 · 5 pages · 2.3 MB · Storm Water Report

    Download Preliminary engineering report (sewer, water, irrigation, storm drainage)

Correspondence

  • Email thread in which the GIS manager confirms the reserved subdivision name changed from Tapatio Springs to Sagewood, at the applicant's request.

    Nov. 23, 2025 · 3 pages · 279 KB · Email - Sub Name

    Download Subdivision name reservation email thread, Sagewood

Other documents

  • March 3, 2026 · 26 KB · Available Online

    Download Revised Zone BN description
  • March 3, 2026 · 26 KB · Available Online

    Download Revised zone RD description
  • Revised metes-and-bounds legal description for a roughly 11.237-acre parcel in the Zone RD subdivision plat, dated March 1, 2026, with a line table.

    March 3, 2026 · 3 pages · 205 KB · Available Online

    Download Revised Zone RD legal description
  • March 3, 2026 · 27 KB · Available Online

    Download Revised Zone RS4 description
  • Revised metes-and-bounds legal description for a portion of the south half of the southwest quarter of Section 12, labeled Zone RS4, dated March 1, 2026.

    March 3, 2026 · 4 pages · 301 KB · Available Online

    Download Zone RS4 legal description (revised)
  • Sagewood checklist

    Dec. 23, 2025 · Checklist

  • Zoning map

    Dec. 19, 2025 · Zoning Map

  • Legal description (Word version)

    Dec. 12, 2025 · Legal Description Moore - Word

  • Affidavit of legal interest

    Nov. 23, 2025 · Affidavits x 2

  • Legal descriptions

    Nov. 23, 2025 · Legal Descriptions - Word

  • Legal descriptions

    Nov. 23, 2025 · Legal Descriptions: BN, RS4, RS6, RD

  • Estimated value figures for a mixed project of townhomes, single-family lots, and commercial space, with a total project line.

    Nov. 23, 2025 · 1 page · 22 KB · Estimated Value

    Download Estimated project value breakdown
  • Neighborhood meeting sign-in sheet

    Sign-in sheet from the neighborhood meeting held for this preliminary subdivision plat application.

    Nov. 23, 2025 · Neighborhood Mtg - Sign-In Sheet

  • Vicinity map

    Nov. 23, 2025 · Vicinity Map 1

  • Warranty deed

    Nov. 23, 2025 · Warranty Deeds

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.