Skip to content

Subdivision · Planning application

104-home subdivision with 8 commercial lots proposed on farmland in Nampa

The plan covers about 33.6 acres of irrigated farmland and includes a sport court, shade structure and pathways. Trilogy Development is also seeking annexation. The preliminary plat is in review.

In reviewSPP-00185-2026Filed Oct. 5, 2026South Nampa+3 related filings
Site plan for 104-home subdivision with 8 commercial lots proposed on farmland in Nampa
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Please see project narrative.

Project name on file: Sagewood Subdivision

Timeline

  1. Oct. 14, 2026

    Plan Intake Passed

  2. Oct. 14, 2026

    Accepted for review

  3. Oct. 5, 2026

    21 documents added

  4. Oct. 5, 2026

    Application filed

Documents

Site plans

  • Oct. 5, 2026 · 1 page · 333 KB · Open Space Exhibit

    Download Sagewood open space exhibit
  • Landscape plan sheets for the Sagewood Subdivision preliminary plat, prepared by Bailey Engineering, Inc., dated September 28, 2026.

    Oct. 5, 2026 · 5 pages · 7.6 MB · Landscape Plans

    Download Preliminary plat landscape plan
  • Preliminary subdivision plat sheets showing phase 1 (about 23.50 acres, 69 single-family and 9 common lots) and phase 2 (about 10.21 acres, 36 single-family, 8 commercial, and 2 common lots).

    Oct. 5, 2026 · 7 pages · 4.1 MB · PDF Prelim Plat

    Download Preliminary plat with phase 1 and phase 2 lot counts

Renderings

  • Landscape plan sheet for the preliminary subdivision plat, showing block layout, landscape design, and project team contacts. Dated September 28, 2026.

    Oct. 5, 2026 · 1 page · 1.2 MB · Landscape Plans

    Download Preliminary plat landscape plan

Plans

  • Proposed building elevations for the Sagewood development, shown on a single page; the extracted text only lists the standard single-family lot type.

    Oct. 5, 2026 · 1 page · 144 KB · Proposed Building Elevations

    Download Sagewood building elevations
  • Oct. 5, 2026 · 1 page · 337 KB · Other

    Download Sagewood pathway exhibit
  • Engineering sheet dividing the subdivision into phases, with acreage and lot counts per phase (single-family residential, common and commercial lots).

    Oct. 5, 2026 · 1 page · 459 KB · Other

    Download Phasing plan for the Sagewood subdivision

Project narrative

  • Cover letter and narrative for the Sagewood annexation and preliminary plat, covering the 104-lot residential and 8-lot commercial layout, density, open space, and Comprehensive Plan consistency.

    Oct. 5, 2026 · 2 pages · 93 KB · Narrative

    Download Project narrative for annexation and preliminary plat

Notices

  • Notice of an Aug. 17, 2026 on-site neighborhood meeting for a proposed 107-lot single-family and 6-lot commercial subdivision, required before annexation, zoning and preliminary plat filings.

    Oct. 5, 2026 · 2 pages · 324 KB · Proof of Neighborhood Meeting

    Download Neighborhood meeting notice letter

Application

  • Staff notes from a July 22, 2026 pre-application meeting covering annexation and zoning for a mixed-use residential and commercial concept, with setback and density requirements; not an approval.

    Oct. 5, 2026 · 9 pages · 6.7 MB · Pre-Application Meeting Notes

    Download Pre-application planning and zoning property inquiry notes

Studies and reports

  • ALLWEST's October 2025 subsurface evaluation for the proposed mixed-use development, with field results and geotechnical recommendations for design and construction.

    Oct. 5, 2026 · 43 pages · 9.2 MB · Geotech/Soil Reports

    Download Geotechnical evaluation report
  • Preliminary engineering report for the 123-lot Sagewood Subdivision covering sewer flow calculations, water connections and related utilities, dated 08/07/2026.

    Oct. 5, 2026 · 49 pages · 10.2 MB · Storm Water Reports

    Download Preliminary engineering report (sewer, water, irrigation, storm drainage)
  • NV5 memo to city and consultant comparing updated trip generation for the revised mix of single-family homes, commercial sites and office space against the 2025 traffic impact study.

    Oct. 5, 2026 · 8 pages · 1.1 MB · Other

    Download Traffic assessment memo on revised Sagewood site plan

Other documents

  • Affidavit of legal interest

    Sworn statement from the applicant or agent asserting legal interest in the property covered by this preliminary subdivision plat application.

    Oct. 5, 2026 · Affidavit of Legal Interest

  • Master checklist

    Oct. 5, 2026 · Master Application

  • Neighborhood meeting sign-in sheet

    Sign-in sheet recording attendance at the neighborhood meeting held for this preliminary subdivision plat application.

    Oct. 5, 2026 · Proof of Neighborhood Meeting

  • Legal description of subdivision

    Oct. 5, 2026 · Legal Description

  • Vicinity map

    Map showing the location of the proposed subdivision relative to the surrounding area.

    Oct. 5, 2026 · Vicinity Map

  • Warranty deed

    Oct. 5, 2026 · Proof of Proprietary Interest

  • Zone BN legal description

    Oct. 5, 2026 · Legal Description

  • Zone RS7 legal description

    Oct. 5, 2026 · WORD Legal Description

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.