Skip to content

Planning project · Planning application

Concept review under way for multi-story building plan on residential lot

Plans filed Oct. 14 include a daylight basement and main, second and third floors, and are in early concept review with the city. The filing does not say how many homes or what uses are planned.

In reviewPLN26-00955Filed Oct. 14, 2026Southeast Boise · 1221 S Lincoln Ave
Site plan for Concept review under way for multi-story building plan on residential lot
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

City of Boise hasn't published a description of this application yet. See the official record

Project name on file: 1221 S LINCOLN AVE

Timeline

  1. Oct. 14, 2026

    8 documents added

  2. Oct. 14, 2026

    Application Submittal: Online

  3. Oct. 14, 2026

    Application filed

Documents

Site plans

  • Architect's site plan (sheet A1.0) for the D.V. Row townhomes showing setbacks, trash staging, condenser, patios, sidewalks and the alley.

    Oct. 14, 2026 · 1 page · 521 KB · PDS-Other Small Docs

    Download Site plan for townhome project

Plans

  • Architectural second-floor plan for a townhome project, showing bedrooms, baths, balconies and the ADU, with project data and a 2026 date block.

    Oct. 14, 2026 · 1 page · 164 KB · PDS-Other Small Docs

    Download Second floor plan
  • Architectural floor plan sheet A2.3 for a townhome project, showing bedrooms, baths, window and door schedules, and ceiling heights at 1/4"=1'-0" scale.

    Oct. 14, 2026 · 1 page · 146 KB · PDS-Other Small Docs

    Download Third floor plan
  • Architectural floor plan sheet A2.0 for the daylight basement level, showing the interior and exterior accessory dwelling unit layouts and square footage for the townhome project.

    Oct. 14, 2026 · 1 page · 140 KB · PDS-Other Small Docs

    Download Daylight basement plan with accessory dwelling unit
  • Architectural sheet showing the front exterior elevation of the townhome project, drawn at 1/4"=1'-0" by Studio L Architecture.

    Oct. 14, 2026 · 1 page · 161 KB · PDS-Other Small Docs

    Download Exterior elevations, front (sheet A4.0)
  • Architectural exterior elevation sheet for the D.V. Row Townhomes project, dated October 14, 2026, prepared by Studio L Architecture.

    Oct. 14, 2026 · 1 page · 93 KB · PDS-Other Small Docs

    Download Exterior elevations, sheet A4.1
  • Architectural main floor plan sheet (A2.1) for the townhome project, showing room layouts, window and door schedules, and ceiling heights, prepared by Studio L Architecture.

    Oct. 14, 2026 · 1 page · 155 KB · PDS-Other Small Docs

    Download Main floor plan

Application

  • Application for a lot line adjustment and construction of four attached townhouses, each with an accessory dwelling unit, in the MX-1 zone.

    Oct. 14, 2026 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.