Skip to content

Planning project · Planning application

Boise State soccer complex expansion approved by city planning commission

The approval lets the university enlarge the eastern soccer field at its BOAS Soccer Complex into a full-sized practice field. The project adds no seating or field lighting, and the Planning & Zoning Commission decided it on Nov. 3.

ApprovedPLN25-00573Filed July 10, 2025South Boise Village · 1507 S Oakland Ave+2 related filings
Site plan for Boise State soccer complex expansion approved by city planning commission
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Enlarge practice field

Project name on file: 1507 S OAKLAND AVE

Timeline

  1. Jan. 6, 2026

    Planning Applications: Project Entitled

  2. Dec. 11, 2025

    Planning Applications: Generate Additional Application

  3. Dec. 11, 2025

    Planning Applications: Notes

    Additional CUP25-00044 generated in error, which has now been voided. Was meant for a different PLN per J. Lowe.

  4. Sept. 3, 2025

    Pending Application Submittal: Planning Applications in Review

  5. Aug. 21, 2025

    IDR Review Complete: IDR Waived

  6. Aug. 21, 2025

    Neighborhood Meeting Review: Completed

  7. July 16, 2025

    Concept Review Complete: CR Complete - Type 3

  8. July 14, 2025

    Concept Review Complete: Engineering Preview

  9. July 14, 2025

    Concept Review Complete: Engineering Preview Complete

    A determination has been made that this project will be a Category I Hillside project. In addition to the already submitted documents, additional documents may be required during the BLD Review process.No additional documentation is needed at this time.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.

  10. July 10, 2025

    Application Submittal: Online

  11. July 10, 2025

    Application filed

Documents

Site plans

  • Site concept sheet for the soccer complex at Boise State, showing parking stall counts (175 existing, 141 proposed, a 19% reduction), added bike parking, and a sheet list covering the practice field expansion and…

    July 10, 2025 · 4 pages · 16.9 MB · PDS-Other Small Docs

    Download Concept plan for Boas Soccer Complex improvements

Project narrative

  • Notice of an August 7, 2025 drop-in neighborhood meeting on a proposed expansion of the eastern soccer field at the Boise State BOAS Soccer Complex, with no added seating or lighting.

    Aug. 21, 2025 · 17 pages · 18.7 MB · PDS-Other Small Docs

    Download Neighborhood meeting notice
  • Staff summary of a pre-application concept review for expanding a practice field to regulation size, covering parking removal and the conditional use permit findings required.

    July 16, 2025 · 3 pages · 457 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Cover letter describing a proposal to expand the eastern soccer field at the BOAS Soccer Complex for practices, with no added seating and revisions to the northern parking row.

    July 10, 2025 · 2 pages · 330 KB · PDS-Other Small Docs

    Download Concept review narrative for soccer field expansion

Application

  • Application for a soccer field on an R-3 zoned parcel, filed by The Land Group, Inc. for the State of Idaho (Board of Education) as owner.

    July 10, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form
  • Public Works questionnaire answering No to new parcels, additions, new dwellings, driveways, and deep grading, and no retaining walls.

    July 10, 2025 · 1 page · 672 KB · PDS-Other Small Docs

    Download Hillside project questionnaire

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.