Skip to content

Planning project · Planning application

Solar panel installation at a home approved by Boise planning staff

City staff approved the project on Sept. 30. The site layout shows the panels and equipment on the back of the home, not visible from the street. The lot is about 0.14 acres.

ApprovedPLN26-00599Filed June 22, 2026North End · 1606 N 17th St+1 related filing
Site plan for Solar panel installation at a home approved by Boise planning staff
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Solar

Project name on file: 1606 N 17TH ST

Timeline

  1. July 17, 2026

    Planning Applications: Project Entitled

  2. June 29, 2026

    Planning Applications: Generate Additional Application

    Regenerate DRH due to Contact issue.

  3. June 29, 2026

    Pending Application Submittal: Planning Applications in Review

  4. June 24, 2026

    Concept Review Complete: CR Complete - Type 2

  5. June 22, 2026

    Application Submittal: Online

  6. June 22, 2026

    Application filed

Documents

Site plans

  • Planner notes on a concept review for rooftop solar panels in a historic district, covering the Certificate of Appropriateness (Minor) requirement, panel setback, and attachment method.

    June 24, 2026 · 1 page · 462 KB · PDS-Concept Review Summary Report

    Download Concept review summary for solar panel installation
  • Planner notes on a concept review for rooftop solar panels in a historic district, covering the Certificate of Appropriateness (Minor) requirement, panel setback, and attachment method.

    June 24, 2026 · 1 page · 462 KB · PDS-Concept Review Summary Report

    Download Concept review summary for solar panel installation
  • Site layout diagram of the solar panel system and equipment, including the battery combo, shut-down button, disconnect, meter main and loadhub, located on the back of the home.

    June 22, 2026 · 1 page · 576 KB · PDS-Other Small Docs

    Download Site layout showing solar panels and equipment on rear of home

Application

  • Application for a solar addition to an existing structure in the R-1C zone, requiring historic review, filed by an applicant on behalf of the property owner.

    June 22, 2026 · 2 pages · 157 KB · PDS-Application

    Download Planning project application form

Correspondence

Other documents

  • Signed statement of legal interest

    June 22, 2026 · 333 KB · PDS-Other Small Docs

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.