Skip to content

Planning project · Planning application

Food truck court with ice cream trolley proposed on lot with existing duplex

The plan would add a food truck court, including an ice cream trolley and shaved ice shack, to a small commercial lot with a duplex. It is under review by the Historic Preservation Commission; a temporary permit lets the trolley and shack stay up to 180 days.

In reviewPLN25-00267Filed March 27, 2025North End · 1615 N 13th St+3 related filings
Site plan for Food truck court with ice cream trolley proposed on lot with existing duplex
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Ice cream trolley, shaved ice shack, duplex

Project name on file: 1615 N 13TH ST

Timeline

  1. Oct. 13, 2026

    6 documents added

  2. March 27, 2026

    Pending Application Submittal: Planning Applications in Review

  3. March 27, 2026

    IDR Review Complete: IDR Waived

  4. March 27, 2026

    Neighborhood Meeting Review: Completed

  5. July 16, 2025

    Neighborhood Meeting Review: Notes

    Updated Application Received Date in Project Details to 7/15/2025, which is when I updated missing required fields on the CZC app.

  6. July 2, 2025

    Planning Applications: Additional CR Needed

  7. July 2, 2025

    Pending Application Submittal: Planning Applications in Review

  8. July 2, 2025

    IDR Review Complete: IDR Waived

  9. July 2, 2025

    Concept Review Complete: CR Complete - Type 2

  10. July 2, 2025

    Concept Review Complete: Notes

    Per Gemma, Routing back. I moved it through Type 2 to create the CZC, but I am trying to send it back to CR so that I can change it to type 3 and generate the NM list, but it is stuck in a loop. Can you help?

  11. July 2, 2025

    Concept Review Complete: CR Complete - Type 3

  12. May 20, 2025

    Pending Application Submittal: Project Not Needed

  13. May 20, 2025

    Concept Review Complete: Project Not Needed

    homeowner does not give permission for this project

  14. April 28, 2025

    Concept Review Complete: Notes

    Applicant was going to check with property owner to determine if they want to move forward. In CR meeting we determined that a TUA could be accepted this year with the acknowledgement that next year would require full approvals (CZC for food truck cart and duplex).

  15. April 17, 2025

    Concept Review Complete: Corrections Required

    When you are ready, please upload a new project description that indicates the permanent installation of the ice cream trolley and the shaved ice shack, and the permitting of the duplex.Please also upload a site plan that shows the compliant features for the food truck court, and parking for the duplex.

  16. April 17, 2025

    Early Assistance Review: Send to Concept Review

  17. April 3, 2025

    Early Assistance Review: Notes

    reached out to applicant and let them know I will be having some internal discussions and will reach out with next step by the end of next week

  18. March 27, 2025

    Application Submittal: Online

  19. March 27, 2025

    Application filed

Documents

Site plans

  • Blank template for recording a neighborhood meeting's date, attendance, drawings shared, and resulting feedback and planned changes.

    Jan. 28, 2026 · 7 pages · 1.3 MB · PDS-Other Small Docs

    Download Neighborhood meeting summary form
  • March 27, 2025 · 1 page · 263 KB · PDS-Other Small Docs

    Download Trolley layout

Plans

Project narrative

  • Advisory summary of a July 1, 2025 concept review for a food truck court added alongside an existing duplex, covering required applications, parking, and food truck court standards.

    July 2, 2025 · 2 pages · 454 KB · PDS-Concept Review Summary Report

    Download Concept review summary
  • March 27, 2025 · 8 KB · PDS-Other Small Docs

    Download Project description

Application

  • Application for a mobile ice cream trolley to operate seasonally on a mixed-use zoned lot, with plans to adjust utility hookups and improve the patio area.

    March 27, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.