Record of survey · Planning application
City approves transfer of 0.1 acre of backyard to neighboring home
City staff administratively approved a request to move about 0.1 acre from one neighbor's backyard to the adjoining lot, with conditions including a revised survey and new tax parcel numbers. The approval takes effect only after a ten-day appeal period passes without an appeal. The approval was issued Jan. 27.

From the filing
The application's description as it appears in City of Boise's record. See the official record
Jon Gunnerson applied to shift the boundary line between parcels near 2200 S Pond Street in Boise, adjusting portions of nearby lots in the KC Subdivision and Pondcrest Estates Subdivision. Boise city staff granted administrative approval on January 27, 2026, with conditions that include a revised survey record, recording with Ada County, and new tax parcel numbers. The approval does not take effect until a ten-day appeal period passes without an appeal.
Property Line Adjustment
Project name on file: 2200 S POND ST
Timeline
Jan. 27, 2026
Site Inspection: Not Required
Jan. 27, 2026
Review Complete: Completed
Jan. 27, 2026
Current Planning: Complete
Dec. 26, 2025
Building Plan Reviewer: Complete
Dec. 23, 2025
Building Plan Reviewer: In Review
Dec. 23, 2025
Current Planning: In Review
Dec. 23, 2025
Assign Reviewers: Completed
Dec. 19, 2025
Fee Payment: Payment Received
Dec. 18, 2025
Prescreen Review: Passed
Dec. 16, 2025
Prescreen Review: In Progress
Dec. 12, 2025
Prescreen Review: Corrections Required
Dec. 12, 2025
Prescreen Review: In Progress
Nov. 3, 2025
Prescreen Review: Corrections Required
Oct. 28, 2025
Prescreen Review: In Progress
Oct. 20, 2025
Application Submittal: ePlanReview
Oct. 20, 2025
Application filed
Documents
Site plans
- Download Site plan showing property line adjustment
Site plan marking existing and new property lines, with a parcel transferred between two adjacent lots under a record of survey.
Dec. 31, 2025 · 1 page · 2.5 MB · PDS-Maps and Drawings
- Download Record of survey plat for boundary relocation
Survey plat showing parcels in the northwest quarter of the southeast quarter of Section 20, with a relocation of boundaries, easement vacations, and utility approval notes.
Dec. 31, 2025 · 1 page · 143 KB · PDS-Record of Survey
Plans
- Download Subdivision plat for KC Subdivision, resubdivision of Lot 1, Block 4
Recorded plat certificates for a 1978 resubdivision, including highway district acceptance, owner and notary certificates, engineer's certificate, and county engineer approval.
Dec. 31, 2025 · 1 page · 121 KB · PDS-Maps and Drawings
- Download Subdivision plat, sheet 1 of 2
Survey plat showing the Pondcrest Estates Subdivision, a resubdivision of part of a lot in Country Club Acres, with easement notes and curve data.
Dec. 31, 2025 · 1 page · 96 KB · PDS-Maps and Drawings
Project narrative
- Download Letter of intent for lot line adjustment
Applicant's letter describing a proposed transfer of about 0.1 acre between two neighboring parcels to expand a backyard, with no structures planned.
Dec. 31, 2025 · 1 page · 17 KB · PDS-Letter of Intent
- Download Record of survey for property line adjustment
Survey plat and narrative for a property line adjustment between adjoining lots, citing prior surveys, subdivision plats and deeds used as references.
Dec. 31, 2025 · 2 pages · 257 KB · PDS-Record of Survey
Decisions
- Download Administrative approval action letter for property line adjustment
Boise City Development Services grants administrative approval of a property line adjustment between two parcels, subject to conditions on the record of survey, parking, sidewalks and agency compliance.
Jan. 27, 2026 · 3 pages · 148 KB · PDS-Action Letter
Notices
- Download Notice of administrative approval
City notice that staff found the property line adjustment project follows the Boise zoning ordinance and has been approved, with an appeal deadline of Feb. 2, 2026.
Jan. 23, 2026 · 2 pages · 674 KB · PDS-Legal Notice
Photos
- Download Site photos
Photographs of the site taken on Dec. 19, 2025, filed with the record of survey application.
Dec. 31, 2025 · 8 pages · 14.2 MB · PDS-Photos
Correspondence
- Download Addressing agency comments
Addressing technician reviewed the record of survey and confirmed both parcel addresses are unchanged, asking to be notified once the survey is finalized.
Jan. 27, 2026 · 1 page · 118 KB · PDS-Agency Comments
- Download Building Department agency comments
The Building Department reviewed the preliminary record of survey and has no comments at this time.
Jan. 27, 2026 · 1 page · 105 KB · PDS-Agency Comments
- Download Fire Department agency comments
The Boise Fire Department reviewed the survey application and approved it without comments, noting any deviation from the plan needs its approval.
Jan. 27, 2026 · 2 pages · 263 KB · PDS-Agency Comments
- Download Parks and Recreation agency comments
Boise Parks and Recreation reviewed the application with Community Forestry and has no comments or recommendations.
Jan. 27, 2026 · 1 page · 56 KB · PDS-Agency Comments
- Download Airport agency comments
Boise Airport staff has no objection to the project but requires a revised avigation easement with the new legal description and noise attenuation for new residential or school development.
Jan. 15, 2026 · 1 page · 175 KB · PDS-Agency Comments
- Download Boise Project Board of Control agency comments
Irrigation agency reports no district facilities on the property but notes a valid water right and requires that neighboring irrigation ditches remain unobstructed and protected by easement.
Jan. 15, 2026 · 2 pages · 141 KB · PDS-Agency Comments
Other documents
- Noticing radius map
Jan. 23, 2026 · 536 KB · PDS-Maps and Drawings
- Transmittal sheet
Jan. 2, 2026 · 100 KB · PDS-Transmittal Agencies
- Legal descriptions
Dec. 31, 2025 · 1.7 MB · PDS-Other Small Docs
- Statements of legal interest
Dec. 31, 2025 · 2.8 MB · PDS-Statement of Legal Interest
- Payment receipt
Dec. 19, 2025 · 134 KB · PDS-Receipts