Four townhomes in two buildings approved to replace single house

The city approved four attached single-family townhomes, arranged as two pairs on 0.35 acres, with conditions. The existing house must be demolished, each pair will share a driveway, and a detached sidewalk with street trees is required. The decision is dated July 17.

ApprovedCZC25-00124Filed May 22, 2026Southeast Boise · 2233 S Division Ave+3 related filings
Site plan for Four townhomes in two buildings approved to replace single house
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The city approved plans for four attached single-family townhomes at 2233 S Division Ave in Boise, arranged as two pairs on a 0.35-acre site. The existing house will be demolished, and each pair of homes will share a driveway onto Division Avenue. Each townhome will have a roughly 1,700-square-foot fenced backyard.

4-lot townhome subdivision

Project name on file: 2233 S DIVISION AVE

Timeline

  1. July 28, 2026

    Appeal Period: Completed

  2. July 17, 2026

    Review Complete: Completed

  3. July 17, 2026

    Front Desk Planning: Complete

  4. July 17, 2026

    Current Planning: Complete

  5. May 30, 2026

    Assign Reviewers: Completed

  6. May 22, 2026

    Fee Payment: Payment Received

  7. May 22, 2026

    Prescreen Review: Passed

  8. May 22, 2026

    Prescreen Review: In Progress

  9. May 22, 2026

    Application Submittal: ePlanReview

  10. May 22, 2026

    Application filed

Documents

Site plans

  • Site plan sheet showing unit layouts, square footages, setbacks, shared driveway and general construction notes for a four-unit townhouse duplex.

    June 11, 2026 · 12 pages · 4.3 MB · PDS-Maps and Drawings

    Download Architectural site plan for townhouse duplex units 1-4
  • Survey-style site plan showing a preliminary plat for a subdivision, with lot dimensions, utilities, sewer and water lines, easements, and existing structures.

    June 11, 2026 · 1 page · 1.5 MB · PDS-Maps and Drawings

    Download Preliminary plat site plan for division subdivision

Plans

  • Revised landscape plan drawing for the zoning certificate application; the extracted text is mostly garbled sheet labels and not readable enough to confirm details.

    July 10, 2026 · 1 page · 1.0 MB · PDS-Maps and Drawings

    Download Revised landscape plan
  • Landscape plan sheet for the zoning certificate, with a title block and plant schedule; the text is mostly garbled from scanning.

    June 11, 2026 · 1 page · 1.0 MB · PDS-Maps and Drawings

    Download Landscape plan

Project narrative

  • Applicant's letter explaining the zoning compliance request for four single-family attached dwellings in two duplex-style structures, citing ACHD shared driveway standards and city dimensional standards.

    June 11, 2026 · 1 page · 160 KB · PDS-Letter of Intent

    Download Letter of intent for four attached single-family homes

Decisions

Notices

  • Planning and Development Services staff found the project follows the Boise City Zoning Ordinance and approved it; the notice explains how to appeal by July 27, 2026.

    July 15, 2026 · 2 pages · 658 KB · PDS-Legal Notice

    Download Notice of approval for zoning certificate

Application

Studies and reports

  • Tree inventory for the site, listing one maple to be mitigated and a conifer stump to be removed, with caliper-inch totals and condition ratings.

    July 10, 2026 · 2 pages · 243 KB · PDS-Other Small Docs

    Download Arborist report

Photos

  • Four pages of photographs taken May 22, 2026, showing views of the site and the adjacent area, including a nearby residence and a park parking lot.

    June 11, 2026 · 4 pages · 794 KB · PDS-Photos

    Download Site photos with views of the site and surroundings

Correspondence

  • The Boise Fire Department reports no comments on the zoning certificate review, noting that building code requirements will apply and are best addressed at the building permit stage.

    June 30, 2026 · 1 page · 151 KB · PDS-Agency Comments

    Download Boise Fire Department comments
  • Parks and Recreation, with Community Forestry, finds no arborist assessment, concurs with an 18-tree replanting plan, and asks that front-yard trees not be labeled street trees.

    June 30, 2026 · 2 pages · 433 KB · PDS-Agency Comments

    Download Boise Parks and Recreation comments on tree mitigation
  • Public Works requires a separate sewer service line for each townhouse, a sewer tap permit, and possible sewer capacity fees at building permit issuance.

    June 30, 2026 · 1 page · 67 KB · PDS-Agency Comments

    Download Public Works sewer comments
  • Public Works street light trades supervisor reports no comments on the zoning certificate application.

    June 30, 2026 · 1 page · 126 KB · PDS-Agency Comments

    Download Public Works street light comments
  • Solid Waste staff reviewed the application, has no comments, and finds solid waste OK as planned; the memo links to trash enclosure design standards.

    June 30, 2026 · 1 page · 88 KB · PDS-Agency Comments

    Download Solid Waste comments
  • Veolia Water Idaho reports available water pressure and flow at a hydrant near the site, for fire sprinkler design under maximum-day conditions.

    June 11, 2026 · 1 page · 156 KB · PDS-Other Small Docs

    Download Water pressure and flow letter for fire flow review

Other documents

  • Noticing radius map

    July 15, 2026 · 620 KB · PDS-Maps and Drawings

  • Application checklist

    June 11, 2026 · 869 KB · PDS-Other Small Docs

  • Statement of legal interest

    June 11, 2026 · 168 KB · PDS-Statement of Legal Interest

  • Transmittal to agencies

    June 11, 2026 · 132 KB · PDS-Transmittal Agencies

  • Receipt

    May 22, 2026 · 135 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.