Skip to content

Zoning certificate · Planning application

One-bedroom accessory unit above new garage approved, replacing older garage

The city approved the plan with conditions. A 380-square-foot garage would be demolished and replaced with a two-story building about 22 feet tall, with a 469-square-foot unit over a 420-square-foot garage. Conditions cover paving, a walkway and drainage.

ApprovedCZC26-00247Filed Sept. 18, 2026West End · 2515 W Stewart Ave+1 related filing
Site plan for One-bedroom accessory unit above new garage approved, replacing older garage
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The city approved a zoning certificate to build a one-bedroom, 469-square-foot accessory dwelling unit above a new detached garage at 2515 W Stewart Ave in Boise. The existing 380-square-foot garage would be demolished and replaced with a two-story structure with a 420-square-foot garage on the ground floor. The building would be about 21 feet 9 inches tall, and the lot backs onto an alley.

ADU

Project name on file: 2515 W STEWART AVE - ADU

Timeline

  1. Oct. 14, 2026

    20 documents added

  2. Oct. 14, 2026

    Status changed from In review to Approved

    Reported as “Approved”.

  3. Oct. 13, 2026

    Review Complete: Completed

  4. Oct. 13, 2026

    Planning and Zoning: Complete

  5. Oct. 7, 2026

    Planning and Zoning: In Review

  6. Oct. 7, 2026

    Assign Reviewers: Completed

  7. Oct. 2, 2026

    Review Complete: Corrections Required

  8. Oct. 1, 2026

    Planning and Zoning: Corrections Required

  9. Sept. 30, 2026

    Planning and Zoning: In Review

  10. Sept. 30, 2026

    Assign Reviewers: Completed

  11. Sept. 28, 2026

    Fee Payment: Payment Received

  12. Sept. 25, 2026

    Prescreen Review: Passed

  13. Sept. 24, 2026

    Prescreen Review: In Progress

  14. Sept. 24, 2026

    Application Submittal: ePlanReview

    Updated missing field in Project Details to generate ePlan case.

  15. Sept. 18, 2026

    Application filed

Documents

Plans

  • Elevation drawing labeled with exterior materials, including asphalt shingle roofing, vinyl windows, fiber-cement siding and board-and-batten, a fiberglass entry door, and steel-guardrailed wood stairs.

    Sept. 30, 2026 · 1 page · 4.2 MB · PDS-Maps and Drawings

    Download Exterior elevations with material callouts
  • Floor plans for an accessory dwelling unit and attached one-car garage, drawn by Gregg Ostrow, AIA, at 1/4 inch scale (sheet A2).

    Sept. 30, 2026 · 1 page · 259 KB · PDS-Maps and Drawings

    Download ADU and garage floor plans
  • Site plan showing removal of a 380 SF garage and a proposed 469 SF one-bedroom ADU over a 420 SF single-car garage, with no proposed landscaping.

    Sept. 30, 2026 · 1 page · 600 KB · PDS-Maps and Drawings

    Download Site and landscape plan for garage-to-ADU conversion

Project narrative

  • Describes a 469 sf. one-bedroom accessory dwelling unit over a 420 sf. alley-loaded garage, with setback encroachments and demolition of an existing garage and patio.

    Sept. 30, 2026 · 1 page · 139 KB · PDS-Letter of Intent

    Download Detailed letter of explanation for ADU and garage
  • Planner's advisory concept review notes covering ADU requirements, unit configuration, and alley parking access for a Type 2 zoning certificate.

    Sept. 30, 2026 · 2 pages · 458 KB · PDS-Other Small Docs

    Download Concept review summary notes for ADU zoning certificate

Decisions

  • Letter approving a detached-garage ADU under Boise City Code 11-03-03.2.B, with findings on use, size, bedrooms and height, based on plans revised October 7, 2026.

    Oct. 13, 2026 · 9 pages · 237 KB · PDS-Action Letter

    Download Administrative approval letter for accessory dwelling unit

Notices

Application

Photos

  • Site photo key plan keyed to photos 2, 3, 5 and 6, showing the existing single-family residence, garage and shed on the site.

    Sept. 30, 2026 · 1 page · 746 KB · PDS-Photos

    Download Site photo key and photo locations

Correspondence

  • Boise Parks and Recreation, with Community Forestry, has no comments because no existing mature trees or landscaping appear affected by the proposal.

    Oct. 12, 2026 · 1 page · 58 KB · PDS-Agency Comments

    Download Parks Department comments
  • ACHD finds no adjacent street improvements required and lists conditions on traffic impact fees, driveway permits, and right-of-way work.

    Oct. 7, 2026 · 3 pages · 190 KB · PDS-Agency Comments

    Download Ada County Highway District comments
  • Fire Department recommends approval subject to a heat detector interconnected with ADU smoke alarms in the garage, plus standard hydrant, access and construction requirements.

    Oct. 7, 2026 · 1 page · 194 KB · PDS-Agency Comments

    Download Boise Fire Department comments
  • Public Works says the property must connect to central sanitary sewer, which is available in the adjacent alley, and sewer capacity fees may apply at building permit.

    Oct. 7, 2026 · 1 page · 65 KB · PDS-Agency Comments

    Download Public Works sewer comments
  • Veolia requires a separate water service line and meter for the new ADU structure and asks that a site plan be submitted to its engineering team for review.

    Oct. 7, 2026 · 1 page · 210 KB · PDS-Agency Comments

    Download Veolia Water Idaho comments on ADU water service
  • Veolia Water Idaho provides available water pressure and flow at a nearby hydrant for fire sprinkler design, to be attached to approved plan sets.

    Sept. 30, 2026 · 1 page · 113 KB · PDS-Other Small Docs

    Download Veolia fire flow information

Other documents

  • Noticing radius map

    Oct. 9, 2026 · 518 KB · PDS-Maps and Drawings

  • Transmittal sheet

    Oct. 2, 2026 · 136 KB · PDS-Transmittal Agencies

  • ADU checklist

    Sept. 30, 2026 · 863 KB · PDS-Other Small Docs

  • Statement of legal interest

    Sept. 30, 2026 · 257 KB · PDS-Statement of Legal Interest

  • Receipt

    Sept. 28, 2026 · 131 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.