Assured water supply · Planning application
Water supply approved for multifamily project
The city approved an assured water supply application for a multifamily development, finding it complete. The approval was filed May 13. The documents on file do not say how many homes are planned.

From the filing
The application's description as it appears in City of Boise's record. See the official record
This is a City of Boise letter confirming that a water supply application for a project at 2600 N Harrison Hollow Lane was reviewed and found complete. The letter gives the project an Assured Water Supply certification number but does not describe the project itself.
Multifamily, Record of Survey (on another PLN)
Project name on file: 2600 N HARRISON HOLLOW LN
Timeline
Aug. 27, 2026
Assured Water Supply Review: Review Complete
Aug. 10, 2026
Prescreen Review: Prescreen Approved
Aug. 7, 2026
Prescreen Review: Corrections Required
Aug. 7, 2026
Prescreen Review: Prescreen Approved
PM uploaded requested documents received from applicant
Aug. 7, 2026
Prescreen Review: Notes
PM uploaded requested documents received from applicant
July 9, 2026
Prescreen Review: Corrections Required
Please upload the following documents as individual PDFs:- A site location map showing the zoning of the Development area, labelled as Exhibit B-1- A site plan drawn to scale and showing all existing and proposed improvements. Show utility easements, water mains and water system appurtenances, water service connections, etc. Label as Exhibit C-1.- A "Will Serve" letter from a designated water provider, labelled as Exhibit C-2- A completed demand estimate worksheet showing the estimated water demands for the Development, labelled as Exhibit C-3.
May 13, 2026
Application Submittal: In Office
May 13, 2026
Application filed
Documents
Site plans
- Download Site exhibit, exhibit C-1
Single-sheet civil site exhibit at 1 inch to 40 feet scale showing proposed building and utility layout, prepared by the project engineer.
Aug. 7, 2026 · 1 page · 389 KB · PDS-Other Small Docs
Decisions
- Download Assured water supply application completeness letter
City Public Works letter from the Water Resources Program Coordinator confirming the Assured Water Supply application was received and determined complete.
Aug. 27, 2026 · 1 page · 75 KB · PDS-Other Small Docs
Application
- Download Assured Water Supply application B
City of Boise Part II application for an Assured Water Supply certification for a development served by a water district, with applicant and contact information in Section A.
Aug. 27, 2026 · 10 pages · 345 KB · PDS-Other Small Docs
- Download Assured water supply application form
Application form for an assured water supply review covering a multifamily project, with agent, developer, applicant and owner contact details and a note to submit Application B.
May 13, 2026 · 3 pages · 159 KB · PDS-Application
- Download Assured Water Supply Application B form
Blank-form style application for Assured Water Supply certification, for developments served by the city's water provider, with applicant and contact sections.
May 13, 2026 · 10 pages · 280 KB · PDS-Other Small Docs
Studies and reports
- Download Water demand calculator worksheet for assured water supply
Calculator output estimating annual, average and maximum daily water demand at buildout for 45 residential customers and no commercial or industrial customers.
Aug. 7, 2026 · 1 page · 25 KB · PDS-Other Small Docs
Correspondence
- Download Veolia water will-serve letter
Veolia confirms it can serve the project under its current tariffs, with new services and hydrants required and a letter valid for twelve months from its date.
Aug. 7, 2026 · 1 page · 271 KB · PDS-Other Small Docs
Other documents
- Zoning map
Aug. 7, 2026 · 2.1 MB · PDS-Other Small Docs




