Skip to content

Assured water supply · Planning application

Water supply approved for multifamily project

The city approved an assured water supply application for a multifamily development, finding it complete. The approval was filed May 13. The documents on file do not say how many homes are planned.

ApprovedAWS26-00029Filed May 13, 2026Highlands · 2600 N Harrison Hollow Ln+6 related filings
Site plan for Water supply approved for multifamily project
Site plan from the application documents.
The county's parcel map doesn't list the filing's address; the pin is where an address lookup puts it.

From the filing

The application's description as it appears in City of Boise's record. See the official record

This is a City of Boise letter confirming that a water supply application for a project at 2600 N Harrison Hollow Lane was reviewed and found complete. The letter gives the project an Assured Water Supply certification number but does not describe the project itself.

Multifamily, Record of Survey (on another PLN)

Project name on file: 2600 N HARRISON HOLLOW LN

Timeline

  1. Aug. 27, 2026

    Assured Water Supply Review: Review Complete

  2. Aug. 10, 2026

    Prescreen Review: Prescreen Approved

  3. Aug. 7, 2026

    Prescreen Review: Corrections Required

  4. Aug. 7, 2026

    Prescreen Review: Prescreen Approved

    PM uploaded requested documents received from applicant

  5. Aug. 7, 2026

    Prescreen Review: Notes

    PM uploaded requested documents received from applicant

  6. July 9, 2026

    Prescreen Review: Corrections Required

    Please upload the following documents as individual PDFs:- A site location map showing the zoning of the Development area, labelled as Exhibit B-1- A site plan drawn to scale and showing all existing and proposed improvements. Show utility easements, water mains and water system appurtenances, water service connections, etc. Label as Exhibit C-1.- A "Will Serve" letter from a designated water provider, labelled as Exhibit C-2- A completed demand estimate worksheet showing the estimated water demands for the Development, labelled as Exhibit C-3.

  7. May 13, 2026

    Application Submittal: In Office

  8. May 13, 2026

    Application filed

Documents

Site plans

  • Single-sheet civil site exhibit at 1 inch to 40 feet scale showing proposed building and utility layout, prepared by the project engineer.

    Aug. 7, 2026 · 1 page · 389 KB · PDS-Other Small Docs

    Download Site exhibit, exhibit C-1

Decisions

  • City Public Works letter from the Water Resources Program Coordinator confirming the Assured Water Supply application was received and determined complete.

    Aug. 27, 2026 · 1 page · 75 KB · PDS-Other Small Docs

    Download Assured water supply application completeness letter

Application

  • City of Boise Part II application for an Assured Water Supply certification for a development served by a water district, with applicant and contact information in Section A.

    Aug. 27, 2026 · 10 pages · 345 KB · PDS-Other Small Docs

    Download Assured Water Supply application B
  • Application form for an assured water supply review covering a multifamily project, with agent, developer, applicant and owner contact details and a note to submit Application B.

    May 13, 2026 · 3 pages · 159 KB · PDS-Application

    Download Assured water supply application form
  • Blank-form style application for Assured Water Supply certification, for developments served by the city's water provider, with applicant and contact sections.

    May 13, 2026 · 10 pages · 280 KB · PDS-Other Small Docs

    Download Assured Water Supply Application B form

Studies and reports

  • Calculator output estimating annual, average and maximum daily water demand at buildout for 45 residential customers and no commercial or industrial customers.

    Aug. 7, 2026 · 1 page · 25 KB · PDS-Other Small Docs

    Download Water demand calculator worksheet for assured water supply

Correspondence

  • Veolia confirms it can serve the project under its current tariffs, with new services and hydrants required and a letter valid for twelve months from its date.

    Aug. 7, 2026 · 1 page · 271 KB · PDS-Other Small Docs

    Download Veolia water will-serve letter

Other documents

  • Zoning map

    Aug. 7, 2026 · 2.1 MB · PDS-Other Small Docs

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.