Skip to content

Conditional use · Planning application

Parking cut from 237 to 148 spaces approved for office complex, now under appeal

The city approved removing a parcel from an older parking permit for an office complex, leaving 148 spaces, above the 139 required. The removed land is set for a separate multifamily project. A neighbor appealed on Aug. 20 to the Hearing Examiner.

ApprovedCUP26-00014Filed May 13, 2026Highlands · 2511 N Harrison Hollow Ln+7 related filings
Site plan for Parking cut from 237 to 148 spaces approved for office complex, now under appeal
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The city approved a request to remove the parcel at 2653 N Harrison Hollow Lane from an older conditional use permit that covered off-site parking for the office building at 2601 N Bogus Basin Road. The office will still have 148 parking spaces across three lots, more than the 139 required by the earlier permit. No new construction is proposed.

***APPEAL REC'D 8-20-26*** Multifamily, Record of Survey (on another PLN)

Project name on file: 2600 N HARRISON HOLLOW LN

Timeline

  1. Aug. 25, 2026

    Appeal Period: Completed

  2. Aug. 14, 2026

    Review Complete: Completed

  3. Aug. 14, 2026

    Current Planning: Complete

    Planning and Zoning Department Review cycle #1CompletedComplete107/24/2026 11:55 AM07/27/2026 03:38 PM08/14/2026 09:37 AMPlanning and ZoningDoug Exton20 days 21.5 hrs

  4. July 24, 2026

    Current Planning: In Review

    Planning and Zoning Department Review cycle #1CompletedComplete107/24/2026 11:55 AM07/27/2026 03:38 PM08/14/2026 09:37 AMPlanning and ZoningDoug Exton20 days 21.5 hrs

  5. July 24, 2026

    Assign Reviewers: Completed

  6. July 22, 2026

    Fee Payment: Payment Received

  7. July 21, 2026

    Prescreen Review: Passed

  8. July 20, 2026

    Prescreen Review: Corrections Required

  9. July 20, 2026

    Prescreen Review: In Progress

  10. July 10, 2026

    Prescreen Review: Corrections Required

  11. July 9, 2026

    Prescreen Review: In Progress

  12. May 13, 2026

    Application Submittal: ePlanReview

  13. May 13, 2026

    Application filed

Documents

Site plans

  • Single-sheet site exhibit (Exhibit C-1) showing the proposed building, parking and EV stall locations at 1" = 40' scale, prepared by a civil engineering firm.

    July 27, 2026 · 1 page · 392 KB · PDS-Maps and Drawings

    Download Site exhibit with proposed building and EV parking layout

Plans

  • Architect's parking exhibit sheet showing existing parking spaces, areas no longer part of the parking supply, and areas to be used for a separate multifamily development.

    July 27, 2026 · 1 page · 167 KB · PDS-Maps and Drawings

    Download Parking exhibits, existing and reduced parking areas

Project narrative

  • Applicant seeks a minor modification to reduce parking; 148 remaining spaces would exceed the 139-space minimum after a lot is split for multifamily housing.

    July 27, 2026 · 1 page · 84 KB · PDS-Letter of Intent

    Download Letter of intent for parking reduction

Decisions

  • William Richmond's pro se memorandum appealing the August 14, 2026 Planning Director approval, arguing the parcel removal and 89-space parking reduction were misapplied as a minor modification.

    Aug. 20, 2026 · 5 pages · 169 KB · PDS-Appeals

    Download Appellant memorandum in administrative appeal
  • Letter approving a minor conditional use permit modification that removes one parcel from the permit area, with background on prior 1994 and 1995 approvals for the site.

    Aug. 14, 2026 · 5 pages · 182 KB · PDS-Action Letter

    Download Administrative approval letter for conditional use modification

Notices

  • Notice that a conditional use permit modification removing one parcel from an earlier permit was approved, with an appeal deadline of Aug. 24, 2026.

    Aug. 14, 2026 · 2 pages · 909 KB · PDS-Legal Notice

    Download Notice of approval for conditional use modification

Application

  • Appeal of an August 14 administrative approval removing a parcel and 89 parking spaces from a conditional use permit, citing city code and state law.

    Aug. 20, 2026 · 1 page · 57 KB · PDS-Appeals

    Download Appeal application of administrative approval
  • Application form for a conditional use permit modification to a multifamily project, with property, agent, applicant, owner and project details, and a note that the proposal is a modification of an earlier permit.

    May 13, 2026 · 6 pages · 299 KB · PDS-Application

    Download Conditional use permit application form

Studies and reports

  • City of Boise water demand calculator for an assured water supply application, projecting 45 residential customers at buildout with average and maximum daily demand figures.

    July 27, 2026 · 1 page · 25 KB · PDS-Other Small Docs

    Download Assured water supply demand calculator

Photos

  • Site context plan sheet from the architect's set for the Juniper Springs conditional use permit application, dated 7/9/2026 and marked not for construction.

    July 27, 2026 · 1 page · 5.1 MB · PDS-Photos

    Download Site context plan sheet A1.12

Correspondence

  • Letter from Boise City Planning and Development Services confirming receipt of an appeal of the conditional use permit, with the public hearing before the Hearing Examiner to be scheduled later.

    Sept. 4, 2026 · 1 page · 81 KB · PDS-Appeals

    Download Notice that appeal was received, hearing not yet scheduled
  • Boise Parks and Recreation reviewed the application with Community Forestry and has no comments or recommendations; it notes the proposal reduces an existing off-site parking approval.

    Aug. 14, 2026 · 1 page · 59 KB · PDS-Agency Comments

    Download Parks Department comments
  • Public Works street light trades supervisor reviewed the application and submitted no comments.

    Aug. 14, 2026 · 1 page · 126 KB · PDS-Agency Comments

    Download Public Works street light comments
  • Public Works conditions on hillside development compliance and a required stormwater management plan before building or grading permits.

    July 27, 2026 · 1 page · 135 KB · PDS-Agency Comments

    Download Public Works hillside and drainage comments
  • July 27, 2026 · 1 page · 98 KB · PDS-Correspondence

    Download Veolia correspondence
  • Water provider letter reporting available system pressure and flow at a nearby hydrant, for fire sprinkler design and Fire Department review.

    July 27, 2026 · 1 page · 112 KB · PDS-Other Small Docs

    Download Veolia Water fire flow availability letter
  • Veolia confirms the project can be served under its current tariffs, with new services and hydrants required and existing services brought to standard; the letter expires after twelve months.

    July 27, 2026 · 1 page · 273 KB · PDS-Other Small Docs

    Download Veolia water serviceability letter

Public comments

  • Public comment

    Aug. 5, 2026 · 279 KB · PDS-Public Comment

  • Public comment

    Aug. 5, 2026 · 6.2 MB · PDS-Public Comment

Other documents

  • Noticing radius map

    Aug. 14, 2026 · 725 KB · PDS-Maps and Drawings

  • Agency transmittal

    July 30, 2026 · 133 KB · PDS-Transmittal Agencies

  • Zoning map

    July 27, 2026 · 2.1 MB · PDS-Maps and Drawings

  • Statement of legal interest

    July 27, 2026 · 174 KB · PDS-Statement of Legal Interest

  • Payment receipt

    July 22, 2026 · 130 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.