Skip to content

Design review · Planning application

Industrial warehouse of up to 300,000 square feet proposed on 18-acre site

The Boyer Company's plan, in partnership with the City of Boise, calls for a building of about 266,000 square feet for light manufacturing, storage and distribution, with phasing options. It is under review by the Design Review Commission.

In reviewDRH26-00300Filed Sept. 15, 2026South Eisenman · 2649 E Freight St+4 related filings
Site plan for Industrial warehouse of up to 300,000 square feet proposed on 18-acre site
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Industrial warehouse building with phasing options that would total approximately 300,000 square feet space for industrial uses. *Project Management* - Joe Bruce

Project name on file: 2649 E FREIGHT ST

Timeline

  1. Oct. 14, 2026

    17 documents added

  2. Sept. 25, 2026

    DR: In Review

  3. Sept. 25, 2026

    Assign Reviewers: Completed

  4. Sept. 21, 2026

    Fee Payment: Payment Received

  5. Sept. 21, 2026

    Prescreen Review: Passed

  6. Sept. 18, 2026

    Prescreen Review: In Progress

  7. Sept. 18, 2026

    Prescreen Review: Corrections Required

  8. Sept. 15, 2026

    Prescreen Review: In Progress

  9. Sept. 15, 2026

    Application Submittal: ePlanReview

  10. Sept. 15, 2026

    Application filed

Documents

Site plans

  • Site plan for a roughly 268,114-square-foot building on about 18.8 acres, showing proposed hydrant, bike racks, storm drain seepage bed, transformer, monument sign, and parking calculations.

    Sept. 25, 2026 · 1 page · 1.3 MB · PDS-Maps and Drawings

    Download Site plan
  • Site plan sheet showing keynoted proposed items such as a fire hydrant, bike rack, underground storm drain seepage bed and electrical transformer.

    Sept. 25, 2026 · 1 page · 1.2 MB · PDS-Maps and Drawings

    Download Site plan, north sheet
  • Site plan for the south portion of the project showing keynoted proposed items such as a fire hydrant, bike racks, a storm drain seepage bed, and an electrical transformer.

    Sept. 25, 2026 · 1 page · 930 KB · PDS-Maps and Drawings

    Download Site plan, south area

Renderings

  • Rendering sheet DR04 from Babcock Design, dated Aug. 22, 2026, showing design review renderings for the Boyer Boise Gateway project.

    Sept. 25, 2026 · 1 page · 16.3 MB · PDS-Maps and Drawings

    Download Design review renderings, sheet DR04

Plans

  • Design review building elevation drawings at 1 inch to 40 feet scale, showing facade material areas and square footage by finish type (P-1, P-2, P-3, storefront, doors).

    Sept. 25, 2026 · 1 page · 1.7 MB · PDS-Maps and Drawings

    Download Design review elevations, north south east and west
  • Landscape plan sheets with plant schedule, irrigation notes, and tree calculations for perimeter landscape and street buffers under Design Review.

    Sept. 25, 2026 · 4 pages · 7.9 MB · PDS-Maps and Drawings

    Download Landscape plans
  • Sheet DR06 maps existing roads and adjacent sidewalks, noting that no bus routes or bike trails serve the surrounding area.

    Sept. 25, 2026 · 1 page · 3.0 MB · PDS-Maps and Drawings

    Download Mobility plan, sheet DR06
  • Design review overall floor plan sheet (DR02) at 1 inch equals 50 feet, showing grid lines, bay dimensions, and the warehouse area of about 263,942 square feet.

    Sept. 25, 2026 · 1 page · 127 KB · PDS-Maps and Drawings

    Download Overall floor plan, design review

Project narrative

  • Applicant's letter describing the Building 5 industrial project: its I-1 zoning intent, roughly 266,000 sq ft size, planned uses, site layout, and access configuration.

    Sept. 25, 2026 · 2 pages · 71 KB · PDS-Letter of Intent

    Download Letter of intent for Building 5 design review

Application

  • Application form for a design review of a roughly 300,000 square foot industrial warehouse proposal in an industrial zone, with phasing options and applicant and agent contact details.

    Sept. 25, 2026 · 6 pages · 230 KB · PDS-Application

    Download Design review application form
  • Design review application for a roughly 300,000 square foot industrial warehouse building with phasing options, including site design footprint figures for building, landscaping and paving.

    Sept. 15, 2026 · 6 pages · 226 KB · PDS-Application

    Download Design review application for industrial warehouse

Photos

  • Photographs of the project site taken looking north, south, east and west, with an overall site photograph, from the design review submittal.

    Sept. 25, 2026 · 1 page · 14.5 MB · PDS-Maps and Drawings

    Download Site photos from four directions

Correspondence

  • Veolia Water Idaho reports water pressure and flow available at a nearby hydrant for fire sprinkler design, to be attached to the plan sets.

    Sept. 25, 2026 · 1 page · 113 KB · PDS-Other Small Docs

    Download Veolia Water fire flow letter

Other documents

  • Transmittal sheet

    Oct. 2, 2026 · 223 KB · PDS-Transmittal Agencies

  • Statement of legal interest

    Sept. 25, 2026 · 545 KB · PDS-Statement of Legal Interest

  • Submittal checklist

    Sept. 25, 2026 · 899 KB · PDS-Submittal Checklist

  • Fee receipt

    Sept. 21, 2026 · 131 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.