Skip to content

Planning project · Planning application

185-unit, 7-story apartment building proposed as first phase of mixed-use project

The first of three phases would include 32 studios, 108 one-bedroom and 45 two-bedroom units, with 181 structured parking spaces. It also calls for street improvements and a Whitewater Park Boulevard extension. The City Council is the deciding body.

In reviewPLN25-01094Filed Dec. 12, 2025West End · 2740 W Fletcher St+7 related filings
Site plan for 185-unit, 7-story apartment building proposed as first phase of mixed-use project
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Mixed-use development

Project name on file: 2850 W FLETCHER ST

Timeline

  1. Oct. 13, 2026

    10 documents added

  2. Sept. 22, 2026

    Pending Application Submittal: Planning Applications in Review

  3. Aug. 28, 2026

    IDR Review Complete: IDR Complete With Recommendations

  4. Aug. 28, 2026

    Neighborhood Meeting Review: Completed

  5. March 4, 2026

    Concept Review Complete: Generate AWS

  6. March 4, 2026

    Concept Review Complete: CR Complete - Type 3

  7. Feb. 26, 2026

    Concept Review Complete: Corrections Required

    A preliminary meeting was held on 1/2/2026. Since then, it has been confirmed that a Subdivision application will not be required based on the current project scope. A Record of Survey application will be reviewed by the City after the right-of-way dedication/vacation process with ACHD has been completed.An additional meeting with Design Review and Floodplain planners is recommended before proceeding with a neighborhood meeting.

  8. Dec. 12, 2025

    Application Submittal: Online

  9. Dec. 12, 2025

    Application filed

Documents

Site plans

  • Site plan from HURAA Architecture for the apartment project, showing fire hydrant locations, hose run distances, fire lanes, aerial apparatus road and trash staging, dated Nov. 24, 2025 for plan concept review.

    Dec. 12, 2025 · 1 page · 937 KB · PDS-Other Small Docs

    Download Proposed site plan with fire access and hydrant layout

Plans

  • Applicant's IDR narrative covering entitlements for three mixed-use multifamily phases with retail, structured parking, and a phasing plan for sequenced construction.

    Aug. 6, 2026 · 15 pages · 5.0 MB · PDS-Other Small Docs

    Download Interdepartmental Review narrative for three-phase apartments
  • Architect's sheet A-310 showing cross-section A through the podium apartment block and a north interior elevation, dated 11/24/2025 for the plan concept review.

    Dec. 12, 2025 · 1 page · 1.4 MB · PDS-Other Small Docs

    Download Proposed building sections, apartment block
  • Exterior elevation drawing for the multifamily building with sheet notes, finish material key, floor heights and an issue log dated 11.24.2025 for plan concept review.

    Dec. 12, 2025 · 2 pages · 4.0 MB · PDS-Other Small Docs

    Download Proposed north elevations, multifamily building
  • Architectural floor plan sheets for the apartment project, with sheet notes on finish floor elevations, wall types, fire extinguisher placement and related references.

    Dec. 12, 2025 · 8 pages · 5.8 MB · PDS-Other Small Docs

    Download Proposed floor plans

Project narrative

  • Planning staff summary of a Type 3 concept review covering a three-phase mixed-use proposal, with phase 1 unit mix, street improvements, and parking and access details.

    March 4, 2026 · 3 pages · 480 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Letter requesting a Concept Review for a seven-story mixed-use apartment building, listing existing approvals, infrastructure work, and ACHD roadway improvements.

    Dec. 12, 2025 · 4 pages · 319 KB · PDS-Other Small Docs

    Download Concept review letter of intent

Notices

  • Notice inviting residents to a July 9, 2026 neighborhood meeting on the proposed mixed-use apartment project, with phasing, unit counts and parking details.

    July 14, 2026 · 16 pages · 16.0 MB · PDS-Other Small Docs

    Download Neighborhood meeting notice and project overview

Application

  • Application for a mixed-use building with five stories of apartments over a two-story podium with structured parking and ground-floor commercial or retail space.

    Dec. 12, 2025 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form

Studies and reports

  • Staff comments from the Aug. 20 interdepartmental review of a mixed-use, three-phase project, covering design, solid waste and other department recommendations.

    Aug. 28, 2026 · 50 pages · 6.6 MB · PDS-Interdepartmental Review Summary Report

    Download Interdepartmental review summary report

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.