Demolition of two commercial buildings totaling about 8,000 square feet approved

The city approved plans to fully demolish two single-story commercial buildings on a 1.35-acre site, including foundations and utilities. The site would then be graded and seeded. The approval was issued July 17.

ApprovedPLN26-00525Filed May 29, 2026Morris Hill · 300 N Orchard St+1 related filing
Site plan for Demolition of two commercial buildings totaling about 8,000 square feet approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

City of Boise hasn't published a description of this application yet. See the official record

Project name on file: 300 N ORCHARD ST

Timeline

  1. July 17, 2026

    Planning Applications: Project Entitled

  2. June 29, 2026

    Pending Application Submittal: Planning Applications in Review

  3. June 15, 2026

    Concept Review Complete: CR Complete - Type 2

  4. June 8, 2026

    Concept Review Complete: Corrections Required

    Please upload a project description.

  5. May 29, 2026

    Application Submittal: Online

  6. May 29, 2026

    Application filed

Documents

Site plans

  • Existing site plan for the property, a single page; the text extracted from the scan is garbled, so the details are not legible.

    May 29, 2026 · 1 page · 1.4 MB · PDS-Other Small Docs

    Download Existing site plan

Plans

Project narrative

  • Advisory summary of a pre-application concept review noting a Zoning Certificate as the required application, with proposed demolition of existing structures and two commercial buildings.

    June 15, 2026 · 1 page · 452 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Cover letter and scope narrative for a two-building commercial demolition, covering asbestos abatement, utility disconnection, phased methods, dust control, and site restoration.

    June 15, 2026 · 2 pages · 389 KB · PDS-Other Small Docs

    Download Demolition narrative and project description

Application

  • Application for demolition of the existing structures on an MX-2 zoned parcel, with applicant and owner contact information and a certification statement.

    May 29, 2026 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form