Skip to content

Zoning certificate · Planning application

Demolition of two one-story commercial buildings approved

The city approved tearing down two single-story masonry and wood-truss commercial buildings, about 8,000 square feet each or combined per the applicant. No new construction was reviewed, and the lot must be stabilized with groundcover until redeveloped.

ApprovedCZC26-00143Filed June 29, 2026Morris Hill · 300 N Orchard St+1 related filing
Site plan for Demolition of two one-story commercial buildings approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The project is the demolition of two single-story commercial buildings, made of masonry and wooden trusses, at 300 N Orchard Street in Boise. The city approved the demolition only; no new construction was proposed or reviewed.

Project name on file: 300 N ORCHARD ST

Timeline

  1. July 28, 2026

    Appeal Period: Completed

  2. July 17, 2026

    Review Complete: Completed

  3. July 17, 2026

    DR: Complete

  4. June 30, 2026

    DR: In Review

  5. June 30, 2026

    Assign Reviewers: Completed

  6. June 30, 2026

    Fee Payment: Payment Received

  7. June 30, 2026

    Prescreen Review: Passed

  8. June 29, 2026

    Prescreen Review: In Progress

  9. June 29, 2026

    Application Submittal: ePlanReview

  10. June 29, 2026

    Application filed

Documents

Plans

  • Civil engineering demolition plan sheets prepared by Bailey Engineering, Inc. for a zoning certificate, dated June 30, 2026.

    July 2, 2026 · 2 pages · 6.6 MB · PDS-Maps and Drawings

    Download Site demolition plans, pages 6-30

Project narrative

  • Cover letter describing the planned demolition of a two-building commercial structure, including asbestos abatement, utility disconnection, phased demolition methods, dust control, and site grading.

    July 2, 2026 · 2 pages · 391 KB · PDS-Letter of Intent

    Download Letter of intent for building demolition

Decisions

  • Action letter approving demolition of two single-story commercial buildings, with conditions on permits, site stabilization, right-of-way work, and tree protection.

    July 17, 2026 · 2 pages · 176 KB · PDS-Action Letter

    Download Zoning certificate and demolition approval action letter

Notices

  • Planning and Development Services notice that a Zoning Certificate for demolishing two commercial buildings in the MX-2 zone has been approved, with a deadline to appeal by July 27, 2026.

    July 15, 2026 · 2 pages · 732 KB · PDS-Legal Notice

    Download Notice of approval for zoning certificate demolition

Application

  • Zoning certificate application for demolition of vacant buildings on a 1.35-acre MX-2 zoned parcel, filed by Biltmore Co for the property owner, with a submittal checklist.

    June 29, 2026 · 3 pages · 206 KB · PDS-Application

    Download Zoning certificate application for demolition

Photos

  • Eight site photographs dated June 30, 2026, submitted with the zoning certificate application.

    July 2, 2026 · 8 pages · 6.0 MB · PDS-Photos

    Download Site photos

Correspondence

  • Idaho Department of Environmental Quality general comments on air quality, wastewater and recycled water rules, and related permitting for the demolition permit application.

    July 20, 2026 · 4 pages · 709 KB · PDS-Agency Comments

    Download Idaho DEQ general comments
  • The Boise Fire Department reports no comments on the zoning certificate review, noting building code requirements will be addressed at the building permit stage.

    July 16, 2026 · 1 page · 151 KB · PDS-Agency Comments

    Download Boise Fire Department comments
  • Boise Parks and Recreation asks the applicant for an arborist assessment of at least five removed mature trees and a replacement planting schedule.

    July 16, 2026 · 1 page · 244 KB · PDS-Agency Comments

    Download Parks Department comments on tree removal and mitigation
  • Public Works says new plumbing fixtures must connect to the central sanitary sewer, which is available, and sewer capacity fees may be due at building permit issuance.

    July 16, 2026 · 1 page · 65 KB · PDS-Agency Comments

    Download Public Works sewer comments

Other documents

  • Noticing radius map

    July 15, 2026 · 662 KB · PDS-Maps and Drawings

  • Agency transmittal

    July 10, 2026 · 131 KB · PDS-Transmittal Agencies

  • Statement of legal interest

    July 2, 2026 · 54 KB · PDS-Statement of Legal Interest

  • Receipt

    June 30, 2026 · 134 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.