Skip to content

Planning project · Planning application

Four-story parking structure with ground-floor commercial space approved

The Design Review Commission approved the proposed parking garage, about 102,000 square feet on roughly 10 acres, with leasing office, cafe and fitness space at street level. The decision was made Oct. 9.

ApprovedPLN25-00432Filed May 19, 2025West End · 3150 W Main St+6 related filings
Site plan for Four-story parking structure with ground-floor commercial space approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

A parking structure with ground-floor commercial space

Project name on file: 3150 W MAIN ST

Timeline

  1. Oct. 13, 2026

    7 documents added

  2. Oct. 9, 2025

    Planning Applications: Project Entitled

  3. Aug. 6, 2025

    Pending Application Submittal: Planning Applications in Review

  4. Aug. 4, 2025

    IDR Review Complete: IDR Waived

    An IDR meeting for the overall development was previously held on March 28, 2024. A check in meeting with the applicant team, Planning, Fire, and Solid Waste was held on July 1, 2025. See notes in the Documents tab.

  5. July 29, 2025

    Neighborhood Meeting Review: Completed

  6. June 26, 2025

    Concept Review Complete: CR Complete - Type 3

  7. June 6, 2025

    Concept Review Complete: Corrections Required

    Please provide a copy of the site plan for the project. The current document labeled “project building site plan” contains building renderings instead of a site plan.

  8. May 19, 2025

    Application Submittal: Online

  9. May 19, 2025

    Application filed

Documents

Site plans

Renderings

  • Four-page set of PDF renderings of the parking structure; the extracted text is mostly garbled and does not describe the views in detail.

    May 19, 2025 · 4 pages · 1.8 MB · PDS-Other Small Docs

    Download Parking structure renderings

Plans

Project narrative

  • Planner's advisory summary for a proposed 4-story parking structure with ground-floor commercial space, covering MX-5 form standards, required Design Review work session, and an EV parking variance request.

    June 26, 2025 · 3 pages · 456 KB · PDS-Concept Review Summary Report

    Download Concept review summary report

Notices

  • Invitation from the applicant's representative to a July 7, 2025 neighborhood meeting on a proposed parking garage and retail building with a design review application, plus a site plan and mailing list.

    July 29, 2025 · 23 pages · 20.2 MB · PDS-Neighborhood Meeting

    Download Neighborhood meeting notice for July 7 meeting

Application

  • Application for a parking garage with some retail frontage in the MX-5 zone, filed by Ahlquist on behalf of the College of Western Idaho.

    May 19, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.