Assured water supply · Planning application
Water supply application for 160-acre mixed-use and industrial subdivision on hold
The city returned the application to the applicant, so it is on hold. It was filed March 9 and covers a proposed subdivision with mixed-use and industrial uses on land that is currently undeveloped.

From the filing
The application's description as it appears in City of Boise's record. See the official record
160 acre mixed-use and industrial subdivision
Project name on file: 6310 S ORCHARD ST
Timeline
July 8, 2026
Prescreen Review: Corrections Required
Please upload all documents as separate PDF files.
March 9, 2026
Application Submittal: In Office
March 9, 2026
Application filed
Documents
Site plans
- Download Preliminary plat cover sheet, Innovator Subdivision
Cover sheet for the preliminary plat of Innovator Subdivision, dated December 2025 and revised January 30, 2026, showing the plat's sheet index and vicinity map.
March 9, 2026 · 6 pages · 3.2 MB · PDS-Other Small Docs
Application
- Download Assured water supply application form
Application form for an assured water supply review covering a 160-acre mixed-use and industrial subdivision, with the agent, applicant and owner contact details listed.
March 9, 2026 · 2 pages · 156 KB · PDS-Application
- Download Assured Water Supply Application B form
Blank-style city form for developments within a water district's service area, with a PLN, applicant type and contact section partly filled in for a Boise project.
March 9, 2026 · 10 pages · 313 KB · PDS-Other Small Docs
Correspondence
- Download Veolia water serviceability letter
Veolia states the parcels are serviceable under its current tariffs, requires developer-funded mains and facilities under a written agreement, and says the letter expires after twelve months.
March 9, 2026 · 1 page · 259 KB · PDS-Other Small Docs
Other documents
- Download Exhibit B-1 vicinity map
One-page vicinity map at roughly 1 inch to 1,000 feet, generated from landproDATA with coordinates shown and a disclaimer that it is informational only.
March 9, 2026 · 1 page · 7.5 MB · PDS-Other Small Docs
- Download Exhibit C-3
March 9, 2026 · 42 KB · PDS-Other Small Docs
