Skip to content

Design review · Planning application

20,000-square-foot industrial building approved with conditions

The Design Review Commission approved the single-story building on 2.35 acres on Oct. 14. It would house a precision machining company and two other tenant spaces. Conditions cover driveway closure, sidewalks, landscaping and a non-white roof.

ApprovedDRH26-00249Filed July 28, 2026South Eisenman · 6651 S Eisenman Rd+3 related filings
Site plan for 20,000-square-foot industrial building approved with conditions
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The applicant proposes a new single-story industrial building of about 20,000 square feet at 6651 S Eisenman Rd in Boise. It would sit on a roughly 2.35-acre lot in a light industrial zone and house a precision machining company plus two additional tenant spaces. Plans include parking, new landscaping and a detached sidewalk along the street.

Industrial building

Project name on file: 6651 S EISENMAN RD

Timeline

  1. Two days ago

    Status changed from In review to Approved

    Reported as “Approved”.

  2. Two days ago

    Document added: PDS-Action Letter - ACTION LETTER FOR THE OCTOBER 14, 2026 DESIGN REVIEW HEARING

  3. Oct. 15, 2026

    Document added: PDS-Agency Comments - ACHD COMMENTS

  4. Oct. 14, 2026

    Status changed from Hearing scheduled to In review

    Reported as “In Review”.

  5. Oct. 14, 2026

    Decision: Approved

    Hearing marked “Approved” on 2026-10-14.

  6. Oct. 14, 2026

    Hearing: Approved

  7. Oct. 14, 2026

    Public hearing: Design Review Commission

    Outcome: Approved.

  8. Sept. 29, 2026

    Review Complete: Completed

  9. Sept. 29, 2026

    DR: Complete

  10. Aug. 20, 2026

    DR: In Review

  11. Aug. 20, 2026

    Assign Reviewers: Completed

  12. July 29, 2026

    Fee Payment: Payment Received

  13. July 29, 2026

    Prescreen Review: Passed

  14. July 28, 2026

    Prescreen Review: In Progress

  15. July 28, 2026

    Application Submittal: ePlanReview

  16. July 28, 2026

    Application filed

Documents

Site plans

  • Updated site plan for a 2.35-acre parcel in Gowen Business Park showing a 20,378 sq ft building, 28 parking stalls including 2 accessible, and site coverage and paving areas.

    Oct. 5, 2026 · 1 page · 2.8 MB · PDS-Maps and Drawings

    Download Site plan, updated Oct. 5
  • Site plan sheet listing parcel and legal description details, owner and architect information, parking stall counts, and site coverage areas for a Design Review application.

    Aug. 26, 2026 · 1 page · 3.0 MB · PDS-Maps and Drawings

    Download Site plan with parking and site area data

Renderings

Plans

  • Civil site plan sheet showing lot layout, proposed detached sidewalk and landscape planter, retaining walls, storm drain and utility features, prepared by Smith Civil.

    Aug. 26, 2026 · 1 page · 3.1 MB · PDS-Maps and Drawings

    Download Site plan, sheet C1.2
  • Architectural elevation drawings for the east and west sides at 1/8 inch scale, with a numbered key of exterior finishes such as metal panels, storefront windows, overhead doors and stone veneer.

    Aug. 26, 2026 · 1 page · 911 KB · PDS-Maps and Drawings

    Download East and west building elevations with material notes
  • North and south building elevations with material and color call-outs for awning, wall panels, storefront windows, overhead and man doors, roof, and coping.

    Aug. 26, 2026 · 1 page · 564 KB · PDS-Maps and Drawings

    Download Building elevations with notes
  • Overall floor plan by Ramp Engineering showing warehouse areas 100, 200 and 300 with office and restroom spaces, dimensions, and general construction notes.

    Aug. 26, 2026 · 1 page · 501 KB · PDS-Maps and Drawings

    Download Floor plan, overall warehouse and office layout
  • Landscape plan sheet showing the planting schedule for trees, shrubs and groundcovers, plus the legend for turf, native seed, boulders, bike rack and mulch areas.

    Aug. 26, 2026 · 1 page · 1.3 MB · PDS-Maps and Drawings

    Download Landscape plan, sheet L1.01
  • Sheet L1.02 of the landscape plans, showing the landscape legend, a plant schedule of deciduous trees and shrubs, and planting and surface notes for the site.

    Aug. 26, 2026 · 1 page · 1.2 MB · PDS-Maps and Drawings

    Download Landscape plan, sheet L1.02
  • Sheet of landscape details covering planting soil requirements, tree protection measures for trees to remain, and planting specifications.

    Aug. 26, 2026 · 1 page · 772 KB · PDS-Maps and Drawings

    Download Landscape details and planting notes
  • Sheet of general landscape notes covering grading coordination, plant material standards (ANSI Z60.1), substitutions, and planting requirements.

    Aug. 26, 2026 · 1 page · 1.1 MB · PDS-Maps and Drawings

    Download Landscape specifications and general notes
  • Architectural drawing sheet showing the trash enclosure plan view and elevations with keynotes on materials such as concrete, steel posts, bollards and formed metal wall panels.

    Aug. 26, 2026 · 1 page · 847 KB · PDS-Maps and Drawings

    Download Trash enclosure plan and elevations, sheet A-1.2
  • Sign-in sheet from a July 15, 2026 meeting for the Ramp Engineering Building project, with mostly blank entries and some handwritten names.

    Aug. 26, 2026 · 1 page · 259 KB · PDS-Other Small Docs

    Download Meeting sign-in sheet

Project narrative

  • Architect's letter clarifying the single-story 20,000 sq. ft. building is fully sized at that total, with Ramp Engineering occupying 10,000 sq. ft. and two 5,000 sq. ft. speculative tenant spaces.

    Aug. 26, 2026 · 2 pages · 858 KB · PDS-Letter of Intent

    Download Letter of intent clarifying building use and tenant space

Staff reports

  • Staff report recommending approval of a roughly 20,000 square-foot industrial building, with conditions on screening, lighting and agency requirements.

    Oct. 7, 2026 · 42 pages · 19.4 MB · PDS-Project Report/Memo

    Download Project report for the Oct. 14 design review hearing

Decisions

Notices

  • Public hearing notice for an approximately 20,000 square-foot industrial building proposal on 2.35 acres in a light industrial zone, with planner contact details.

    Sept. 25, 2026 · 2 pages · 907 KB · PDS-Legal Notice

    Download Notice of the Oct. 14 Design Review Commission public hearing
  • Applicant's summary of the Aug. 26 neighborhood meeting for a light industrial building: one attendee, no feedback received, and site, landscape and mobility plans shared.

    Aug. 26, 2026 · 2 pages · 115 KB · PDS-Neighborhood Meeting

    Download Neighborhood meeting summary form
  • Invitation to a July 15, 2026 neighborhood meeting on a proposed single-story, 20,000-square-foot commercial and light industrial building, held before a Design Review application is filed.

    Aug. 26, 2026 · 2 pages · 123 KB · PDS-Other Small Docs

    Download Neighborhood meeting invitation notice for Ramp Engineering building
  • Radius mailing list of 32 property owners and tenants notified for the neighborhood meeting on this Design Review application, dated June 22, 2026.

    Aug. 26, 2026 · 2 pages · 34 KB · PDS-Other Small Docs

    Download Neighborhood meeting mailing list

Application

  • Design review application for a 20,000 sq ft commercial building on a 2.35-acre I-1 zoned property, filed by ADP Architects for the owner Scott Ventures LLC.

    Aug. 26, 2026 · 6 pages · 227 KB · PDS-Application

    Download Design review application for commercial building
  • Design review application for a 20,000 sq ft commercial building on a 2.35-acre I-1 zoned property, filed by ADP Architects for the owner Scott Ventures LLC.

    July 28, 2026 · 6 pages · 227 KB · PDS-Application

    Download Design review application for commercial building

Photos

  • Signed statement confirming the property was posted at least fifteen days before the scheduled Design Review hearing, with photographs of the posting attached.

    Sept. 30, 2026 · 1 page · 324 KB · PDS-Other Small Docs

    Download Statement of site posting for Design Review
  • Three pages of site photographs showing views looking north, west, south, and east across the property.

    Aug. 26, 2026 · 3 pages · 290 KB · PDS-Photos

    Download Site photos

Correspondence

  • ACHD staff approval for a 20,000 square-foot multi-tenant commercial building design review, covering trip generation, level of service, planned roadway improvements and conditions.

    Oct. 15, 2026 · 12 pages · 594 KB · PDS-Agency Comments

    Download Ada County Highway District comments
  • Letter notifying the applicant that the design review application is scheduled for the Oct. 14, 2026 hearing, with posting and report deadlines.

    Sept. 25, 2026 · 1 page · 80 KB · PDS-Correspondence

    Download Notification letter for the Oct. 14 Design Review Commission hearing
  • Airport coordinator's comments: an avigation easement is already on file, the site lies in airport influence area B with a 30 dB noise reduction requirement, and residential use and upward-directed lighting are…

    Sept. 24, 2026 · 1 page · 221 KB · PDS-Agency Comments

    Download Airport comments on design review
  • Public Works conditions requiring a stormwater management plan before permits and private street testing and construction to public street standards.

    Sept. 24, 2026 · 1 page · 134 KB · PDS-Agency Comments

    Download Hillside and drainage conditions from Public Works
  • Parks and Recreation, with Community Forestry, has no comments; it finds the landscape plan complete and the new tree plant schedule acceptable.

    Sept. 24, 2026 · 1 page · 58 KB · PDS-Agency Comments

    Download Boise Parks and Recreation comments
  • Public Works environmental staff comments on preventing hazardous materials, process wastewater and stormwater from entering sanitary sewer or stormwater facilities, and on floor drain interceptors.

    Sept. 24, 2026 · 1 page · 15 KB · PDS-Agency Comments

    Download Public Works pretreatment comments
  • Public Works says connection to central sanitary sewer is required, notes an existing sewer easement where no permanent structures may be built, and warns that sewer capacity fees may apply at building permit.

    Sept. 24, 2026 · 1 page · 65 KB · PDS-Agency Comments

    Download Public Works sewer comments
  • Public Works solid waste staff ask that the trash enclosure be revised to provide minimum interior dimensions of 18 by 12 feet, and link to enclosure design standards.

    Sept. 24, 2026 · 1 page · 107 KB · PDS-Agency Comments

    Download Solid Waste comments
  • Public Works requires street lights at specified locations, with metered service, LED fixtures to city standards, and licensed electrical work.

    Sept. 24, 2026 · 2 pages · 163 KB · PDS-Agency Comments

    Download Public Works street light comments
  • Water provider letter reporting system pressure of 70 PSI at average demand and 2500 GPM at 20 PSI residual at a nearby hydrant, for fire sprinkler design.

    Aug. 26, 2026 · 1 page · 111 KB · PDS-Other Small Docs

    Download Veolia Water fire flow availability letter

Other documents

  • Aerial map

    Sept. 25, 2026 · 1.4 MB · PDS-Maps and Drawings

  • Land use map

    Sept. 25, 2026 · 273 KB · PDS-Maps and Drawings

  • Noticing radius map

    Sept. 25, 2026 · 544 KB · PDS-Maps and Drawings

  • Zoning map

    Sept. 25, 2026 · 407 KB · PDS-Maps and Drawings

  • Transmittal sheet

    Sept. 4, 2026 · 137 KB · PDS-Transmittal Agencies

  • Statement of legal interest

    Aug. 26, 2026 · 204 KB · PDS-Statement of Legal Interest

  • Submittal checklist

    Aug. 26, 2026 · 894 KB · PDS-Submittal Checklist

  • Fee receipt

    July 29, 2026 · 131 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.