Skip to content

Planning project · Planning application

20,000-square-foot industrial building with three tenant spaces approved

The Design Review Commission approved a one-story-plus building on a 2.35-acre vacant site zoned for industrial use. It would be split into one 10,000-square-foot space and two 5,000-square-foot spaces. The decision came Oct. 15.

ApprovedPLN26-00476Filed May 18, 2026South Eisenman · 6651 S Eisenman Rd+3 related filings
Site plan for 20,000-square-foot industrial building with three tenant spaces approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Industrial Building

Project name on file: 6651 S EISENMAN RD

Timeline

  1. Oct. 15, 2026

    Status changed from In review to Approved

    Reported as “Project Entitled”.

  2. Oct. 15, 2026

    Approved

  3. Oct. 15, 2026

    Planning Applications: Project Entitled

  4. July 28, 2026

    Pending Application Submittal: Planning Applications in Review

  5. July 17, 2026

    IDR Review Complete: IDR Waived

  6. July 17, 2026

    Neighborhood Meeting Review: Completed

  7. July 17, 2026

    Concept Review Complete: Generate AWS

  8. June 17, 2026

    Concept Review Complete: CR Complete - Type 3

  9. May 29, 2026

    Concept Review Complete: Corrections Required

    Please upload a project description that provides clarification on the use. Is Ramp Engineering stricly an office use? Please specify the square footage dedicated to the office use, and the square footage that will be vanilla TI.Please also clarify if this is a two story or one story building. The drawing state that it is 2991 sq. ft, but your application indicates 20,000 sq. ft.

  10. May 18, 2026

    Application Submittal: Online

  11. May 18, 2026

    Application filed

Documents

Site plans

  • Applicant's record of a single-attendee neighborhood meeting held 7/16/20, listing shared drawings (site, landscape, mobility plans) and reporting no feedback received.

    July 16, 2026 · 2 pages · 115 KB · PDS-Other Small Docs

    Download Neighborhood meeting summary form
  • Civil site plan sheet showing lot layout, proposed sidewalks and landscape planter, retaining walls, storm drain, and utilities, with existing features to be removed.

    May 18, 2026 · 1 page · 3.1 MB · PDS-Other Small Docs

    Download Civil site plan
  • Site plan sheet showing existing storm drain and sewer manholes with rim and invert elevations, utility easements, and a curve data table for Gowen Business Park No. 3.

    May 18, 2026 · 1 page · 2.1 MB · PDS-Other Small Docs

    Download Site plan with existing utilities and curve table

Plans

  • Sheet of landscape details covering planting soil requirements, tree protection measures for trees to remain, and planting schedule notes.

    July 16, 2026 · 1 page · 772 KB · PDS-Other Small Docs

    Download Landscape details and planting soil notes
  • Landscape plan sheet with a legend, plant schedule listing deciduous trees and shrubs, and planting and irrigation notes for the site.

    July 16, 2026 · 1 page · 1.2 MB · PDS-Other Small Docs

    Download Landscape plan
  • Landscape plan sheet with a legend, plant schedule for deciduous trees, shrubs and groundcovers, and planting and hardscape notes, prepared by South Beck & Baird Landscape Architecture P.C.

    July 16, 2026 · 1 page · 1.3 MB · PDS-Other Small Docs

    Download Landscape plan
  • General landscape notes covering grading coordination, contractor responsibilities, utility locating, plant material standards (ANSI Z60.1), and substitutions.

    July 16, 2026 · 1 page · 1.1 MB · PDS-Other Small Docs

    Download Landscape specifications and general notes
  • Architectural drawing set showing north, south, east and west building elevations at 1/32 inch scale, prepared by ADP Architects for a new facility.

    May 18, 2026 · 1 page · 496 KB · PDS-Other Small Docs

    Download Building elevations, sheet A-3.0
  • Architectural floor plan for a new facility, showing rooms such as offices, a break room, a compressor room, a riser room and open areas, drawn at 1/32 inch scale.

    May 18, 2026 · 1 page · 224 KB · PDS-Other Small Docs

    Download Floor plan, sheet A-2.0

Project narrative

  • Advisory concept review summary covering a proposed 20,000 sq. ft. commercial building with three tenant spaces, with notes on access, parking, zoning and required Design Review.

    June 17, 2026 · 3 pages · 474 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Architect's letter clarifying the building's 20,000 sq. ft. total area, owner-occupant space, two speculative tenant spaces, and building summary.

    May 30, 2026 · 2 pages · 140 KB · PDS-Other Small Docs

    Download Project description narrative letter

Notices

  • Invitation from the architect to a July 15, 2026 neighborhood meeting on a proposed single-story commercial and light industrial building for Ramp Engineering, required before a Design Review application.

    July 16, 2026 · 2 pages · 123 KB · PDS-Other Small Docs

    Download Neighborhood meeting invitation notice
  • Mailing list of property owners and tenants within a 500-foot radius, prepared for the neighborhood meeting notice; it lists owner names and addresses.

    July 16, 2026 · 2 pages · 34 KB · PDS-Other Small Docs

    Download Neighborhood meeting mailing list

Application

  • Application for a new 20,000 sq ft building for Ramp Engineering plus two Vanilla Suites in an I-1 zoning district, submitted by ADP Architects for owner Scott Ventures LLC.

    May 18, 2026 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form

Other documents

  • Attendee sign-in sheet

    July 16, 2026 · 259 KB · PDS-Other Small Docs

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.