Skip to content

Planning project · Planning application

Facade update for jewelry store approved, with new brick and storefront windows

The city approved design review on Aug. 14 for exterior changes to an existing retail store: new brick veneer, new storefront windows on the north side and a small entrance vestibule on the east. Interior work is also planned.

ApprovedPLN26-00519Filed May 28, 2026Downtown Boise · 921 W Jefferson St+1 related filing
Site plan for Facade update for jewelry store approved, with new brick and storefront windows
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Facade enhancements

Project name on file: 921 W JEFFERSON ST - DRH minor

Timeline

  1. Aug. 14, 2026

    Planning Applications: Project Entitled

  2. July 17, 2026

    Pending Application Submittal: Planning Applications in Review

  3. June 23, 2026

    Concept Review Complete: CR Complete - Type 2

  4. May 28, 2026

    Application Submittal: Online

  5. May 28, 2026

    Application filed

Documents

Site plans

  • Existing conditions site plan showing parking, sidewalks, curb cuts, drainage, and structures, prepared by Michael Hsu Office of Architecture.

    May 28, 2026 · 1 page · 49 KB · PDS-Other Small Docs

    Download Existing site plan
  • Site plan keyed to numbered notes covering curb cut, paving replacement with vehicle-rated pavers, planter areas, accessible parking stall and aisle, and entry canopy.

    May 28, 2026 · 1 page · 234 KB · PDS-Other Small Docs

    Download Proposed site plan with keyed notes

Renderings

  • Isometric rendering labeled View 1, prepared by Michael Hsu Office of Architecture.

    May 28, 2026 · 1 page · 190 KB · PDS-Other Small Docs

    Download 3D view 1
  • Isometric rendering labeled View 2, prepared by Michael Hsu Office of Architecture.

    May 28, 2026 · 1 page · 200 KB · PDS-Other Small Docs

    Download 3D view 2
  • Isometric rendering of the interior, labeled as view 1, with the Michael Hsu Office of Architecture credit and a Hal Davis Jewelers reference.

    May 28, 2026 · 1 page · 277 KB · PDS-Other Small Docs

    Download Interior isometric view 1
  • Isometric rendering of the interior, labeled Isometric View 2, prepared by Michael Hsu Office of Architecture for Hal Davis Jewelers.

    May 28, 2026 · 1 page · 279 KB · PDS-Other Small Docs

    Download Interior isometric view 2
  • Front elevation rendering of the proposed building, prepared by Michael Hsu Office of Architecture, showing Hal Davis Jewelers signage.

    May 28, 2026 · 1 page · 312 KB · PDS-Other Small Docs

    Download Front elevation rendering, sheet 1
  • Architectural rendering from Michael Hsu Office of Architecture, one page, showing the proposed design for the project.

    May 28, 2026 · 1 page · 248 KB · PDS-Other Small Docs

    Download Rendering, revision 2
  • Architectural rendering of the entry elevation, prepared by Michael Hsu Office of Architecture for Hal Davis Jewelers.

    May 28, 2026 · 1 page · 283 KB · PDS-Other Small Docs

    Download Rendering, entry elevation (sheet 3)
  • Architectural rendering image from Michael Hsu Office of Architecture; the extracted text is mostly illegible, with a Hal Davis Jewelers label visible.

    May 28, 2026 · 1 page · 281 KB · PDS-Other Small Docs

    Download Rendering 4

Plans

  • Existing interior layout of the Hal Davis Jewelers space, showing showcases, displays, cashier counter, vault, offices and a V.I.P. room, prepared by Michael Hsu Office of Architecture.

    May 28, 2026 · 1 page · 99 KB · PDS-Other Small Docs

    Download Existing interior floor plan
  • Floor plan of the proposed interior layout, numbering entry, lounge, jewelry, bridal, vault and customer service areas, with watch brand boutiques labeled by square footage.

    May 28, 2026 · 1 page · 242 KB · PDS-Other Small Docs

    Download Proposed interior plan

Project narrative

  • Planner's advisory summary of a May 22, 2026 concept review for exterior and interior tenant improvements to an existing retail jewelry store, including a west-side entry requirement.

    June 23, 2026 · 2 pages · 462 KB · PDS-Concept Review Summary Report

    Download Concept review summary for minor design review

Application

  • Application for interior and exterior tenant improvements for Hal Davis Jeweler, including new brick veneer siding, north-side storefront windows, and a small east-side entrance.

    May 28, 2026 · 2 pages · 159 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.