Nine-building storage facility approved in Eagle

LZL Ventures, LLC won design review approval from Eagle City Council on July 22 for nine one-story enclosed storage buildings totaling about 205,000 square feet on a 9.81-acre site. Conditions include a revised landscape plan with at least 10% landscaping, removal of certain perimeter fencing, and tree mitigation…

ApprovedDR-2025-34Central Eagle · 9551 North Horseshoe Bend Road
The county's parcel map doesn't list the filing's address; the pin is where an address lookup puts it.

From the filing

The application's description as it appears in City of Eagle's record. See the official record

LZL Ventures proposes nine enclosed self-storage buildings totaling 205,000 square feet on a 9.81-acre site on the west side of North Horseshoe Bend Road, south of West Hill Road in Eagle. The one-story buildings would be built in three phases, with 206 parking spaces and all 58 existing trees removed.

LZL Ventures, LLC, represented by Connor Lindstrom with KM Engineering, LLP, is requesting design review approval to construct a storage facility with 9-enclosed buildings totaling 205,000-square feet. The 9.81-acre site is located on the west side of North Horseshoe Bend Road, approximately 390-feet south of West Hill Road at 9551 and 9557 North Horseshoe Bend Road.

Project name on file: Storage Facility (Enclosed Buildings)

Timeline

  1. July 22, 2025

    Approved

    Eagle City Council: Approved on its consent agenda.

Documents

Staff reports

  • City staff report recommending conditional approval of a 9-building, 205,000-square-foot enclosed storage facility, with site-specific and standard conditions.

    July 21, 2025 · 144 pages · 182.1 MB

    Download Design review staff report for storage facility

Decisions

  • Eagle Design Review Board findings from the June 26, 2025 action approving or addressing a nine-building enclosed storage facility on a 9.81-acre site.

    July 9, 2025 · 21 pages · 384 KB · Decision

    Download Design review findings of fact and conclusions of law

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample