Skip to content

Development review · Planning application

Two-story, 23,029-square-foot industrial building approved with conditions

Staff approved the design on Jan. 5 for a concrete tilt-up building with offices, a shop and an outdoor storage yard on 1.82 acres. Conditions cover a full landscape and irrigation plan, shielded lighting and a 25-foot limit on light pole height.

ApprovedDR-00426-2025Filed Dec. 31, 2025North Nampa · 1445 E Fargo Ave+2 related filings
Site plan for Two-story, 23,029-square-foot industrial building approved with conditions
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

A new 23,029-square-foot light industrial building with an office, shop and outdoor laydown yard on E Fargo Ave in Nampa. The concrete tilt-up building would sit on a 1.82-acre site in a light industrial zone. Staff approved the building design on January 5, 2026.

New 23,029 sf industrial building with associated site improvements.

Timeline

  1. Jan. 5, 2026

    Decision/Action Letter

  2. Jan. 5, 2026

    12 documents added

  3. Jan. 5, 2026

    Planning Staff Decision

  4. Jan. 5, 2026

    Decision: Approved with Conditions

  5. Jan. 5, 2026

    P&Z Planner Review

  6. Jan. 2, 2026

    Assess Fees (Building & Site)

  7. Jan. 2, 2026

    Planning Application Review

  8. Dec. 31, 2025

    Application filed

Documents

Site plans

  • Preliminary site plan sheet with general coordination notes, drainage approach, and keynoted items such as bollards, dock door, hydrant, water service, electrical gear, and paving.

    Dec. 31, 2025 · 1 page · 3.6 MB · Site Plan

    Download Architectural site plan with general notes and keynotes

Renderings

  • Sheet A200 shows four exterior views of the new industrial building from each corner, with a finishes legend, paint and glazing schedule, and wall area table.

    Dec. 31, 2025 · 1 page · 4.7 MB · Building Finishes

    Download Exterior building views with finishes legend

Plans

  • Architectural ground floor plan for the industrial building, showing office, warehouse and restroom layout, prepared by Steele Architecture and marked preliminary for design review.

    Dec. 31, 2025 · 1 page · 951 KB · Other

    Download Ground floor plan, sheet A111
  • Architectural upper floor plan showing office layouts, room numbers and square footages, prepared by Steele Architecture with a December 31, 2025 design review revision.

    Dec. 31, 2025 · 1 page · 864 KB · Other

    Download Upper floor plan
  • Elevation sheet for the building's east side with exterior finish notes, keyed notes for concrete panels, reveals, bollards, canopies and doors, and future knockout openings.

    Dec. 31, 2025 · 1 page · 1.7 MB · Building Elevations

    Download Exterior building elevations, east side
  • Memo noting that the industrial landscape plan is to be provided with the building permit submittal.

    Dec. 31, 2025 · 1 page · 266 KB · Landscaping Plan

    Download Landscape plan memo

Project narrative

  • Applicant's narrative describing the proposed 23,029 sq ft tilt-up concrete industrial building, its exterior finishes, entrance, parking, storage yard and fencing.

    Dec. 31, 2025 · 2 pages · 127 KB · Narrative

    Download Design review narrative for industrial building

Decisions

  • Staff approval of a 23,029 s.f. tilt-up industrial office/shop building in the IL district, subject to landscape plan, exterior lighting, and general code compliance conditions.

    Jan. 5, 2026 · 6 pages · 10.4 MB · Decision Letter_Jan2026

    Download Design review decision letter with conditions of approval

Other documents

  • Affidavit of legal interest

    Dec. 31, 2025 · Affidavit of Legal Interest

  • Legend listing exterior paint colors P-1 through P-4 (Sherwin-Williams) plus black anodized storefront and window framing, low-E glazing, and pre-finished black coping and light fixtures.

    Dec. 31, 2025 · 1 page · 197 KB · Color Samples

    Download Exterior finishes legend with paint and material color samples
  • Master application form

    Dec. 31, 2025 · Checklist & Master Application

  • Vicinity map

    Dec. 31, 2025 · Vicinity Map

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.