Skip to content

Subdivision · Planning application

Split of 1.29-acre industrial parcel into two lots approved with conditions

The City Council approved the short plat on July 28, creating lots of about 0.82 and 0.47 acres for separate ownership. Lot 2 must get a shared access easement across Lot 1. No buildings are proposed yet.

ApprovedSPS-00067-2026Filed May 21, 2026North Nampa · E Karcher Rd+2 related filings
Site plan for Split of 1.29-acre industrial parcel into two lots approved with conditions
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

The applicant wants to split a vacant 1.29-acre light industrial parcel on East Karcher Road in Nampa into two lots, one of about 0.82 acres and one of about 0.47 acres. The split would allow separate ownership and future development of each lot. No buildings or zoning changes are proposed now.

Short plat to divide an industrial lot into 2 lots.

Timeline

  1. Aug. 4, 2026

    28 documents added

  2. Aug. 4, 2026

    City Council Decision/Action Letter

  3. Aug. 4, 2026

    P&Z Commision Decision/Action Letter

  4. Aug. 4, 2026

    Notice to Area Property Owners

  5. July 28, 2026

    Decision: Approved with Conditions

    Nampa Planning and Zoning Commission: Approved with Conditions.

  6. July 28, 2026

    Public hearing: Nampa Planning and Zoning Commission

  7. July 1, 2026

    Property Postings

  8. June 25, 2026

    Notice to Agencies/Departments

  9. June 25, 2026

    Notify Applicant

  10. June 23, 2026

    GIS Addressing

  11. June 22, 2026

    Assess Fees (Subdivision)

  12. May 28, 2026

    Plan Intake Passed

  13. May 28, 2026

    Accepted for review

  14. May 21, 2026

    Application filed

Documents

Site plans

  • Preliminary plat for Devlin Subdivision No. 2 showing three total lots, including two residential lots and one common area lot, with site data, zoning and setbacks.

    Aug. 4, 2026 · 1 page · 1.2 MB · Preliminary plat updated 07-23-2026

    Download Preliminary plat updated 07-23-2026
  • Preliminary plat sheet for a three-lot subdivision (two residential lots, one common area lot) on about 1.91 acres, with site info, owner and surveyor details, and notes.

    May 21, 2026 · 1 page · 1.1 MB · Prelim Plat

    Download Preliminary plat, Devlin Subdivision No. 2

Plans

  • Updated final plat legal description for a 1.29-acre parcel, part of Lot 1, Block 1 of Devlin Subdivision, with revised boundary dimensions.

    Aug. 4, 2026 · 3 pages · 440 KB · Final plat updated 07-23-2026

    Download Final plat, Devlin Subdivision No. 2 (updated 07-23-2026)
  • Final plat for a 1.29-acre parcel carved from Lot 1, Block 1 of Devlin Subdivision in the City of Nampa, with boundary metes and bounds and revised dimensions noted.

    May 21, 2026 · 3 pages · 440 KB · Final Plat

    Download Devlin Subdivision No. 2 final plat
  • Planning department checklist, sent to the applicant on 5/7/2026, listing the short plat submittal items not required for this application, including the waived proposed building elevations.

    May 21, 2026 · 1 page · 284 KB · Building Elevations - waived

    Download Short plat checklist with waived building elevations
  • City of Nampa checklist listing the submittal items for a short subdivision plat, including the landscape plan waiver and fee schedule.

    May 21, 2026 · 1 page · 284 KB · Landscape Plans - waived

    Download Short plat checklist with landscape plan exception

Project narrative

  • Narrative requesting approval to divide one vacant commercially zoned parcel into two lots for separate ownership, with access from the adjacent road and existing utilities.

    May 21, 2026 · 1 page · 24 KB · Narrative

    Download Project narrative for short plat
  • Planning and Zoning staff notes for the Rocky Mountain Cutting new steel shop, covering setbacks, landscape buffer, parking and sign requirements in the IL zone.

    May 21, 2026 · 6 pages · 4.8 MB · Pre-App Mtg Notes - P&Z 050526

    Download Pre-application property inquiry notes, revised May 2026

Staff reports

  • Planning staff report for the July 28, 2026 Planning and Zoning Commission hearing on a short plat creating two industrial lots in an IL zone, with applicable subdivision and lot-split regulations.

    July 22, 2026 · 21 pages · 5.9 MB · Staff Report for PZ

    Download Staff report for Devlin No. 2 short plat

Decisions

  • City of Nampa letter approving the Devlin No. 2 short plat for two industrial lots, with three conditions of approval, including a shared access easement and plat review comments.

    Aug. 4, 2026 · 10 pages · 3.7 MB · Decision Letter CC

    Download Short plat approval decision letter

Notices

  • Notice of a neighborhood meeting about the proposed subdivision plat, sent ahead of the application's review.

    May 21, 2026 · 61 KB · Neighborhood Mtg Notice

    Download Neighborhood meeting notice

Application

  • Master application form for a short plat to split a 1.29-acre industrial parcel into two industrial lots, filed with the City of Nampa.

    May 28, 2026 · 2 pages · 1.8 MB · Application

    Download Master application for Devlin No. 2 short subdivision plat
  • Filed annual report listing the entity's registered agent, managers and members, submitted as proof of the owner's authority to act on the application.

    May 28, 2026 · 1 page · 24 KB · Proof of Authority - Adler

    Download Idaho Secretary of State annual report for Adler AB Owner IX, LLC
  • Idaho Secretary of State annual report for Knorpp Properties, L.L.C., filed April 2026, listing its members and manager as evidence of signing authority.

    May 28, 2026 · 1 page · 25 KB · Proof of Authority - Knorpp as Buyer

    Download Proof of authority for Knorpp as buyer

Studies and reports

  • Checklist from the Planning and Zoning Department noting that a geotechnical/soil report is not required for this short plat application, with the standard submittal list and fees.

    May 21, 2026 · 1 page · 284 KB · Geotech/Soil Reports - waived

    Download Short plat checklist with geotechnical report exception

Correspondence

  • City letter refunding $500 in sewer and water model fees after the City Engineer determined the models were not required for the short plat.

    June 25, 2026 · 1 page · 177 KB · Refund letter

    Download Refund of sewer and water model fees
  • Development Engineering's revised notes on access via a shared cross access agreement, sewer tap or main extension, a fire hydrant lateral, and no floodplain note for the lot.

    May 21, 2026 · 1 page · 354 KB · Pre-App Mtg Notes - Engrg 050526

    Download Revised engineering notes for pre-application meeting

Other documents

  • Model fees refund request form

    Form for requesting a refund of part of an invoice for planning application fees.

    June 25, 2026 · Refund request for portion of invoice

  • Checklist exceptions list, No. 2

    June 22, 2026 · Available Online

  • Checklist No. 2

    June 22, 2026 · Available Online

  • Legal description of boundary

    May 21, 2026 · Legal Description Boundary - Word

  • Affidavit of legal interest

    May 21, 2026 · Affidavit Adler

  • Deposit receipt

    May 21, 2026 · Earnest Money Receipt

  • Neighborhood meeting sign-in sheet

    May 21, 2026 · Neighborhood Mtg Sign-In Sheet

  • New boundary legal description

    May 21, 2026 · Legal Description Boundary

  • Short plat checklist exception improvement drawings

    May 21, 2026 · Improv/Const Drawings

  • Short plat checklist exception for storm water report

    Records that the storm water report requirement was waived for this short plat application, per the checklist exception.

    May 21, 2026 · Storm Water Reports - waived

  • Vicinity map

    May 21, 2026 · Vicinity Map

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.