Skip to content

Subdivision · Planning application

Baron Properties seeks plat for five commercial warehouse lots

The 16.4-acre site would be split into five commercial lots for mixed-use warehouse buildings, to be built in phases. The application was filed May 13 and is void, so no decision is pending.

VoidSPF-00289-2025Filed May 13, 2025North Nampa · 15918 Star Rd+1 related filing
Site plan for Baron Properties seeks plat for five commercial warehouse lots
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Final Plat

Project name on file: 16 | 84 Commerce Center

Timeline

  1. May 13, 2025

    13 documents added

  2. May 13, 2025

    Application filed

Documents

Site plans

  • Engineering drawing sheet for a five-lot commercial subdivision plat, with land use summary, owner, developer and engineer contacts, and utility providers listed.

    May 13, 2025 · 4 pages · 8.6 MB · Preliminary Plat

    Download Final subdivision plat, Commerce Center

Plans

  • Four-page final plat sheets for the Commerce Center Subdivision, prepared by Bailey Engineering, Inc., with the licensed surveyor's stamp.

    May 13, 2025 · 4 pages · 1.6 MB · PDF Final Plat

    Download Final plat, Commerce Center Subdivision
  • Conceptual south and west exterior elevations for Building 2 with parapet and clear height dimensions, plus glazing coverage calculations of 10% and 26%.

    May 13, 2025 · 3 pages · 2.2 MB · Building Elevations

    Download Building 2 exterior elevations and glazing coverage
  • Notes that the frontage landscape plan is due by 5/23/25 and will be bonded for and completed with the Phase 1 site landscaping.

    May 13, 2025 · 1 page · 20 KB · Landscape Plans

    Download Frontage landscape submittal and bonding note
  • May 13, 2025 · 1 page · 16 KB · Open Space Exhibit

    Download Open space exhibit
  • Nine-page set of civil engineering drawings prepared by Bailey Engineering, Inc., marked not for construction, accompanying a final subdivision plat application.

    May 13, 2025 · 9 pages · 4.9 MB · Improv/Const Drawings

    Download Civil engineering submittal set, sheets 1 through 9

Project narrative

  • Transmittal letter from the applicant's engineering firm describing the revised 5-lot commercial subdivision, its phasing, and utility and drainage plans.

    May 13, 2025 · 1 page · 193 KB · Narrative

    Download Cover letter for short and final plat applications

Studies and reports

  • Soils exploration and foundation evaluation by Atlas Technical Consultants, fieldwork December 2021, with geotechnical recommendations for the proposed development.

    May 13, 2025 · 33 pages · 1.0 MB · Geotech/Soil Reports

    Download Geotechnical investigation report
  • May 13, 2025 · 1 page · 16 KB · Storm Water Reports

    Download Stormwater report

Other documents

  • Affidavit of legal interest

    May 13, 2025 · Affidavit of Legal Interest

  • Application final plat

    May 13, 2025 · Checklist & Master Application

  • Legal description

    May 13, 2025 · WORD Legal Description

  • Legal description

    May 13, 2025 · Legal Description

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.