Skip to content

Subdivision · Planning application

Five commercial lots for warehouse-style buildings approved in Nampa

Baron Properties' plat divides a 16.4-acre site into five commercial lots, each for one mixed-use commercial warehouse, built in phases. The city completed its decision on June 24, 2025, after a public hearing that day.

ApprovedSPS-00064-2025Filed May 13, 2025North Nampa · 15918 Star Rd+1 related filing
Site plan for Five commercial lots for warehouse-style buildings approved in Nampa
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

A 16.4-acre site at 15918 Star Rd in Nampa would be divided into five commercial lots, each meant for one mixed-use commercial warehouse building. The plan revises a four-lot plat approved in 2024 by adding a 3.21-acre parcel along Star Rd, and the buildings would be built in phases starting with lots 1 and 2.

Subdivide into five commercial lots, each accommodating one mixed-use commercial warehouse; total area is 16.4 acres in a GB1 zone.

Project name on file: 16 | 84 Commerce Center

Timeline

  1. July 11, 2025

    City Council Decision/Action Letter

  2. July 11, 2025

    Staff Report Preparation

  3. July 11, 2025

    P&Z Commision Decision/Action Letter

  4. June 24, 2025

    Decision: Approved

    Nampa Planning and Zoning Commission: Approved.

  5. June 24, 2025

    Public hearing: Nampa Planning and Zoning Commission

  6. June 20, 2025

    Notify Applicant

  7. June 20, 2025

    18 documents added

  8. June 12, 2025

    Property Postings

  9. June 9, 2025

    Notice to Area Property Owners

  10. June 3, 2025

    Notice to Agencies/Departments

  11. May 21, 2025

    Assess Fees (Subdivision)

  12. May 19, 2025

    Plan Intake Passed

  13. May 19, 2025

    Accepted for review

  14. May 13, 2025

    Application filed

Documents

Plans

  • Preliminary subdivision plat sheet showing a five-lot commercial layout, owner, developer and engineer contacts, zoning, and utility service providers, with utility and survey notes.

    May 22, 2025 · 4 pages · 8.5 MB · Prelim Plat - UPDATED

    Download Preliminary plat with utility and land use summary
  • Technical specification sections covering landscape work and irrigation performance, including topsoil, planting preparation, and irrigation products like valves, filters and pressure regulators.

    May 20, 2025 · 3 pages · 2.9 MB · Landscape Plans

    Download Irrigation and landscape work specifications
  • Preliminary plat drawing with a land use summary listing five commercial lots, GB1 zoning, and Nampa sewer, water and fire service, prepared by Bailey Engineering.

    May 13, 2025 · 4 pages · 8.6 MB · Prelim Plat

    Download Preliminary plat sheet
  • Draft final plat for the Commerce Center Subdivision, prepared by Bailey Engineering, Inc., across four pages.

    May 13, 2025 · 4 pages · 1.6 MB · Final Plat

    Download Commerce Center final plat
  • Conceptual exterior elevations (south and west) for Building 2 with height markers and glazing coverage calculations, noting the design is preliminary and not verified for code compliance.

    May 13, 2025 · 3 pages · 2.2 MB · Building Elevations

    Download Building 2 exterior elevations and glazing coverage
  • Memo stating the frontage landscape CDS is due by 5/23/25 and will be bonded and completed with the Phase 1 site landscape for lots 1 and 2.

    May 13, 2025 · 1 page · 20 KB · Landscape Plans - Memo

    Download Frontage landscape submittal and bonding memo
  • Nine-page set of civil engineering plan sheets from Bailey Engineering, Inc., dated May 12, 2025, marked not for construction; sheet contents are not legible in the extracted text.

    May 13, 2025 · 9 pages · 4.9 MB · Improv/Const Drawings

    Download Civil engineering drawing set, Bailey Engineering

Project narrative

  • Applicant's cover letter for the 16 | 84 Commerce Center short and final plat, proposing five commercial lots built out in phases with city water and sewer.

    May 13, 2025 · 1 page · 193 KB · Narrative

    Download Cover letter for short and final plat applications

Staff reports

  • Planning staff report to the Planning & Zoning Commission recommending action on a short plat and replat dividing two parcels into five commercial lots in a GB1 zoning district.

    June 20, 2025 · 45 pages · 21.9 MB · PZ Staff Report_June 2025

    Download Staff report for short plat and replat approval

Application

  • City of Nampa planning master application checking the Subdivision (Short, Final) box, with applicant, owner and engineer contact sections filled in.

    May 19, 2025 · 2 pages · 1.4 MB · Application

    Download Master application for short final subdivision plat

Studies and reports

  • Soils exploration and foundation evaluation by Atlas Technical Consultants, fieldwork December 2021, with foundation recommendations for the proposed development.

    May 13, 2025 · 33 pages · 1.0 MB · Geotech/Soil Reports

    Download Geotechnical investigation report

Other documents

  • Checklist

    May 21, 2025 · Checklist

  • May 19, 2025 · 139 KB · Pre-App Mtg Notes

    Download Pre-application meeting notes
  • Affidavit of legal interest

    May 13, 2025 · Affidavit of Legal Interest

  • Legal description

    May 13, 2025 · Legal Description - Word

  • Legal description

    May 13, 2025 · Legal Description

  • Vicinity map

    May 13, 2025 · Vicinity Map

  • Warranty deed

    May 13, 2025 · Warranty Deed

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.