Skip to content

Development review · Planning application

Approved: 5,542-square-foot Cobblestone Car Wash on vacant lot

The Design Review Committee approved the building's architecture, materials and colors for the single-story express car wash on a 1.27-acre lot. Building permits and site work such as parking and landscaping still must be obtained separately.

ApprovedDR-00425-2025Filed Dec. 31, 2025West Nampa · 11090 W Karcher Rd+1 related filing
Site plan for Approved: 5,542-square-foot Cobblestone Car Wash on vacant lot
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

A new single-story, 5,542-square-foot express automated tunnel car wash (Cobblestone Car Wash) is proposed on a vacant 1.27-acre lot at the northwest corner of Karcher Rd and Middleton Rd in Nampa. The building would be 20 to 25.5 feet tall, with a taller sign wall feature of about 35 feet, and the site would include 19 vacuum parking stalls and 5 regular spaces. The report covers building design review only.

New construction of a 5,542 SF Cobblestone Car Wash on a vacant lot.

Project name on file: Cobblestone Car Wash: Design Review for new 5,542 SF Cobblestone Car Wash on a vacant lot.

Timeline

  1. Two days ago

    Expired

  2. Jan. 26, 2026

    Decision/Action Letter

  3. Jan. 26, 2026

    20 documents added

  4. Jan. 26, 2026

    Decision: Approved with Conditions

  5. Jan. 22, 2026

    Staff Report Preparation

  6. Jan. 22, 2026

    P&Z Planner Review

  7. Jan. 2, 2026

    Set Date for Public Meeting

  8. Jan. 2, 2026

    Assess Fees (Building & Site)

  9. Jan. 2, 2026

    Planning Application Review

  10. Dec. 31, 2025

    Application filed

Documents

Site plans

  • Conceptual site plan for a car wash project, showing layout, vicinity map, project data and legend, prepared by KMEG LLP civil engineering.

    Dec. 31, 2025 · 1 page · 1.0 MB · Site Plan

    Download Conceptual site plan

Plans

  • Preliminary floor plan for a new one-story car wash facility with drive-thru pay-lanes, vacuum parking stalls, and employee and accessible restroom spaces, dated January 15, 2026.

    Jan. 22, 2026 · 1 page · 698 KB · Floor plan - updated 01/16/2026

    Download Site floor plan for car wash facility
  • Colored elevation sheet with an exterior materials legend listing insulated metal panel, metal roof, storefront framing, overhead door and trim finishes with colors and manufacturers, dated Jan. 15, 2026.

    Jan. 22, 2026 · 1 page · 1.4 MB · Elevations - updated 01/16/2026

    Download Colored exterior elevations and materials legend
  • Site enclosure drawing showing a metal frame gate with metal panel front, bollard and dimensions, plus an exterior materials legend listing insulated metal panels, roof metal, storefront framing, doors and paints.

    Jan. 22, 2026 · 1 page · 136 KB · Enclosure detail - Updated 01/16/2026

    Download Site enclosure plans and elevations, version 2
  • Landscape plan sheet with plant schedule, tree and buffer calculations, and a second sheet of landscape details including tree protection and planting, prepared for a 50% progress set.

    Dec. 31, 2025 · 2 pages · 2.5 MB · Landscaping Plan

    Download Landscape plan and details (sheets L1.0 and L2.0)
  • Lighting photometric plan sheet E1.3 with an engineer-of-record title block, issued as schematic, plus a lighting fixture cutsheets note.

    Dec. 31, 2025 · 1 page · 7.9 MB · Other

    Download Photometric plan
  • Schedule of exterior luminaires with manufacturers, models, quantities, lamp specifications, mounting heights and photometric data, prepared by a licensed engineer.

    Dec. 31, 2025 · 1 page · 284 KB · Other

    Download Exterior lighting fixture schedule and cutsheets
  • Floor plan for a new one-story car wash with drive-thru pay-lanes, self-serve vacuum stalls, and employee and business areas, with utility connections and dimensions noted.

    Dec. 31, 2025 · 1 page · 811 KB · ZZZ-OLD-Floor Plan

    Download Site floor plan for car wash facility
  • Colored elevation sheet showing an exterior materials legend with insulated metal panel, metal roof, storefront framing and overhead door specifications, plus a material square-footage breakdown.

    Dec. 31, 2025 · 1 page · 2.2 MB · ZZZ-OLD-Building Elevations

    Download Colored building elevations with exterior materials legend
  • Sheet listing exterior materials, manufacturers, models and colors for insulated metal panels, roof panels, trim, storefront framing, overhead door, and paint, plus a metal frame gate detail.

    Dec. 31, 2025 · 1 page · 140 KB · ZZZ-OLD-Other

    Download Site enclosure plans and elevations: exterior materials legend
  • Lists exterior wall panels, roof metal, storefront framing, overhead door, trim and paint specifications with manufacturers and colors for the building.

    Dec. 31, 2025 · 1 page · 109 KB · ZZZ-OLD-Building Finishes

    Download Exterior materials and paint legend

Project narrative

  • Cover letter describing a proposed 5,542 SF express automated tunnel car wash on a 1.27-acre parcel and stating the design and site plan meet code requirements.

    Dec. 31, 2025 · 1 page · 148 KB · Narrative

    Download Project narrative for design review application

Staff reports

  • Staff report for Design Review Committee review of design plans for a new 5,542 s.f. commercial car wash building in the BC zoning district, citing Comprehensive Plan community design standards.

    Jan. 22, 2026 · 30 pages · 5.7 MB · Design Review Staff Report

    Download Design standards staff report

Decisions

  • Decision letter approving the car wash building's design plans, with a general compliance condition and a two-year validity period for the approval.

    Jan. 26, 2026 · 10 pages · 3.0 MB · Design Review approval letter

    Download Design Review Committee approval letter

Other documents

  • Legend listing exterior building materials by tag (IMP-1 to IMP-4, MP-1, OHD, trim), with Kingspan and MBCI panel models, colors, and storefront framing.

    Jan. 22, 2026 · 1 page · 192 KB · Building finisheds - Updated 01/16/2026

    Download Exterior materials legend and finishes schedule
  • Color and material legend for the building exterior, listing insulated metal wall panels, standing seam roof panels, aluminum storefront framing, overhead doors and trim by manufacturer and color.

    Jan. 22, 2026 · 1 page · 192 KB · Color samples - Updated 01-16-2026

    Download Exterior materials and color legend
  • Affidavit of legal interest

    Dec. 31, 2025 · Affidavit of Legal Interest

  • Design review checklist and master application

    Dec. 31, 2025 · Checklist & Master Application

  • Vicinity map

    Dec. 31, 2025 · Vicinity Map

  • Color legend listing insulated metal panels, roof panel, storefront framing, overhead door, trim and paint finishes with manufacturers and color names.

    Dec. 31, 2025 · 1 page · 109 KB · ZZZ-OLD-Color Samples

    Download Exterior materials and color legend

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.