Skip to content

Subdivision · Planning application

Council approves 74 single-family home lots in Nampa subdivision

The 23.06-acre phase also includes 6 common lots and was approved Dec. 1 with conditions, including paying utility reimbursement fees and signing an improvement agreement before construction.

ApprovedSPF-00295-2025Filed Aug. 28, 2025North Nampa · 18314 Madison Rd+1 related filing
Site plan for Council approves 74 single-family home lots in Nampa subdivision
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Final plat approval is requested for East Ridgevue Estates No. 4, the fourth phase of an existing single-family neighborhood off Madison Road in Nampa. The 23.06-acre phase would have 74 single-family lots and 6 common lots. Staff found the plat substantially conforms to the approved preliminary plat.

Final Plat and construction drawings for East Ridgevue Subdivision No. 4

Project name on file: East Ridgevue Estates No 4

Timeline

  1. Dec. 2, 2025

    16 documents added

  2. Dec. 2, 2025

    City Council Decision/Action Letter

  3. Dec. 2, 2025

    Assess Fees (Subdivision)

  4. Dec. 2, 2025

    P&Z Commision Decision/Action Letter

  5. Dec. 1, 2025

    Decision: Approved with Conditions

    Nampa City Council: Approved with Conditions.

  6. Dec. 1, 2025

    Public hearing: Nampa City Council

  7. Sept. 26, 2025

    Notice to Agencies/Departments

  8. Sept. 26, 2025

    Set Date for Public Meeting

  9. Sept. 4, 2025

    Plan Intake Passed

  10. Sept. 4, 2025

    Accepted for review

  11. Aug. 28, 2025

    Application filed

Documents

Site plans

  • Unplatted preliminary plat sheet for a proposed residential subdivision, showing lots, common lots, legend, project data and notes for a 95.98-acre site.

    Aug. 28, 2025 · 3 pages · 2.2 MB · Preliminary Plat

    Download Preliminary plat, Ridgevue North subdivision

Plans

  • Building elevation drawings for Phase 3 of the East Ridgevue subdivision, submitted by CBH Homes with the final plat application.

    Sept. 2, 2025 · 4 pages · 1.1 MB · Building Elevations from Phase 3

    Download Building elevations from Phase 3
  • Final plat sheet for East Ridgevue Estates Subdivision No. 4, showing lot and block layout, line and curve tables, monuments, and a legend.

    Aug. 28, 2025 · 3 pages · 1.6 MB · Final Plat

    Download Final subdivision plat, East Ridgevue Estates No. 4
  • Engineering firm note stating that the building elevations are consistent with the surrounding phases of the same subdivision.

    Aug. 28, 2025 · 1 page · 102 KB · Building Elevations Note

    Download Building elevations note
  • Engineering improvement drawings for the final plat of East Ridgevue Estates Subdivision No. 4, showing vicinity map, benchmarks, contours, and utility lines.

    Aug. 28, 2025 · 22 pages · 16.9 MB · Improv/Const Drawings

    Download Improvement drawings, East Ridgevue Estates Subdivision No. 4
  • Landscape plan sheet showing planter beds, lawn and tree planting details, plant schedule and vicinity map for the final subdivision plat.

    Aug. 28, 2025 · 3 pages · 2.4 MB · Landscape Plans

    Download Landscape plan, Ridgevue Estates Subdivision No. 1
  • Subdivision exhibit for Ridgevue Estates showing open space planter beds, a plant schedule, lawn and tree planting notes, and a vicinity map.

    Aug. 28, 2025 · 3 pages · 2.4 MB · Open Space Exhibit

    Download Open space exhibit with planter beds, plant schedule and tree planting details

Project narrative

  • Narrative for the final plat of East Ridgevue Estates Subdivision No. 4, noting the 2022 preliminary plat approval and a phase of 74 residential lots and 6 common lots.

    Aug. 28, 2025 · 1 page · 113 KB · Narrative

    Download Narrative for final plat submittal

Staff reports

  • Staff finds the final plat substantially conforms to the approved preliminary plat, with 74 residential lots and 6 common lots on 23.06 acres, for Nov. 25 consent agenda recommendation.

    Nov. 19, 2025 · 27 pages · 21.3 MB · Available Online

    Download Staff report for East Ridgevue Subdivision No. 4 final plat

Decisions

Application

  • City of Nampa master application for the East Ridgevue Estates No. 4 final subdivision plat, listing applicant, owner, engineer contact and project acreage and lot counts.

    Sept. 4, 2025 · 2 pages · 1.3 MB · Application

    Download Master application form, final subdivision plat

Studies and reports

  • Subsurface investigation and foundation recommendations for the Ridgevue Estates subdivision, prepared by Materials Testing & Inspection for Mason & Associates, Inc., dated March 2018.

    Aug. 28, 2025 · 45 pages · 2.9 MB · Geotech/Soil Reports

    Download Geotechnical engineering report
  • Storm drainage master report for East Ridgevue No. 4 by Mason & Associates, dated March 27, 2025, covering calculation methodology, equations, and basin area data.

    Aug. 28, 2025 · 43 pages · 1.6 MB · Storm Water Reports

    Download Storm drainage master plan and calculations

Other documents

  • Signed affidavit of legal interest

    Signed affidavit of legal interest filed with the final subdivision plat application; text not available for review.

    Aug. 28, 2025 · Affidavit of Legal Interest

  • Subdivision boundary description

    Aug. 28, 2025 · Legal Description - Word

  • Subdivision boundary

    Aug. 28, 2025 · Legal Description

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.