Skip to content

Subdivision · Planning application

Nampa approves 30 single-family homes in Franklin Village North No. 5

Hubble Homes LLC won final plat approval for the fifth phase of the subdivision, on about 10.95 acres with 30 single-family lots and 9 common lots. The approval, decided May 5, comes with conditions including utility extensions and well and septic removal.

ApprovedSPF-00275-2024Filed Oct. 16, 2024North Nampa · 7354 Cherry Ln+2 related filings
Site plan for Nampa approves 30 single-family homes in Franklin Village North No. 5
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Hubble Homes has asked the City of Nampa to approve the final plat for Franklin Village North No. 5, a subdivision on about 10.95 acres near Cherry Lane. The plan creates 30 single-family home lots and 9 common lots in an RS-6 single-family residential zone. City staff recommend approval to the City Council, and this report does not record a final decision.

The Project consists of the fifth phase of a residential subdivision that includes 39 lots: 30 single-family residential lots and 9 common lots. The proposed improvements to the site include roadways, sidewalks, lot grading, and site utilities.

Project name on file: Franklin Village North No 5

Timeline

  1. Feb. 2, 2026

    19 documents added

  2. May 7, 2025

    City Council Decision/Action Letter

  3. May 7, 2025

    P&Z Commision Decision/Action Letter

  4. May 5, 2025

    Decision: Approved

    Nampa City Council: Approved.

  5. May 5, 2025

    Public hearing: Nampa City Council

  6. March 28, 2025

    Set Date for Public Meeting

  7. March 28, 2025

    Notice to Agencies/Departments

  8. March 25, 2025

    Assess Fees (Subdivision)

  9. Oct. 24, 2024

    Plan Intake Passed

  10. Oct. 24, 2024

    Accepted for review

  11. Oct. 23, 2024

    Plan Intake Failed

  12. Oct. 16, 2024

    Application filed

Documents

Site plans

  • Preliminary plat

    Oct. 16, 2024 · 8.3 MB · Preliminary Plat

Plans

  • Recorded final plat map for a subdivision of part of Lots 13 and 14 of Cortland Place, City of Nampa, showing lot layout, streets and a five-sheet index.

    Feb. 2, 2026 · 5 pages · 9.1 MB · Available Online

    Download Recorded final plat, Franklin Village North Subdivision No. 5
  • Cover sheet for the full set of construction plans, with legend, contact information for the owner/developer and engineer, a vicinity sketch, and benchmark data.

    May 9, 2025 · 35 pages · 56.7 MB · Improv/Const Drawings

    Download Construction plans cover sheet, Franklin Village North Subdivision No. 5
  • Revised final subdivision plat showing lot layout, boundary and curve tables, legend, references, and certificate sheets for a portion of Lots 13 and 14 of Cortland Place Subdivision.

    Feb. 25, 2025 · 5 pages · 8.3 MB · Final Plat Revised

    Download Final plat, Franklin Village North Subdivision No. 5
  • Revised landscape construction plan sheet with plant schedule, tree and shrub counts, and turf sod coverage for the final subdivision plat.

    Feb. 25, 2025 · 5 pages · 15.9 MB · Landscape Plans Revised

    Download Revised landscape plans, Franklin Village North No. 5

Staff reports

  • Planning staff recommends City Council approval of the 30-lot final plat, finding it substantially conforms to the preliminary plat, and summarizes agency comments including Nampa Fire District conditions.

    May 7, 2025 · 36 pages · 30.6 MB · Staff Report

    Download Staff report for final plat approval, Franklin Village North No 5

Decisions

  • Letter from the Nampa Planning and Zoning Commission recommending approval of the final plat for Franklin Village North No 5, subject to six conditions of approval.

    May 7, 2025 · 2 pages · 202 KB · Decision Letter

    Download Final plat approval decision letter

Correspondence

Other documents

  • Subdivision plat checklist

    March 25, 2025 · Checklist

  • Final subdivision plat application

    Oct. 23, 2024 · Application

  • Affidavit of legal interest

    Oct. 16, 2024 · Affidavit of Legal Interest

  • Building elevations

    Oct. 16, 2024 · Building Elevations

  • Geotechnical report

    Oct. 16, 2024 · Geotech/Soil Reports

  • Improvement drawings

    Oct. 16, 2024 · Improv/Const Drawings

  • Legal description

    Oct. 16, 2024 · Legal Description - Word

  • Legal description

    Oct. 16, 2024 · Legal Description

  • Narrative

    Oct. 16, 2024 · Narrative

  • Open space exhibit

    Oct. 16, 2024 · Open Space Exhibit

  • Storm water report

    Oct. 16, 2024 · Storm Water Reports

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.