Skip to content

Subdivision · Planning application

Approved: 73-lot single-family subdivision in Nampa with conditions

The City Council approved the final plat on Jan. 20 with conditions, including a public pathway agreement along Edwards Lateral and restricted access from the neighboring outparcel. The 21.4-acre subdivision would create 73 single-family lots and 12 common lots.

ApprovedSPF-00303-2025Filed Nov. 6, 2025West Nampa+3 related filings
Site plan for Approved: 73-lot single-family subdivision in Nampa with conditions
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

A final plat for Swainson's Hawk Arbor No. 1, the first phase of a single-family subdivision on about 21.4 acres at W Greenhurst Rd in Nampa. It would create 73 single-family lots and 12 common lots. The plat is on the Planning & Zoning Commission's consent agenda for a recommendation to City Council.

Swainson's Hawk Arbor No 1 is 73 lot residential subdivision on 21.405 acres.

Project name on file: Swainson's Hawk Arbor No 1

Timeline

  1. Jan. 21, 2026

    City Council Decision/Action Letter

  2. Jan. 21, 2026

    P&Z Commision Decision/Action Letter

  3. Jan. 21, 2026

    20 documents added

  4. Jan. 20, 2026

    Decision: Approved with Conditions

    Nampa City Council: Approved with Conditions.

  5. Jan. 20, 2026

    Public hearing: Nampa City Council

  6. Nov. 25, 2025

    Set Date for Public Meeting

  7. Nov. 25, 2025

    Notice to Agencies/Departments

  8. Nov. 14, 2025

    Assess Fees (Subdivision)

  9. Nov. 6, 2025

    Plan Intake Passed

  10. Nov. 6, 2025

    Application filed

  11. Nov. 6, 2025

    Accepted for review

Documents

Site plans

  • Index sheet for the preliminary plat drawing set, prepared by Bailey Engineering, Inc., with engineer's seal and a not-for-construction notice.

    Nov. 6, 2025 · 1 page · 980 KB · Preliminary Plat

    Download Preliminary plat index sheet

Plans

Project narrative

Staff reports

  • Planning staff recommend the final plat substantially conforms to the approved preliminary plat and meets applicable zoning and subdivision standards, with agency comments and conditions attached.

    Jan. 9, 2026 · 75 pages · 49.6 MB · Staff Report

    Download Staff report for final plat, Swainson's Hawk Arbor No. 1

Decisions

  • Letter to the applicant's representative reporting the Jan. 13, 2026 commission vote to recommend approval of the final plat to City Council, with numbered conditions of approval.

    Jan. 21, 2026 · 2 pages · 182 KB · Decision Letter

    Download Planning and Zoning Commission decision letter on final plat

Application

  • Master application for a final subdivision plat, naming Kent Brown as applicant, Corey D Barton as owner-agent, and Bailey Engineering as contractor.

    Nov. 6, 2025 · 2 pages · 1.5 MB · Application

    Download Master application form for final subdivision plat

Studies and reports

  • Subsurface soil, groundwater, stormwater disposal, pavement section and bearing pressure recommendations from a February 2024 geotechnical study by Allwest.

    Nov. 6, 2025 · 44 pages · 3.5 MB · Geotech/Soil Reports

    Download Geotechnical evaluation
  • Stormwater drainage calculations for the subdivision using the Rational Method, with runoff coefficients, 100-year storage sizing, and an IDF curve attachment.

    Nov. 6, 2025 · 69 pages · 7.1 MB · Storm Water Reports

    Download Drainage calculations package

Other documents

  • Swainson's Hawk Arbor No 1 checklist

    Nov. 14, 2025 · Checklist

  • Signed affidavit

    Nov. 6, 2025 · Affidavit of Legal Interest

  • Swainson's Hawk arbor, No. 1 legal description

    Legal description for the Swainson's Hawk arbor, filed as a Word document with the final subdivision plat application.

    Nov. 6, 2025 · Legal Description - Word

  • Swainson's Hawk arbor No. 1 description

    Nov. 6, 2025 · Legal Description

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.