Skip to content

Subdivision · Planning application

Final plat sought for 73 single-family homes on nearly 17 acres

The plan covers 73 building lots on 16.83 acres for detached houses and is the second phase of a subdivision. It is under city review, with no meeting date set yet.

In reviewSPF-00327-2026Filed Sept. 10, 2026West Nampa+3 related filings
Site plan for Final plat sought for 73 single-family homes on nearly 17 acres
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Final plat application for Swainson's Hawk Arbor Subdivision no 2

Project name on file: Swainson"s Hawk Arbor Subdivision no 2

Timeline

  1. Oct. 13, 2026

    15 documents added

  2. Oct. 13, 2026

    Assess Fees (Subdivision)

  3. Sept. 17, 2026

    Plan Intake Passed

  4. Sept. 17, 2026

    Accepted for review

  5. Sept. 10, 2026

    Application filed

Documents

Site plans

  • Open space exhibit sheet from Bailey Engineering for the Swainsons 2 final subdivision plat, as indicated by the filename and engineering firm header.

    Sept. 10, 2026 · 1 page · 253 KB · Open Space Exhibit

    Download Open space exhibit
  • Index sheet for the preliminary plat drawing set, prepared by Bailey Engineering, Inc., with engineer's seal and a not-for-construction notice.

    Sept. 10, 2026 · 1 page · 980 KB · Preliminary Plat

    Download Preliminary plat index sheet

Plans

  • Sept. 10, 2026 · 1 page · 2.3 MB · Building Elevations

    Download Building elevations
  • Submittal set of 30 pages of construction drawings for a Swainson's Hawk arbor, prepared by an engineering firm and dated Aug. 25, 2026; the extracted text is mostly stamp and seal fragments.

    Sept. 10, 2026 · 30 pages · 27.5 MB · Improv/Const Drawings

    Download Swainson's Hawk arbor construction drawings, set 2
  • Sheet 1 of the 8-sheet final plat showing lot layout, bearings, easement notes, and monument references for the subdivision in the City of Nampa.

    Sept. 10, 2026 · 8 pages · 1.1 MB · PDF Final Plat

    Download Final subdivision plat, Swainson's Hawk Arbor Subdivision No. 2
  • Landscape plan sheets for the Arbor No. 2 final plat, with a Bailey Engineering title block and Nampa irrigation and landscape specification sections.

    Sept. 10, 2026 · 6 pages · 5.0 MB · Landscape Plans

    Download Landscape plan, Swainson's Hawk Arbor No. 2 final plat

Project narrative

  • Staff checklist of required final plat submittals, fees and routing for Swainson's Hawk Arbor No. 2, including landscape, open space and geotechnical items.

    Sept. 29, 2026 · 1 page · 404 KB · Narrative

    Download Subdivision final plat checklist
  • Sept. 10, 2026 · 47 KB · Narrative

    Download Final plat narrative

Application

  • Master application form for the final plat of Swainson's Hawk Arbor No. 2, listing related earlier applications and applicant, owner and engineer contact details.

    Oct. 13, 2026 · 2 pages · 399 KB · Master APP

    Download Master application for final subdivision plat
  • City of Nampa planning master application form marking final subdivision plat as the application type, listing the applicant, owner, and engineering contractor contacts.

    Sept. 29, 2026 · 2 pages · 235 KB · Application

    Download Master application for final subdivision plat

Studies and reports

  • Subsurface soil, groundwater, stormwater disposal, pavement section and bearing pressure recommendations from a February 2024 geotechnical study by Allwest.

    Sept. 10, 2026 · 44 pages · 3.5 MB · Geotech/Soil Reports

    Download Geotechnical evaluation
  • Stamped drainage calculations for a 17.3-acre single-family subdivision, covering Rational Method runoff, 100-year storage sizing, IDF curve and basin layout.

    Sept. 10, 2026 · 64 pages · 6.6 MB · Storm Water Reports

    Download Drainage calculations package, Subdivision No. 2

Other documents

  • Signed affidavit

    Sept. 10, 2026 · Affidavit of Legal Interest

  • Swainson's Hawk arbor No. 2 legal description

    Sept. 10, 2026 · WORD Legal Description

  • Swainson's Hawk Arbor No. 2 legal description

    Sept. 10, 2026 · Legal Description

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.