Skip to content

Zoning certificate · Planning application

Approved: 432-square-foot backyard unit at former garage gets permit after the fact

The city approved a Zoning Certificate to legalize a 432-square-foot, one-bedroom accessory dwelling unit converted from a detached garage without a prior permit. Approval comes with conditions, including a five-foot paved path to the unit's entrance and limits on exterior construction hours.

ApprovedCZC25-00236Filed Nov. 6, 2025Depot Bench · 1019 S Pico St+1 related filing
Site plan for Approved: 432-square-foot backyard unit at former garage gets permit after the fact
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The applicant proposes converting an existing detached garage at 1019 S Pico Street in Boise into a single-story accessory dwelling unit. The unit would be 432 square feet with one bedroom and one bathroom, and the existing single-family home keeps its one required parking space.

Retroactive ADU

Project name on file: 1019 S PICO ST - ADU

Timeline

  1. Dec. 31, 2025

    Appeal Period: Completed

  2. Dec. 30, 2025

    Review Complete: Completed

  3. Dec. 30, 2025

    Current Planning: Complete

  4. Dec. 12, 2025

    Current Planning: In Review

  5. Dec. 12, 2025

    Assign Reviewers: Completed

  6. Nov. 26, 2025

    Review Complete: Corrections Required

  7. Nov. 26, 2025

    Current Planning: Corrections Required

  8. Nov. 25, 2025

    Current Planning: In Review

  9. Nov. 25, 2025

    Assign Reviewers: Completed

  10. Nov. 21, 2025

    Fee Payment: Payment Received

  11. Nov. 21, 2025

    Prescreen Review: Passed

  12. Nov. 21, 2025

    Prescreen Review: In Progress

  13. Nov. 17, 2025

    Prescreen Review: Corrections Required

  14. Nov. 14, 2025

    Prescreen Review: In Progress

  15. Nov. 14, 2025

    Application Submittal: ePlanReview

    Caught up missing details and Application

  16. Nov. 6, 2025

    Application filed

Documents

Site plans

Plans

  • Drawings of the building elevations, including a front view, for the zoning certificate application.

    Dec. 15, 2025 · 3 pages · 3.1 MB · PDS-Maps and Drawings

    Download Building elevations
  • Dec. 15, 2025 · 1 page · 1.1 MB · PDS-Maps and Drawings

    Download Floor plan
  • A one-page landscape plan drawing for the zoning certificate application, though the text extracted from the sheet is too garbled to confirm details.

    Dec. 15, 2025 · 1 page · 1.0 MB · PDS-Maps and Drawings

    Download Landscape plan

Project narrative

  • Applicant seeks a permitted studio apartment, 432 sq ft with 8 ft ceilings, converted from a garage without prior permits, for mid- or short-term rental use.

    Dec. 15, 2025 · 1 page · 21 KB · PDS-Letter of Intent

    Download Letter of intent for garage conversion

Decisions

Notices

  • City of Boise notice that staff approved a certificate of appropriateness for a seasonal exterior vestibule on a commercial property, with appeals due by January 9, 2026.

    Dec. 24, 2025 · 2 pages · 996 KB · PDS-Legal Notice

    Download Notice of approval for seasonal exterior vestibule

Application

  • Application form for a retroactive accessory dwelling unit zoning certificate in the MX-3 district, listing property details, applicant and owner information, and the submittal checklist.

    Nov. 14, 2025 · 3 pages · 205 KB · PDS-Application

    Download Zoning certificate application for accessory dwelling unit

Photos

  • Dec. 15, 2025 · 1 page · 149 KB · PDS-Photos

    Download Aerial image
  • A set of 15 site photographs filed with the zoning certificate application, with no descriptive text beyond the filing date.

    Dec. 15, 2025 · 15 pages · 1.8 MB · PDS-Photos

    Download Site photos

Correspondence

  • Building Division notes that converting garage space to living space requires upgrades to current building code, such as foundation, insulation, attic ventilation and smoke detection, and that this is not a full plan…

    Dec. 24, 2025 · 1 page · 66 KB · PDS-Agency Comments

    Download Building Division comments
  • The Boise Fire Department has no comments on the zoning certificate application and notes that fire and building code requirements will be addressed at building permit stage.

    Dec. 24, 2025 · 1 page · 151 KB · PDS-Agency Comments

    Download Boise Fire Department comments
  • Boise Parks and Recreation reviewed the application with Community Forestry and has no comments or recommendations.

    Dec. 24, 2025 · 1 page · 57 KB · PDS-Agency Comments

    Download Parks Department comments
  • Public Works says the property must connect to the central sanitary sewer, which is available on the adjacent street, and sewer capacity fees may apply at building permit issuance.

    Dec. 24, 2025 · 1 page · 41 KB · PDS-Agency Comments

    Download Public Works sewer comments

Other documents

  • Noticing radius map

    Dec. 24, 2025 · 544 KB · PDS-Maps and Drawings

  • Transmittal to review agencies

    Dec. 17, 2025 · 100 KB · PDS-Transmittal Agencies

  • Statement of legal interest

    Dec. 15, 2025 · 289 KB · PDS-Statement of Legal Interest

  • Receipt

    Nov. 21, 2025 · 135 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.