New science research building proposed on Boise State campus

The building would be similar in height and size to the existing Environmental Research building on the same parcel. No new parking is planned, and some on-street spaces could be removed. The Design Review Commission held a hearing July 17; no decision is on file.

In reviewPLN25-00473Filed June 4, 2025Southeast Boise · 1173 W University Dr+3 related filings
Site plan for New science research building proposed on Boise State campus
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

A new science research building on the BSU campus

Project name on file: R8048011910

Timeline

  1. Yesterday

    Status changed from “Planning Application Review” to “Applications in Review”

  2. Yesterday

    Status changed from Submitted to In review

    Reported as “Planning Application Review”.

  3. Two days ago

    Pending Application Submittal: Planning Applications in Review

    Updated Via Script

  4. Oct. 15, 2026

    Status changed from “Pending Application Submittal” to “Planning Application Submittal”

  5. Oct. 15, 2026

    Planning Applications: Generate Additional Application

  6. Oct. 15, 2026

    Pending Application Submittal: Planning Applications in Review

  7. Oct. 13, 2026

    6 documents added

  8. July 21, 2025

    IDR Review Complete: IDR Complete

  9. July 21, 2025

    Neighborhood Meeting Review: Not Required

    There are no off-campus properties within a 300-foot radius of the proposed building footprint. The applicant invited the registered Neighborhood Association to a meeting to discuss the project, and the NA did not attend.

  10. July 17, 2025

    Public hearing: Hybrid

  11. June 26, 2025

    Concept Review Complete: CR Complete - Type 3

  12. June 4, 2025

    Application Submittal: Online

  13. June 4, 2025

    Application filed

Documents

Site plans

  • Single-page concept diagrams showing the site context and conceptual massing for the proposed science research building, labeled with nearby campus features.

    June 4, 2025 · 1 page · 3.7 MB · PDS-Other Small Docs

    Download Conceptual imagery of campus location and building massing

Plans

  • Overall landscape and site plan for the Science Research Building, showing the revised layout of areas, swales, parking, loading and utilities.

    July 10, 2025 · 5 pages · 26.4 MB · PDS-Other Small Docs

    Download Updated IDR plans
  • Concept site plan for a Boise State University science research building, showing a conceptual massing diagram and site context with neighboring campus buildings and facilities.

    July 3, 2025 · 1 page · 3.7 MB · PDS-Other Small Docs

    Download Concept site plan and conceptual massing diagram

Project narrative

  • Advisory summary of a concept review for a proposed science research building on the Boise State University campus, covering zoning, parking, and design standards.

    June 26, 2025 · 3 pages · 455 KB · PDS-Concept Review Summary Report

    Download Concept review summary report

Application

  • Application for a new science research building for Boise State University, filed by Lombard Conrad Architects on behalf of the State of Idaho (Board of Education) in an MX-U zone.

    June 4, 2025 · 2 pages · 155 KB · PDS-Application

    Download Planning project application form

Studies and reports

  • Summarizes the July 17, 2025 interdepartmental review for a Boise State University science research building, including Public Works solid waste requirements for the Design Review application.

    July 21, 2025 · 7 pages · 1.1 MB · PDS-Interdepartmental Review Summary Report

    Download Interdepartmental review summary report, solid waste recommendations