Skip to content

Design review · Planning application

240 build-to-rent homes and clubhouse proposed on former farmland

The first phase would add single-level and two-story detached and attached rental homes, from one to four bedrooms, around a clubhouse, pool and pathways on a 44-acre site. The design review is in review and goes to City Council.

In reviewDRH26-00315Filed Sept. 23, 2026Vista · 2017 W Victory Rd+8 related filings
Site plan for 240 build-to-rent homes and clubhouse proposed on former farmland
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

This letter confirms that Boise Public Works found an Assured Water Supply application complete for a project at 2017 W Victory Rd. The letter does not describe what is being built or its size.

Design Review Major for Phase One - 240 BTR units

Project name on file: 2017 W VICTORY RD

Timeline

  1. Oct. 14, 2026

    32 documents added

  2. Sept. 25, 2026

    DR: In Review

  3. Sept. 25, 2026

    Assign Reviewers: Completed

  4. Sept. 23, 2026

    Fee Payment: Payment Received

  5. Sept. 23, 2026

    Prescreen Review: Passed

  6. Sept. 23, 2026

    Prescreen Review: In Progress

  7. Sept. 23, 2026

    Application Submittal: ePlanReview

    Updated content

  8. Sept. 23, 2026

    Application filed

Documents

Site plans

  • Site plan sheet for the Design Review application showing service drives, unit layout by bedroom count, and property lines, prepared by Kimley-Horn and Associates.

    Sept. 30, 2026 · 1 page · 1.9 MB · PDS-Maps and Drawings

    Download Design review site plan
  • Cover sheet for the preliminary plat showing block layout, lot areas, and the owner, civil engineer and land surveyor contacts for the Carlile Subdivision.

    Sept. 30, 2026 · 1 page · 650 KB · PDS-Maps and Drawings

    Download Preliminary plat cover sheet

Renderings

Plans

  • Floor plans and exterior elevations for the TH1 (1 bed, 1 bath) and TH2 (2 bed, 2.5 bath) townhome units, with a TH3 plan also included, in a build-to-rent packet.

    Sept. 30, 2026 · 18 pages · 14.8 MB · PDS-Maps and Drawings

    Download Building elevations and floor plans for townhome types TH1 and TH2
  • Exhibit C-1 sheet showing preliminary utility layout for the Vista Point project, including sewer, power, telecom, fiber and water lines, marked for review only and not construction.

    Sept. 30, 2026 · 2 pages · 1.5 MB · PDS-Maps and Drawings

    Download Preliminary utility plan, Exhibit C-1
  • Survey-style drawing of existing utilities, pavement, curbs, ditches, fencing and parcel boundaries on and around the site, with notes marking items to be removed or relocated.

    Sept. 30, 2026 · 2 pages · 728 KB · PDS-Maps and Drawings

    Download Existing conditions plan
  • Landscape plan sheet listing class I, II and III tree and shrub species, a landscape area summary, and a native planting mix with seeding rate.

    Sept. 30, 2026 · 3 pages · 11.3 MB · PDS-Maps and Drawings

    Download Concept landscape plan with plant schedule and requirements
  • Color concept plant schedule listing proposed trees, shrubs, groundcover, native seed mix and turf for the site.

    Sept. 30, 2026 · 1 page · 11.8 MB · PDS-Maps and Drawings

    Download Landscape plan, color
  • Irrigation schedule and diagrammatic method of irrigation, listing spray, drip, and bubbler components and a non-potable pond-fed pump system for the landscape.

    Sept. 30, 2026 · 1 page · 3.0 MB · PDS-Maps and Drawings

    Download Method of irrigation schematic and equipment schedule
  • Civil drawing of open space areas by phase, with takeoff square footages and a usable/amenity open space calculation under the multiple-family open space standard.

    Sept. 30, 2026 · 1 page · 4.3 MB · PDS-Maps and Drawings

    Download Open space plan with phase takeoffs
  • Site drawing showing access service drives, nearby bus stop distance, proposed bicycle parking, and ACHD roadway notes, prepared by Kimley-Horn and Associates.

    Sept. 30, 2026 · 1 page · 1.9 MB · PDS-Maps and Drawings

    Download Preliminary mobility plan
  • Parking calculations for 240 single-family units, covering required, proposed and maximum spaces by bedroom count, plus guest, bicycle and clubhouse requirements and Phase 1 guest parking.

    Sept. 30, 2026 · 1 page · 2.8 MB · PDS-Maps and Drawings

    Download Preliminary parking plan
  • Kimley-Horn sheet showing proposed gravity irrigation, seepage beds, sanitary sewer, water lines, fire hydrants, and streetlights for the Vista Point preliminary plat.

    Sept. 30, 2026 · 2 pages · 2.9 MB · PDS-Maps and Drawings

    Download Preliminary utility plan, Vista Point preliminary plat, sheet PP-03
  • Sheet of the preliminary plat showing typical local roadway, front and rear access service drive, and cross-section details, sheet 2 of 7.

    Sept. 30, 2026 · 1 page · 2.0 MB · PDS-Maps and Drawings

    Download Roadway assignment plan
  • Conceptual lighting plan with a fixture schedule (street, pedestrian and parking lot lights) that states it is not a certified photometric study and is not for construction.

    Sept. 30, 2026 · 1 page · 759 KB · PDS-Maps and Drawings

    Download Schematic lighting plan
  • Site map showing the placement of town home, rear-loaded duplex, front-loaded single-level, and front-loaded duplex-level unit types across the multi-family development, with a legend of bedroom counts and a total of…

    Sept. 30, 2026 · 1 page · 8.1 MB · PDS-Maps and Drawings

    Download Unit type and locations map

Project narrative

  • Letter from Brighton Development describing the proposed 240 build-to-rent homes, amenities, site features, and related entitlement requests for the Vista Point Subdivision.

    Sept. 30, 2026 · 2 pages · 63 KB · PDS-Letter of Intent

    Download Detailed letter of explanation for design review

Decisions

  • Public Works letter from the City of Boise confirming the Assured Water Supply application was received and determined complete, with a certification number assigned.

    Sept. 30, 2026 · 1 page · 57 KB · PDS-Other Small Docs

    Download Assured Water Supply application completeness letter

Application

  • Application for Design Review Major covering phase one of a 240-unit build-to-rent project on a 43.93-acre R-3 parcel, with project phasing and site design footprints listed.

    Sept. 30, 2026 · 8 pages · 240 KB · PDS-Application

    Download Design review application for phase one build-to-rent project
  • Blank City of Boise form for applicants seeking Assured Water Supply certification for development within a water district's service area; applicant contact and PLN sections are filled in.

    Sept. 30, 2026 · 10 pages · 334 KB · PDS-Other Small Docs

    Download Assured Water Supply Application B (Design Review)
  • Application for Design Review Major covering phase one of a 240-unit build-to-rent project on a 43.93-acre R-3 parcel, with project phasing and site design footprints listed.

    Sept. 23, 2026 · 8 pages · 240 KB · PDS-Application

    Download Design review application for phase one build-to-rent project

Photos

  • Four photos of the site's northern and eastern boundaries, labeled by the street intersections where each was taken.

    Sept. 30, 2026 · 4 pages · 4.8 MB · PDS-Photos

    Download Site photos

Correspondence

  • Veolia confirms water service is available for the project under its current tariffs, noting mains, services, hydrants and possible upsizing at the owner's expense, and expires in twelve months.

    Sept. 30, 2026 · 1 page · 270 KB · PDS-Other Small Docs

    Download Veolia water serviceability letter (will-serve)
  • Water provider letter giving available pressure and flow at a nearby hydrant under maximum-day conditions, for fire sprinkler design and Fire Department review.

    Sept. 30, 2026 · 1 page · 111 KB · PDS-Other Small Docs

    Download Veolia Water fire flow information

Other documents

  • Transmittal sheet

    Oct. 2, 2026 · 223 KB · PDS-Transmittal Agencies

  • Exhibit B-1 zoning map

    Sept. 30, 2026 · 553 KB · PDS-Maps and Drawings

  • Processing status page showing the assured water supply review was marked complete and the record approved, after prescreen approval in April 2026.

    Sept. 30, 2026 · 1 page · 185 KB · PDS-Other Small Docs

    Download Assured water supply review status record
  • City of Boise water demand calculator for 631 projected residential customers, estimating about 209,015 gallons per day average and 463,342 gallons per day maximum demand.

    Sept. 30, 2026 · 1 page · 24 KB · PDS-Other Small Docs

    Download Assured water supply demand calculator (Exhibit C-3)
  • Statement of legal interest

    Sept. 30, 2026 · 230 KB · PDS-Statement of Legal Interest

  • Submittal checklist

    Sept. 30, 2026 · 894 KB · PDS-Submittal Checklist

  • Fee receipt

    Sept. 23, 2026 · 132 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.