Planning project · Planning application
Plan to move fuel station to vacant lot and repave parking heads to commission review
The proposal would relocate an existing fuel station to an empty lot on the same 24-acre site and add new parking. The Planning and Zoning Commission hearing was held June 18; no decision is on file.

From the filing
The application's description as it appears in City of Boise's record. See the official record
Relocate fuel facility
Project name on file: 2051 S COLE RD
Timeline
Oct. 14, 2026
8 documents added
Sept. 29, 2026
Planning Applications: Generate Additional Application
Sept. 29, 2026
Pending Application Submittal: Planning Applications in Review
June 18, 2026
Public hearing: Hybrid
June 18, 2026
IDR Review Complete: IDR Complete With Recommendations
A Planning Director determination regarding parking requirements for the use will be requested. The required applications will be opened after a determination has been made.
June 16, 2026
Neighborhood Meeting Review: Completed
March 17, 2026
Concept Review Complete: CR Complete - Type 3
March 5, 2026
Concept Review Complete: Corrections Required
per email sent 3-5-2026
Feb. 24, 2026
Application Submittal: Online
Feb. 24, 2026
Application filed
Documents
Site plans
- Download Site plan with parking and building data
Site plan showing building areas, parking counts (931 total stalls), bicycle parking, setbacks and the existing curb cut for the proposed project.
Feb. 24, 2026 · 1 page · 537 KB · PDS-Other Small Docs
Plans
- Download Project narrative for fuel facility relocation
Narrative for relocating Costco's fuel facility, covering the canopy, dispensers, storage tanks, parking, landscaping and lighting, prepared for a pre-application meeting.
June 2, 2026 · 6 pages · 2.8 MB · PDS-Other Small Docs
- Download Architectural elevations for fuel canopy and signage
Elevation drawings of the fuel canopy, with dimensions, plus a schedule of fuel-facility signs and safety warning placards.
Feb. 24, 2026 · 2 pages · 2.0 MB · PDS-Other Small Docs
Project narrative
- Download Concept review summary report
Advisory concept review notes covering the proposed fuel station relocation, detached sidewalk and parking landscaping requirements, and the applications required.
March 17, 2026 · 3 pages · 476 KB · PDS-Concept Review Summary Report
- Download Project narrative for fuel facility relocation
Narrative describing the relocation of the Costco fuel facility, including canopy, dispensers, underground tanks, parking changes, and landscaping.
Feb. 24, 2026 · 3 pages · 305 KB · PDS-Other Small Docs
Notices
- Download Neighborhood meeting notice letter and mailing list
Letter inviting neighbors to a May 5, 2026 neighborhood meeting on a proposed Costco fuel facility relocation and expansion, followed by a radius address mailing list.
May 12, 2026 · 18 pages · 6.2 MB · PDS-Other Small Docs
Application
- Download Planning project application form
Application for on-site relocation of a fuel center at a Costco Wholesale property in an I-1 zoning district, filed by Core States Group as applicant.
Feb. 24, 2026 · 2 pages · 158 KB · PDS-Application
Studies and reports
- Download Interdepartmental review summary report
Advisory staff comments from the June 18, 2026 interdepartmental review on a proposal to relocate the fuel facility and expand the parking lot, including Public Works solid waste requirements.
June 25, 2026 · 9 pages · 797 KB · PDS-Interdepartmental Review Summary Report