Planning project · Planning application
Split of 2.56-acre industrial flex park site into 4 lots approved
The city approved a minor land division of the industrial site into four lots on Aug. 25, 2026. The already-approved industrial park design is not changing; the split uses a survey process allowed under the city's July 1, 2025 code update.

From the filing
The application's description as it appears in City of Boise's record. See the official record
Minor Land Division
Project name on file: 2101 S SATURN WAY
Timeline
Aug. 25, 2026
Planning Applications: Project Entitled
June 11, 2026
Pending Application Submittal: Planning Applications in Review
Updated Via Script
May 26, 2026
Planning Applications: Generate Additional Application
May 26, 2026
Pending Application Submittal: Notes
Emailed Dan to verify that sewer was worked out. Application is already open.
May 26, 2026
Pending Application Submittal: Planning Applications in Review
Sept. 5, 2025
Concept Review Complete: CR Complete - Type 2
Aug. 21, 2025
Application Submittal: Online
Aug. 21, 2025
Application filed
Documents
Site plans
- Download Record of survey and parcel descriptions
Scanned one-page attachment containing a record of survey and parcel descriptions; the text layer is garbled and largely unreadable.
May 22, 2026 · 1 page · 194 KB · PDS-Other Small Docs
- Download Minor land division survey
Survey plat for a minor land division, with scrambled text layer that is largely unreadable beyond the title block.
May 20, 2026 · 1 page · 189 KB · PDS-Other Small Docs
- Download Minor land division site plan
Single-sheet site plan for a minor land division of the Skyway Industrial Park subdivision, prepared by Leavitt & Associates Engineers, Inc. and dated March 2025.
Aug. 21, 2025 · 1 page · 802 KB · PDS-Other Small Docs
Project narrative
- Download Concept review summary for minor land division
Planner's advisory summary: the industrial flex park's approved design stays unchanged, while the parcel is divided into four lots by Record of Survey under the new Minor Land Division rule.
Sept. 5, 2025 · 1 page · 440 KB · PDS-Concept Review Summary Report
- Download Project description letter for minor land division
Applicant letter requesting approval of a 4-lot industrial park with 20 flex light industrial spaces, covering utilities, water rights, pathway and trash enclosure changes.
Aug. 21, 2025 · 2 pages · 36 KB · PDS-Other Small Docs
Application
- Download Planning project application form
Applicant's planning project application for a light industrial "flex" space development in an I-1 zone, with owner and contact details and signed certification.
Aug. 21, 2025 · 2 pages · 154 KB · PDS-Application
Other documents
- Download Record of survey and parcel descriptions
Exterior boundary description for Parcel "D", a 0.52-acre parcel carved from Parcel "A" under a referenced record of survey, with closure data.
May 22, 2026 · 2 pages · 41 KB · PDS-Other Small Docs
- Download Record of survey and parcel descriptions
Exterior boundary description for Parcel "B", a portion of Parcel "A" under a referenced record of survey, with a parcel closure calculation sheet dated 10/17/2025.
May 22, 2026 · 2 pages · 46 KB · PDS-Other Small Docs
- Download Record of survey and parcel descriptions
Exterior boundary description for Parcel A, a 0.91-acre tract, with a closure calculation and traverse data, prepared by a survey firm dated Oct. 17, 2025.
May 22, 2026 · 2 pages · 47 KB · PDS-Other Small Docs
- Download Record of survey and parcel descriptions
Metes-and-bounds boundary description for Parcel "C" (0.39 acres) as a portion of Parcel "A" under a referenced record of survey, with a closure calculation sheet.
May 22, 2026 · 2 pages · 45 KB · PDS-Other Small Docs


