Skip to content

Planning project · Planning application

Split of 2.56-acre industrial flex park site into 4 lots approved

The city approved a minor land division of the industrial site into four lots on Aug. 25, 2026. The already-approved industrial park design is not changing; the split uses a survey process allowed under the city's July 1, 2025 code update.

ApprovedPLN25-00718Filed Aug. 21, 2025South Cole · 2101 S Saturn Way+1 related filing
Site plan for Split of 2.56-acre industrial flex park site into 4 lots approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Minor Land Division

Project name on file: 2101 S SATURN WAY

Timeline

  1. Aug. 25, 2026

    Planning Applications: Project Entitled

  2. June 11, 2026

    Pending Application Submittal: Planning Applications in Review

    Updated Via Script

  3. May 26, 2026

    Planning Applications: Generate Additional Application

  4. May 26, 2026

    Pending Application Submittal: Notes

    Emailed Dan to verify that sewer was worked out. Application is already open.

  5. May 26, 2026

    Pending Application Submittal: Planning Applications in Review

  6. Sept. 5, 2025

    Concept Review Complete: CR Complete - Type 2

  7. Aug. 21, 2025

    Application Submittal: Online

  8. Aug. 21, 2025

    Application filed

Documents

Site plans

  • Scanned one-page attachment containing a record of survey and parcel descriptions; the text layer is garbled and largely unreadable.

    May 22, 2026 · 1 page · 194 KB · PDS-Other Small Docs

    Download Record of survey and parcel descriptions
  • Survey plat for a minor land division, with scrambled text layer that is largely unreadable beyond the title block.

    May 20, 2026 · 1 page · 189 KB · PDS-Other Small Docs

    Download Minor land division survey
  • Single-sheet site plan for a minor land division of the Skyway Industrial Park subdivision, prepared by Leavitt & Associates Engineers, Inc. and dated March 2025.

    Aug. 21, 2025 · 1 page · 802 KB · PDS-Other Small Docs

    Download Minor land division site plan

Project narrative

  • Planner's advisory summary: the industrial flex park's approved design stays unchanged, while the parcel is divided into four lots by Record of Survey under the new Minor Land Division rule.

    Sept. 5, 2025 · 1 page · 440 KB · PDS-Concept Review Summary Report

    Download Concept review summary for minor land division
  • Applicant letter requesting approval of a 4-lot industrial park with 20 flex light industrial spaces, covering utilities, water rights, pathway and trash enclosure changes.

    Aug. 21, 2025 · 2 pages · 36 KB · PDS-Other Small Docs

    Download Project description letter for minor land division

Application

  • Applicant's planning project application for a light industrial "flex" space development in an I-1 zone, with owner and contact details and signed certification.

    Aug. 21, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Other documents

  • Exterior boundary description for Parcel "D", a 0.52-acre parcel carved from Parcel "A" under a referenced record of survey, with closure data.

    May 22, 2026 · 2 pages · 41 KB · PDS-Other Small Docs

    Download Record of survey and parcel descriptions
  • Exterior boundary description for Parcel "B", a portion of Parcel "A" under a referenced record of survey, with a parcel closure calculation sheet dated 10/17/2025.

    May 22, 2026 · 2 pages · 46 KB · PDS-Other Small Docs

    Download Record of survey and parcel descriptions
  • Exterior boundary description for Parcel A, a 0.91-acre tract, with a closure calculation and traverse data, prepared by a survey firm dated Oct. 17, 2025.

    May 22, 2026 · 2 pages · 47 KB · PDS-Other Small Docs

    Download Record of survey and parcel descriptions
  • Metes-and-bounds boundary description for Parcel "C" (0.39 acres) as a portion of Parcel "A" under a referenced record of survey, with a closure calculation sheet.

    May 22, 2026 · 2 pages · 45 KB · PDS-Other Small Docs

    Download Record of survey and parcel descriptions

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.