Planning project · Planning application
Costco parking lot repaving approved
City staff approved plans to rehabilitate the Costco warehouse parking lot on June 5. An engineer's assessment recommends replacing about 540,000 square feet of old asphalt with new pavement; a lesser option would only seal the employee lot.

From the filing
The application's description as it appears in City of Boise's record. See the official record
Costco Wholesale Warehouse No. 761 at 2051 S. Cole Road in Boise plans to rehabilitate its parking lot. An engineer's pavement assessment recommends removing and replacing most of the old asphalt, roughly 540,000 square feet, with new light-duty and heavy-duty pavement. An alternate plan would only crack seal and fog coat the employee parking area, about 45,000 square feet.
Repave parking lot.
Project name on file: 2051 S COLE RD
Timeline
June 5, 2026
Planning Applications: Project Entitled
May 18, 2026
Pending Application Submittal: Planning Applications in Review
March 25, 2026
Concept Review Complete: CR Complete - Type 2
March 9, 2026
Concept Review Complete: Corrections Required
Please discuss the timing of this project with the relocation of the fuel pump project with the Costco representative.
March 3, 2026
Application Submittal: Online
March 3, 2026
Application filed
Documents
Site plans
- Download Recommended pavement repair plan, figure 4A
Site plan showing pavement repair areas for light duty and heavy duty asphalt sections, subgrade stabilization zones, and concrete areas to remain, referencing a geotechnical report.
March 3, 2026 · 2 pages · 2.3 MB · PDS-Other Small Docs
Project narrative
- Download Concept review summary for parking lot repaving
Planner notes from a March 2026 concept review on repaving a commercial parking lot, listing Design Review - Minor as the required application and landscaping replacement rules for re-striped lots.
March 25, 2026 · 1 page · 460 KB · PDS-Concept Review Summary Report
- Download Parking lot reconstruction project description letter
Costco's letter describes a parking lot repaving and restriping project and requests approval for night construction in select operational areas.
March 3, 2026 · 2 pages · 186 KB · PDS-Other Small Docs
Decisions
- Download Limited pavement assessment letter report
Kleinfelder engineering letter evaluating existing parking lot pavement condition at the Costco warehouse and recommending rehabilitation or reconstruction.
March 3, 2026 · 66 pages · 14.9 MB · PDS-Other Small Docs
Application
- Download Planning project application form
Application for a parking lot repaving project at an industrial-zoned commercial property, with no change in use, including asphalt replacement and restriping.
March 3, 2026 · 2 pages · 159 KB · PDS-Application


