Skip to content

Planning project · Planning application

Costco parking lot repaving approved

City staff approved plans to rehabilitate the Costco warehouse parking lot on June 5. An engineer's assessment recommends replacing about 540,000 square feet of old asphalt with new pavement; a lesser option would only seal the employee lot.

ApprovedPLN26-00218Filed March 3, 2026South Cole · 2051 S Cole Rd+4 related filings
Site plan for Costco parking lot repaving approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Costco Wholesale Warehouse No. 761 at 2051 S. Cole Road in Boise plans to rehabilitate its parking lot. An engineer's pavement assessment recommends removing and replacing most of the old asphalt, roughly 540,000 square feet, with new light-duty and heavy-duty pavement. An alternate plan would only crack seal and fog coat the employee parking area, about 45,000 square feet.

Repave parking lot.

Project name on file: 2051 S COLE RD

Timeline

  1. June 5, 2026

    Planning Applications: Project Entitled

  2. May 18, 2026

    Pending Application Submittal: Planning Applications in Review

  3. March 25, 2026

    Concept Review Complete: CR Complete - Type 2

  4. March 9, 2026

    Concept Review Complete: Corrections Required

    Please discuss the timing of this project with the relocation of the fuel pump project with the Costco representative.

  5. March 3, 2026

    Application Submittal: Online

  6. March 3, 2026

    Application filed

Documents

Site plans

  • Site plan showing pavement repair areas for light duty and heavy duty asphalt sections, subgrade stabilization zones, and concrete areas to remain, referencing a geotechnical report.

    March 3, 2026 · 2 pages · 2.3 MB · PDS-Other Small Docs

    Download Recommended pavement repair plan, figure 4A

Project narrative

  • Planner notes from a March 2026 concept review on repaving a commercial parking lot, listing Design Review - Minor as the required application and landscaping replacement rules for re-striped lots.

    March 25, 2026 · 1 page · 460 KB · PDS-Concept Review Summary Report

    Download Concept review summary for parking lot repaving
  • Costco's letter describes a parking lot repaving and restriping project and requests approval for night construction in select operational areas.

    March 3, 2026 · 2 pages · 186 KB · PDS-Other Small Docs

    Download Parking lot reconstruction project description letter

Decisions

  • Kleinfelder engineering letter evaluating existing parking lot pavement condition at the Costco warehouse and recommending rehabilitation or reconstruction.

    March 3, 2026 · 66 pages · 14.9 MB · PDS-Other Small Docs

    Download Limited pavement assessment letter report

Application

  • Application for a parking lot repaving project at an industrial-zoned commercial property, with no change in use, including asphalt replacement and restriping.

    March 3, 2026 · 2 pages · 159 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.