Skip to content

Planning project · Planning application

Variance for home addition and basement garage denied in hillside area

The Hearing Examiner denied a request to add onto a single-family house that sits within the side setback. The plan included a basement garage about 15 feet from the front property line, where 20 feet is required.

DeniedPLN25-00787Filed Sept. 4, 2025North End · 2514 N Heights Dr+4 related filings
Site plan for Variance for home addition and basement garage denied in hillside area
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Addition to SFD in Hillside Overlay, Variance

Project name on file: 2514 N HEIGHTS DR

Timeline

  1. March 2, 2026

    Planning Applications: Application Denied

  2. Feb. 24, 2026

    Planning Applications: Project Entitled

  3. Jan. 7, 2026

    Pending Application Submittal: Planning Applications in Review

  4. Jan. 5, 2026

    IDR Review Complete: IDR Waived

    IDR is not necessary for an addition to a SFD,

  5. Jan. 5, 2026

    Neighborhood Meeting Review: Completed

  6. Oct. 17, 2025

    Concept Review Complete: CR Complete - Type 3

  7. Sept. 22, 2025

    Concept Review Complete: Corrections Required

    Please include a Site Plan, label the setbacks for both the existing and proposed structure or addition.

  8. Sept. 12, 2025

    Concept Review Complete: Corrections Required

    Is this a new build? What are you proposing exactly? Please upload a Site Plan showing location of setbacks and proposed additions (?) in relation to the existing structure. Thank you.

  9. Sept. 12, 2025

    Concept Review Complete: Engineering Preview

  10. Sept. 12, 2025

    Concept Review Complete: Engineering Preview Complete

    A determination has been made that this project will be a Category II Hillside project due to the nature of surrounding slopes. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a geotechnical report with a possibility of a global slope stability analysis; structural calculations for any retaining wall that is greater than four feet of height, more than one retaining wall when the horizontal interior distance between the retaining walls is less than 10 feet and the total of all retaining walls exceeds four feet in height, a retaining wall having a surcharge, or having a backslope greater than three feet horizontal to one foot vertical; and civil plans.NOTE: The hazards of developing and building on property, especially in the Boise foothills, is well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.

  11. Sept. 5, 2025

    Concept Review Complete: Hillside Questionnaire Needed

  12. Sept. 4, 2025

    Application Submittal: Online

  13. Sept. 4, 2025

    Application filed

Documents

Site plans

  • One-page site drawing showing existing property lines and foundations from the neighborhood; the extracted text is mostly street labels and a timestamp.

    Jan. 7, 2026 · 1 page · 230 KB · PDS-Other Small Docs

    Download Existing property lines and overlying foundations
  • The one-page site plan drawing; the extracted text is mostly garbled and unreadable, so details cannot be confirmed.

    Oct. 1, 2025 · 1 page · 2.7 MB · PDS-Other Small Docs

    Download Site plan

Plans

  • Floor plan drawing showing room dimensions, window and door schedule tags, a stairwell, and a deck, with elevation marker E1.

    Sept. 4, 2025 · 1 page · 31 KB · PDS-Other Small Docs

    Download First floor plan
  • Dimensioned second-floor plan showing window sizes, a master bedroom and a living area of about 1,145 square feet.

    Sept. 4, 2025 · 1 page · 26 KB · PDS-Other Small Docs

    Download Second floor plan
  • Floor plan of the basement level showing room dimensions and stair location; the text is mostly unlabeled measurements, so details are limited.

    Sept. 4, 2025 · 1 page · 35 KB · PDS-Other Small Docs

    Download Basement plan
  • Timber Roots engineered wood product layout sheet with joist and beam schedule, connector summary, design loads, and deflection criteria.

    Sept. 4, 2025 · 3 pages · 3.4 MB · PDS-Other Small Docs

    Download Engineered wood floor framing plan
  • Truss engineering sheet for a flat girder truss (job 4785751), listing lumber specs, reactions, bracing and member forces for a 986 lb assembly.

    Sept. 4, 2025 · 2 pages · 107 KB · PDS-Other Small Docs

    Download Girder truss engineering drawing, truss R1001

Project narrative

  • Planner's advisory summary of a Type 3 concept review for a single-family dwelling addition in the Hillside overlay, covering required applications, a legally nonconforming structure, and setback variances.

    Jan. 5, 2026 · 3 pages · 465 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Planner's advisory summary of a Type 3 concept review for a single-family dwelling addition in the Hillside overlay, covering required applications, a legally nonconforming structure, and setback variances.

    Oct. 17, 2025 · 3 pages · 465 KB · PDS-Concept Review Summary Report

    Download Concept review summary report

Notices

Application

  • A one-page Public Works questionnaire asking whether the project involves hillside grading, retaining walls, or other earthwork; the OCR text is partly garbled and answers are hard to read.

    Sept. 6, 2025 · 1 page · 115 KB · PDS-Other Small Docs

    Download Public Works hillside project questionnaire
  • Application for a single-family home on an R-1A zoned parcel, with a note that a Hillside Questionnaire is required.

    Sept. 4, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Photos

Correspondence

  • Applicant's letter explaining the reasons for the variance request; the full text was not available to summarize.

    Jan. 3, 2026 · 17 KB · PDS-Other Small Docs

    Download Letter of explanation for variance

Other documents

  • Statement of legal interest

    Jan. 7, 2026 · 2.6 MB · PDS-Other Small Docs

  • Jan. 3, 2026 · 1 page · 1.8 MB · PDS-Other Small Docs

    Download Other feedback
  • Sign-in sheet

    Jan. 3, 2026 · 1.7 MB · PDS-Other Small Docs

  • Sept. 4, 2025 · 1 page · 488 KB · PDS-Other Small Docs

    Download Street view

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.