Skip to content

Planning project · Planning application

Four new greenhouses approved on 10.91-acre industrial site

The approval adds four greenhouses to an existing greenhouse operation on the site, totaling about 15,600 square feet of building floor area, with no change to parking. The city decided the application administratively on Nov. 21.

ApprovedPLN25-00828Filed Sept. 19, 2025Morris Hill · 5317 W Irving St+1 related filing
Site plan for Four new greenhouses approved on 10.91-acre industrial site
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Greenhouse expansion in I-1 (light industrial) zone

Project name on file: 5317 W IRVING ST

Timeline

  1. Nov. 21, 2025

    Planning Applications: Project Entitled

  2. Oct. 22, 2025

    Pending Application Submittal: Planning Applications in Review

  3. Oct. 2, 2025

    Concept Review Complete: CR Complete - Type 2

  4. Sept. 19, 2025

    Application Submittal: Online

  5. Sept. 19, 2025

    Application filed

Documents

Site plans

  • Site plan sheet with general notes on benchmarks, coordination with civil drawings, and reference notes for building and utility features.

    Sept. 19, 2025 · 1 page · 774 KB · PDS-Other Small Docs

    Download Architectural site plan

Plans

  • Drainage plan sheet with keyed notes on storm drain pipes, cleanouts, yard drains, infiltration gallery and swale, plus earthwork and fitting requirements.

    Sept. 19, 2025 · 1 page · 1.7 MB · PDS-Other Small Docs

    Download Civil drainage plan, sheet C4.0 keyed notes and storm drain layout
  • Grading sheet with keyed notes on pavement, sidewalks, drainage swales, ADA slope requirements, sawcut matching and finished floor elevations around existing structures.

    Sept. 19, 2025 · 1 page · 2.3 MB · PDS-Other Small Docs

    Download Civil grading plan
  • Utility sheet with keyed notes on sewer and water retention, fire hydrant flow data, cleanout collars, trenching, and surface restoration requirements.

    Sept. 19, 2025 · 1 page · 2.2 MB · PDS-Other Small Docs

    Download Civil utility plan
  • Exterior building elevations for the Simplot greenhouse expansion, showing south, east and west views with wall materials, levels and roof eave heights.

    Sept. 19, 2025 · 1 page · 179 KB · PDS-Other Small Docs

    Download Building elevations, 100% design development
  • Architectural floor plan sheet showing room layout, occupancy classifications, door and wall keynotes, and general construction notes for a Simplot greenhouse expansion.

    Sept. 19, 2025 · 1 page · 206 KB · PDS-Other Small Docs

    Download Composite floor plan, greenhouse expansion (100% design development)

Project narrative

  • Planner's summary of a concept review for four new greenhouses added south of existing ones, noting Design Review - Minor is required and setbacks must follow I-1 standards.

    Oct. 2, 2025 · 1 page · 444 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Describes four new greenhouses, about 3,900 SF each (about 15,600 SF total), added to the south end of the existing greenhouse facility on the campus.

    Sept. 19, 2025 · 1 page · 110 KB · PDS-Other Small Docs

    Download Project description letter

Application

  • Application for four new greenhouses added to the existing greenhouses south of the site, filed by Hummel Architects for Simplot Industries in an I-1 zone.

    Sept. 19, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.