Skip to content

Planning project · Planning application

Parcel consolidation sought for 56,000-square-foot refrigerated warehouse

The application would combine parcels on a 5-acre industrial site for a refrigerated warehouse and distribution center, plus a 10,000-square-foot office. It is in review, and the city has held a concept review.

In reviewPLN26-00695Filed July 22, 2026South Cole · 6159 S Visionary Ave+3 related filings
Site plan for Parcel consolidation sought for 56,000-square-foot refrigerated warehouse
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Parcel consolidation/ Warehouse/Distribution Center

Project name on file: 6159 S Visionary Ave

Timeline

  1. Oct. 13, 2026

    6 documents added

  2. Oct. 13, 2026

    Status changed from Submitted to In review

    Reported as “Neighborhood Meeting Review”.

  3. Aug. 13, 2026

    Planning Applications: Additional CR Needed

  4. Aug. 13, 2026

    Pending Application Submittal: Planning Applications in Review

  5. Aug. 13, 2026

    Concept Review Complete: Corrections Required

    Per email sent 7-30-2026Where alley access is not available and a lot has frontage on two or more streets, a single street access point shall be located on the street with the lowest traffic volume to the maximum extent practicable, unless the Planning Director determines that the access point on the street with the lowest traffic volume will adversely impact planned and existing pedestrian and bicycle facilities. The Planning Director in consultation with the Ada County Highway District (ACHD) and/or the Idaho Transportation Department may allow a second access point in unusual circumstances.Additionally ACHD may not allow access there as the street is not built out. Please reach out to them for their requirements.In the Industrial zoning districts, surface parking and drive aisles may be located between the street and the façade of the building, provided, the building is not placed more than 100 feet from the edge of pavement of the nearest travel lane and the parking area is adequately screened from the street.Please review the requirements of 11-04-08.10 Off-street loading facilities.Loading areas shall not be permitted between the primary façade of a building and the front lot line/property line.Loading spaces and access routes to loading spaces shall not interfere with parking lot or parking garage maneuvering areas or with designated on-site patron drop-off/pick up locations.Please review requirements for landscaping in a parking lot.

  6. Aug. 13, 2026

    Concept Review Complete: Generate AWS

  7. Aug. 13, 2026

    Concept Review Complete: CR Complete - Type 2

  8. Aug. 13, 2026

    Concept Review Complete: CR Complete - Type 3

  9. July 22, 2026

    Application Submittal: Online

  10. July 22, 2026

    Application filed

Documents

Site plans

  • Conceptual site layout sheet C001 showing lot lines, parking, loading dock, stormwater pond and easements for a warehouse development on Lot 1 and Lot 2.

    July 22, 2026 · 1 page · 707 KB · PDS-Other Small Docs

    Download Conceptual site layout
  • Plat map sheet showing the subdivision's location in the SW1/4 of the SE1/4 of Section 32, with lot areas and recorded ACHD sidewalk, storm drain, sewer and utility easements.

    July 22, 2026 · 1 page · 644 KB · PDS-Other Small Docs

    Download Visionary Subdivision No. 1 survey and plat map, sheet 1 of 3

Project narrative

  • Advisory concept review notes for a proposed 56,000 sf refrigerated warehouse and 10,000 sf office, covering impact fees, streetscape, sidewalks, and access requirements.

    Aug. 13, 2026 · 4 pages · 466 KB · PDS-Concept Review Summary Report

    Download Concept review summary for planning project PLN review
  • Advisory concept review summary covering a proposed 56,000 sf refrigerated warehouse and 10,000 sf office, with notes on impact fees, streetscape landscaping, sidewalks and access.

    Aug. 13, 2026 · 4 pages · 466 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Describes a proposed 56,000 sf refrigerated warehouse and distribution center with a 10,000 sf office on a greenfield site, with architect and project manager contacts.

    July 22, 2026 · 1 page · 26 KB · PDS-Other Small Docs

    Download Project description narrative

Application

  • Application for a new 57,000 sf refrigerated warehouse and distribution center with a 10,000 sf attached office in the I-1 zone.

    July 22, 2026 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.