Subdivision · Planning application
Council approves 162-unit apartment project on 6-acre site
The Boise City Council approved the plat for Filbert Cabanas Subdivision, creating one buildable lot and dedicating public right-of-way for the Hawkins Companies project. Construction hours are limited, and part of Vincent Street must be vacated before building permits are submitted for the lot.

From the filing
The application's description as it appears in City of Boise's record. See the official record
The Boise City Council approved the preliminary and final plat for Filbert Cabanas Subdivision at 1770 S Maple Grove Rd, in the R-2 zone. The plat creates one buildable lot and dedicates public right-of-way, allowing residential infill in an area the city describes as already surrounded by existing services.
184-unit multi-family development. CPA, Rezone to R-2, Subdivision, DR Major
Project name on file: Filbert Cabanas Subdivision
Timeline
Dec. 23, 2025
Appeal Period: Completed
Dec. 9, 2025
Public hearing: City Council
Dec. 8, 2025
Decision: Approved
Hearing marked “Approved” on 2025-12-08.
Dec. 8, 2025
Hearing: Approved
Nov. 20, 2025
Hearing Review: Completed
Nov. 18, 2025
Public hearing: City Council
Sept. 8, 2025
Public hearing: Planning and Zoning Commission
Outcome: Recommend Approval.
Sept. 8, 2025
Recommend Approval
Hearing marked “Recommend Approval” on 2025-09-08.
Sept. 8, 2025
Hearing: Recommend Approval
Sept. 2, 2025
Review Complete: Completed
Sept. 2, 2025
Current Planning: Complete
Aug. 12, 2025
Current Planning: In Review
Aug. 12, 2025
Assign Reviewers: Completed
July 16, 2025
Review Complete: Corrections Required
July 16, 2025
Current Planning: Corrections Required
July 2, 2025
Current Planning: In Review
July 2, 2025
Assign Reviewers: Completed
July 1, 2025
Fee Payment: Payment Received
July 1, 2025
Prescreen Review: Passed
June 26, 2025
Prescreen Review: Corrections Required
June 26, 2025
Prescreen Review: In Progress
June 24, 2025
Application Submittal: ePlanReview
June 24, 2025
Application filed
Documents
Site plans
- Download Preliminary plat
Preliminary plat drawing for a subdivision application, dated 8/12/2025, showing lot layout and parcel dimensions, though the scanned text is largely garbled.
Aug. 12, 2025 · 2 pages · 1.4 MB · PDS-Maps and Drawings
Plans
- Download Final subdivision plat, sheets 1 to 3
Three-sheet final plat for the Filbert Cabanas Subdivision showing lot layout, curve tables, certificates of owners, surveyor, and approvals in Boise.
Aug. 14, 2025 · 3 pages · 1.2 MB · PDS-Maps and Drawings
- Download Final subdivision plat
Three-sheet final plat for the Filbert Cabanas Subdivision, with boundary and lot layout, owner and surveyor certificates, and agency approval certificates.
Aug. 12, 2025 · 3 pages · 709 KB · PDS-Maps and Drawings
- Download Landscape plan sheets with plant schedules and tree calculations
Landscape plan drawings dated 8/12/2025 covering landscape cover, general notes, tree calculations, plant schedules, and buffers for a multifamily development.
Aug. 12, 2025 · 4 pages · 9.6 MB · PDS-Maps and Drawings
Project narrative
- Download Letter of intent and project narrative
Narrative for a 162-unit multi-family design review, preliminary and final plat, and property line adjustment, covering the project overview and vehicle parking approach.
Aug. 12, 2025 · 5 pages · 301 KB · PDS-Letter of Intent
Staff reports
- Download Deferral memo for the Nov. 18 City Council meeting
Staff memo recommending deferral to Dec. 9, 2025 because the agenda request had the wrong date and newspaper publishing could not be completed for this over-5-acre subdivision.
Nov. 14, 2025 · 1 page · 86 KB · PDS-Project Report/Memo
- Download Project report for the Sept. 8 Planning and Zoning Commission meeting
Staff report recommending approval of a preliminary and final plat for a one-lot subdivision with right-of-way dedication, consistent with the development code and comprehensive plan if conditions are met.
Sept. 2, 2025 · 73 pages · 27.8 MB · PDS-Project Report/Memo
Decisions
- Download Action letter approving Filbert Cabanas Subdivision plat
Notice that the City Council approved the preliminary and final plat for a one-lot subdivision, with a list of conditions of approval.
Dec. 12, 2025 · 11 pages · 224 KB · PDS-Action Letter
- Download Planning and Zoning Commission action letter
September 12, 2025 letter reporting the commission's recommendation of approval for the preliminary and final plat, subject to listed conditions of approval, forwarded to City Council.
Sept. 12, 2025 · 11 pages · 229 KB · PDS-Action Letter
Notices
- Download Notice of Dec. 9 Boise City Council public hearing
Hearing notice for the Filbert Cabanas Subdivision preliminary and final plat, one buildable lot on 6.12 acres, with instructions on submitting written and verbal testimony.
Nov. 19, 2025 · 2 pages · 972 KB · PDS-Legal Notice
- Download Notice of Nov. 18 Boise City Council public hearing
Hybrid-meeting public hearing notice for a preliminary and final plat subdivision of one buildable lot on 6.12 acres, with instructions for submitting testimony.
Oct. 29, 2025 · 2 pages · 1.4 MB · PDS-Legal Notice
- Download Notice of public hearing before the Planning and Zoning Commission
Postcard notice of a Planning and Zoning Commission public hearing on a subdivision application, with in-person, online and written testimony instructions.
Aug. 20, 2025 · 2 pages · 1.1 MB · PDS-Legal Notice
- Download Neighborhood meeting sign-in sheets
Sign-in sheets from several neighborhood meetings on this subdivision application, held between September 2023 and July 2025, with the facilitator's name and meeting dates.
Aug. 12, 2025 · 5 pages · 875 KB · PDS-Neighborhood Meeting
Application
- Download Subdivision preliminary/final application form
Application form for a 184-unit multi-family subdivision on a 6.12-acre parcel, with the zone change and related approvals listed as associated files.
June 24, 2025 · 3 pages · 201 KB · PDS-Application
Studies and reports
- Download Verbatim minutes of the Sept. 8, 2025 Planning and Zoning Commission meeting
Transcribed minutes of the Boise commission hearing on the Filbert Cabanas Subdivision preliminary and final plat, with staff presenting the one-lot plat and right-of-way dedication.
Oct. 13, 2025 · 22 pages · 81 KB · PDS-Minutes
- Download Existing tree inventory and analysis
Inventory and condition table for existing trees on and near the property, with ratings and notes on trees to be preserved and protected.
Aug. 12, 2025 · 1 page · 14.7 MB · PDS-Maps and Drawings
Correspondence
- Download Notification letter for the Dec. 9 City Council hearing
Letter to the applicant saying the subdivision plat application has been rescheduled to the Dec. 9, 2025 City Council hearing, with posting and comment deadlines.
Nov. 20, 2025 · 1 page · 113 KB · PDS-Correspondence
- Download Notification letter for the Nov. 18 City Council hearing
Letter to the applicant scheduling the subdivision plat application for a Nov. 18, 2025 City Council hearing and setting site-posting and proof-of-posting deadlines.
Oct. 23, 2025 · 1 page · 113 KB · PDS-Correspondence
- Download Boise School District comments
School district response reporting that the developer has arranged to meet district requirements, with projected student counts for three schools and no traffic or Safe Routes concerns.
Sept. 5, 2025 · 1 page · 193 KB · PDS-Agency Comments
- Download Ada County Highway District updated comments
Updated ACHD staff report with trip generation estimates, level of service findings, and site-specific conditions of approval for a 162-unit multi-family subdivision development.
Sept. 5, 2025 · 16 pages · 876 KB · PDS-Agency Comments
- Download Late correspondence for the Sept. 8 Planning and Zoning hearing
Senior planner's memo proposing a revised condition #3 on Vincent Street right-of-way vacation, plus updated ACHD comments and Boise School District comments with no concerns.
Sept. 5, 2025 · 18 pages · 1.2 MB · PDS-Correspondence
- Download Ada County Highway District staff report and comments
ACHD staff report on a 162-unit multi-family design review and preliminary plat, covering trip generation, level of service, planned improvements, and conditions of approval.
Sept. 2, 2025 · 16 pages · 876 KB · PDS-Agency Comments
- Download Boise Fire Department comments
Fire Department review of the 162-unit multifamily preliminary plat, listing hydrant spacing, aerial access, turning radius, addressing signage and access road requirements.
Sept. 2, 2025 · 2 pages · 189 KB · PDS-Agency Comments
- Download Boise Parks and Recreation tree mitigation comments
Parks and Forestry find the proposed 96 new trees (144 caliper inches) fully mitigate removal of six fair or good condition trees, with no concerns about species.
Sept. 2, 2025 · 1 page · 62 KB · PDS-Agency Comments
- Download Sewer and irrigation conditions from Public Works
Public Works memo listing standard pressurized irrigation and sewer conditions the subdivision must meet before final plat signing.
Sept. 2, 2025 · 3 pages · 80 KB · PDS-Agency Comments
- Download Solid Waste division comments
City of Boise Solid Waste staff reviewed the subdivision application, have no comments, and say solid waste is acceptable as planned, with a link to trash enclosure design standards.
Sept. 2, 2025 · 1 page · 64 KB · PDS-Agency Comments
- Download Street light conditions and comments
City Public Works street light trades comments listing subdivision conditions: easement, installation at designated locations, fees, bonding, and light placement.
Sept. 2, 2025 · 2 pages · 168 KB · PDS-Agency Comments
- Download Notification letter for the Sept. 8 Planning and Zoning Commission hearing
Letter to the applicant scheduling the subdivision application for a Sept. 8, 2025 hearing, with instructions on site posting, proof of posting, and agency comments.
Aug. 14, 2025 · 1 page · 103 KB · PDS-Correspondence
- Download Veolia water will-serve letter
Veolia confirms water service is available to the apartment project under its current tariffs, with new mains, services and hydrants required at the owner's cost, and the letter expires after twelve months.
Aug. 12, 2025 · 1 page · 305 KB · PDS-Other Small Docs
Public comments
- Public comment
Sept. 2, 2025 · 43 KB · PDS-Public Comment
- Public comment
Sept. 2, 2025 · 1.1 MB · PDS-Public Comment
- Public comment
Sept. 2, 2025 · 683 KB · PDS-Public Comment
- Public comment
Oct. 22, 2024 · 650 KB · PDS-Public Comment
- Public comment
Oct. 22, 2024 · 465 KB · PDS-Public Comment
- Public comment
Oct. 22, 2024 · 446 KB · PDS-Public Comment
- Public comment
Oct. 22, 2024 · 912 KB · PDS-Public Comment
- Public comment
Oct. 22, 2024 · 683 KB · PDS-Public Comment
Other documents
- Download Recorded avigation easement
Grant of surface and overhead avigation easements to Boise City for airport overflight, noise and height restrictions on the property, recorded with the subdivision application.
July 1, 2026 · 7 pages · 990 KB · PDS-Other Small Docs
- Receipt
Nov. 3, 2025 · 135 KB · PDS-Receipts
- Aerial map
Aug. 20, 2025 · 982 KB · PDS-Maps and Drawings
- Land use map
Aug. 20, 2025 · 634 KB · PDS-Maps and Drawings
- Noticing radius map
Aug. 20, 2025 · 620 KB · PDS-Maps and Drawings
- Zoning map
Aug. 20, 2025 · 640 KB · PDS-Maps and Drawings
- Plat legal description
Aug. 12, 2025 · 577 KB · PDS-Other Small Docs
- Statement of legal interest
Aug. 12, 2025 · 24 KB · PDS-Statement of Legal Interest
- Agency transmittal
Aug. 12, 2025 · 99 KB · PDS-Transmittal Agencies
- Receipt
July 1, 2025 · 131 KB · PDS-Receipts

