Skip to content

Subdivision · Planning application

Final plat approved for 39-lot subdivision on former farmland

The City Council approved the final plat on Sept. 1 for 39 buildable lots and eight common lots on about 11 acres, with conditions including a 10-foot detached sidewalk and a future pathway easement. Two lots were dropped to add a street that could connect north.

ApprovedSUB26-00030Filed June 12, 2026Northwest · 8750 N Bogart Ln+6 related filings
Site plan for Final plat approved for 39-lot subdivision on former farmland
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Lennar Homes' Meadowcrest Heights is a residential subdivision of 39 buildable lots and eight common lots on about 11.4 acres at 8750 N Bogart Lane in Boise. The City Council is being asked to approve the final plat, which dropped two lots from the original 41 to add a street that could connect to land to the north. About 8 acres is developable, at just under five homes per acre.

Residential subdivision-Final

Project name on file: Meadowcrest Heights

Timeline

  1. Sept. 15, 2026

    Appeal Period: Completed

  2. Sept. 3, 2026

    Review Complete: Completed

  3. Sept. 1, 2026

    Public hearing: City Council

    Outcome: Approved.

  4. Sept. 1, 2026

    Decision: Approved

    Hearing marked “Approved” on 2026-09-01.

  5. Sept. 1, 2026

    Hearing: Approved

  6. Aug. 27, 2026

    Review Complete: Completed

  7. Aug. 27, 2026

    Planning and Zoning: Complete

  8. June 22, 2026

    Planning and Zoning: In Review

  9. June 22, 2026

    Assign Reviewers: Completed

  10. June 22, 2026

    Fee Payment: Payment Received

  11. June 22, 2026

    Prescreen Review: Passed

  12. June 17, 2026

    Prescreen Review: In Progress

  13. June 16, 2026

    Prescreen Review: Corrections Required

  14. June 12, 2026

    Prescreen Review: In Progress

  15. June 12, 2026

    Application Submittal: ePlanReview

    Updated per missing fields SUB26-00030

  16. June 12, 2026

    Application filed

Documents

Site plans

  • Ada County street name review for the Meadowcrest Heights subdivision, listing approved and denied proposed street names with corrections requested, such as changing post types and directionals.

    July 9, 2026 · 7 pages · 9.4 MB · PDS-Other Small Docs

    Download Ada County street name review, second review of preliminary plat

Plans

  • Recorded-style subdivision plat showing lot layout, curve table, legend, and notes on irrigation service, right-to-farm language, and setbacks across three sheets.

    July 9, 2026 · 5 pages · 8.5 MB · PDS-Maps and Drawings

    Download Final plat, Meadowcrest Heights Subdivision
  • Landscape plan sheet covering general irrigation notes, general landscape notes, and contractor requirements for utilities, materials, and plant quantities on a subdivision project.

    July 9, 2026 · 5 pages · 6.4 MB · PDS-Maps and Drawings

    Download Landscape plan with irrigation and general notes

Project narrative

  • Applicant's cover letter submitting the final plat for a 39-lot residential subdivision with 8 common lots, stating it conforms to the approved preliminary plat and UDC requirements.

    July 9, 2026 · 1 page · 226 KB · PDS-Letter of Intent

    Download Final plat narrative letter of intent

Staff reports

Decisions

  • Letter notifying the applicant that the City Council approved the final plat for a 39-buildable-lot residential subdivision, subject to attached conditions of approval.

    Sept. 4, 2026 · 11 pages · 231 KB · PDS-Action Letter

    Download Council action letter on final plat approval

Application

  • Application for a 50-lot residential subdivision (41 buildable, 9 common lots) with annexation, on a 10.22-acre R-1C parcel in the hillside area.

    June 12, 2026 · 3 pages · 210 KB · PDS-Application

    Download Final subdivision application

Correspondence

  • Irrigation company says the property holds water shares, plans for water use need board approval, and no work is allowed in its canal or lateral easement without a license agreement.

    Aug. 21, 2026 · 1 page · 60 KB · PDS-Agency Comments

    Download Boise Valley Irrigation Ditch Co. comments
  • Fire Department memo approving the 49-lot subdivision final plat subject to eight code requirements covering hydrants, turnarounds, access widths, turning radii and parking restrictions.

    Aug. 21, 2026 · 2 pages · 216 KB · PDS-Agency Comments

    Download Boise Fire Department comments on final plat
  • Public Works conditions for the subdivision covering comprehensive drainage plan, hillside development, stormwater management and grading and erosion control.

    Aug. 21, 2026 · 1 page · 136 KB · PDS-Agency Comments

    Download Public Works hillside and drainage comments
  • Boise Parks and Recreation requests the tree mitigation table referenced in the landscape plan notes, and notes no arborist assessment was provided for 20 retained trees.

    Aug. 21, 2026 · 1 page · 108 KB · PDS-Agency Comments

    Download Parks and Recreation comments on tree mitigation and arborist assessment
  • Public Works memo listing standard pressure irrigation and sewer conditions the subdivision must meet before final plat signing, dated July 13, 2026.

    Aug. 21, 2026 · 3 pages · 172 KB · PDS-Agency Comments

    Download Sewer and irrigation conditions from Public Works
  • Public Works solid waste staff have no objection and approve residential cart service, noting that flag and dead-end lots need carry-out or cart corral arrangements and that Lots 3, 7 and 8 are inaccessible to…

    Aug. 21, 2026 · 1 page · 94 KB · PDS-Agency Comments

    Download Solid Waste comments
  • Public Works memo listing street light conditions for the subdivision: easement on the final plat, street light installation locations and fixture specifications, fees, and bonding terms.

    Aug. 21, 2026 · 3 pages · 190 KB · PDS-Agency Comments

    Download Street light comments from Public Works
  • City of Boise Public Works letter confirming the assured water supply application was received and determined complete.

    July 9, 2026 · 1 page · 91 KB · PDS-Other Small Docs

    Download Assured water supply application completeness letter

Other documents

  • Transmittal to agencies

    July 10, 2026 · 132 KB · PDS-Transmittal Agencies

  • Legal description

    July 9, 2026 · 545 KB · PDS-Other Small Docs

  • Submittal checklist

    July 9, 2026 · 909 KB · PDS-Other Small Docs

  • Statement of legal interest

    July 9, 2026 · 52 KB · PDS-Statement of Legal Interest

  • Receipt

    June 22, 2026 · 134 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.