Skip to content

Subdivision · Planning application

City Council approves three-lot subdivision for single-family homes

The council approved the preliminary and final plat on March 3, allowing three single-family lots on about 0.28 acres. Conditions include a detached sidewalk, street trees, and an arborist's report and tree mitigation plan before grading permits are issued.

ApprovedSUB25-00091Filed Nov. 3, 2025Southeast Boise · 2233 S Leadville Ave+2 related filings
Site plan for City Council approves three-lot subdivision for single-family homes
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The applicant proposes dividing the 0.28-acre property at 2233 S Leadville Avenue in Boise into three lots, each with one detached single-family home, which would replace the existing house on the site. City planning staff recommend approval, and the Planning and Zoning Commission will consider the request on February 2, 2026.

3 lot Sub and demo.

Project name on file: Pax Haven Subdivision

Timeline

  1. March 17, 2026

    Appeal Period: Completed

  2. March 3, 2026

    Public hearing: City Council

    Outcome: Approved.

  3. March 3, 2026

    Decision: Approved

    Hearing marked “Approved” on 2026-03-03.

  4. March 3, 2026

    Hearing: Approved

  5. Feb. 6, 2026

    Hearing Review: Completed

  6. Feb. 2, 2026

    Recommend Approval

    Hearing marked “Recommend Approval” on 2026-02-02.

  7. Feb. 2, 2026

    Hearing: Recommend Approval

  8. Jan. 24, 2026

    Review Complete: Completed

  9. Jan. 24, 2026

    Current Planning: Complete

  10. Nov. 25, 2025

    Current Planning: In Review

  11. Nov. 25, 2025

    Assign Reviewers: Completed

  12. Nov. 19, 2025

    Fee Payment: Payment Received

  13. Nov. 19, 2025

    Prescreen Review: Passed

  14. Nov. 17, 2025

    Prescreen Review: In Progress

  15. Nov. 3, 2025

    Application Submittal: ePlanReview

  16. Nov. 3, 2025

    Application filed

Documents

Site plans

  • Preliminary plat for a replat of one lot into single-family residential lots, with notes on re-subdivision zoning, easements, and irrigation water.

    Dec. 11, 2025 · 1 page · 1.3 MB · PDS-Maps and Drawings

    Download Preliminary plat, Pax Haven Subdivision

Plans

  • Landscape sheet listing applicable Boise code sections, zone R-2, site area, plant minimum sizes, tree counts and species, street buffer, and planting and maintenance notes.

    Jan. 7, 2026 · 1 page · 883 KB · PDS-Maps and Drawings

    Download Landscape plan, version 1 (landscape requirements and notes)
  • Surveyed final plat creating a residential subdivision as a replat of a portion of a lot in an earlier Rosedale subdivision filing, with basis of bearing, notes, and owner and agency certificates.

    Dec. 11, 2025 · 4 pages · 1.6 MB · PDS-Maps and Drawings

    Download Final plat, Pax Haven Subdivision
  • Landscape notes, plant size requirements, tree counts and species, and street buffer details for the subdivision site, dated Nov. 19, 2025.

    Dec. 11, 2025 · 1 page · 900 KB · PDS-Maps and Drawings

    Download Landscape plan, subdivision site

Project narrative

  • Narrative from the applicant's firm describing a three-lot single-family subdivision in the R-2 zone, setbacks, parking, and a requested detached-sidewalk waiver to save a mature tree.

    Dec. 11, 2025 · 1 page · 164 KB · PDS-Letter of Intent

    Download Letter of explanation for subdivision

Staff reports

Decisions

Application

  • Application to subdivide a 0.28-acre residential R-2 parcel into three buildable lots, with a waiver to keep the existing attached sidewalk and no detached sidewalk requirement.

    Nov. 19, 2025 · 3 pages · 207 KB · PDS-Application

    Download Subdivision application, preliminary/final plat
  • Application to subdivide a 0.28-acre residential R-2 parcel into three buildable lots, with a waiver to keep the existing attached sidewalk and no detached sidewalk requirement.

    Nov. 19, 2025 · 3 pages · 207 KB · PDS-Application

    Download Subdivision application, preliminary/final plat

Studies and reports

  • Arborist report for the Pax Haven subdivision covering trees on the site, including Siberian Elm and Silver Maple specimens; the text is garbled and largely unreadable.

    Sept. 2, 2026 · 6 pages · 2.0 MB · PDS-Other Small Docs

    Download Arborist report

Correspondence

  • Central District Health letter approving the final plat for central water and sewer facilities, with sanitary restrictions satisfied as of July 29, 2026.

    Aug. 10, 2026 · 1 page · 412 KB · PDS-Agency Comments

    Download Central District Health comments
  • Letter from Boise Planning and Development Services notifying the applicant that the subdivision application is scheduled for a March 3, 2026 City Council hearing, with agency comments and a project report to follow.

    Feb. 13, 2026 · 1 page · 109 KB · PDS-Correspondence

    Download Notice of the March 3 City Council hearing
  • Public Works conditions on subdivision grading, erosion control and a required stormwater management plan before permits are issued.

    Nov. 24, 2025 · 1 page · 139 KB · PDS-Agency Comments

    Download Public Works drainage comments

Other documents

  • Aerial map

    Jan. 13, 2026 · 963 KB · PDS-Maps and Drawings

  • Land use map

    Jan. 13, 2026 · 583 KB · PDS-Maps and Drawings

  • Zoning map

    Jan. 13, 2026 · 612 KB · PDS-Maps and Drawings

  • Agency transmittal

    Jan. 5, 2026 · 100 KB · PDS-Transmittal Agencies

  • Statement of legal interest

    Dec. 11, 2025 · 493 KB · PDS-Statement of Legal Interest

  • Receipt

    Nov. 19, 2025 · 134 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.