Skip to content

Planning project · Planning application

Rafting outfitter seeks two-story river access facility with play areas and event space

The proposal for a 2.95-acre site includes a two-story operations building, outdoor play areas with a grassy sledding slope, and an event area for food trucks or live music. It is under city review and is slated for a City Council decision.

In reviewPLN26-00624Filed June 26, 2026Southeast Boise · 400 W Parkcenter Blvd+8 related filings
Site plan for Rafting outfitter seeks two-story river access facility with play areas and event space
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

A rafting outfitter that runs guided Boise River trips wants to build a facility at 400 W Parkcenter Blvd with a new building, outdoor play areas including a grassy slope for winter sledding, and an event area that could host food trucks or live music. The site would give rafters access to the river from the Greenbelt. This document is a city concept review of the proposal and lists what the applicant must address before hearings.

Outdoor Recreation

Project name on file: 444 W PARKCENTER BLVD - CUP, CVA, SOS, DRH, CFH(2)

Timeline

  1. Oct. 7, 2026

    Pending Application Submittal: Planning Applications in Review

  2. Sept. 30, 2026

    IDR Review Complete: IDR Complete With Recommendations

  3. Sept. 16, 2026

    Concept Review Complete: Generate AWS

    Generate AWS app per S. Mortensen

  4. Aug. 20, 2026

    Neighborhood Meeting Review: Completed

    NM held 8-17-26

  5. Aug. 4, 2026

    Concept Review Complete: CR Complete - Type 4

  6. June 26, 2026

    Application Submittal: Online

  7. June 26, 2026

    Application filed

Documents

Site plans

Renderings

Plans

  • Revised site plan showing setbacks, 49 vehicle stalls, 23 bike stalls, a stormwater pond, solid waste and cart corral areas, and greenbelt signage.

    Sept. 24, 2026 · 2 pages · 9.4 MB · PDS-Other Small Docs

    Download Revised site plan presented at IDR
  • Cover letter from Boise River Outdoor Opportunities and Breckon Land Design proposing a 2.95-acre riverfront rafting commercial development, with existing easements and site constraints.

    Sept. 10, 2026 · 8 pages · 4.3 MB · PDS-Other Small Docs

    Download Interdepartmental review meeting submittal letter
  • Schematic first and second floor plans for the Boise River Outdoor Opportunities building, with room areas and a grand total of 2939 SF.

    Aug. 20, 2026 · 2 pages · 4.8 MB · PDS-Other Small Docs

    Download Building floor plans, schematic
  • Floor plans for a four-story building showing office and a third-floor studio, with gross floor area totals of 4,970 SF and parking calculations of 11 stalls.

    June 26, 2026 · 4 pages · 1.0 MB · PDS-Other Small Docs

    Download Floor plans, first through fourth floors

Project narrative

  • Advisory summary of a pre-application concept review for a rafting outfitter facility with outdoor play areas, an event area and a two-story operations building, plus neighborhood meeting instructions.

    Aug. 4, 2026 · 2 pages · 451 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Describes a four-story mixed-use building, 80% office for professional services and 20% residential, and the design review and floodplain permits it will need.

    June 26, 2026 · 1 page · 112 KB · PDS-Other Small Docs

    Download Project description

Staff reports

Notices

  • Invitation from the applicant, Boise River Outdoor Opportunities, LLC, to an Aug. 17, 2026 neighborhood meeting on a proposed outfitter facility with outdoor recreation, a variance, and several overlay and floodplain…

    Aug. 20, 2026 · 3 pages · 152 KB · PDS-Neighborhood Meeting

    Download Neighborhood meeting invitation letter
  • Applicant's summary of the Aug. 17 neighborhood meeting, attendance of 16, drawings shared, and feedback received at the meeting and by phone or email.

    Aug. 20, 2026 · 11 pages · 801 KB · PDS-Other Small Docs

    Download Neighborhood meeting summary form

Application

  • Application for a four-story mixed-use building with about 80% professional office space and 20% residential, filed by the applicant Boise River Outdoor Opportunities.

    June 26, 2026 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form

Studies and reports

  • Summarizes the Sept. 24 interdepartmental review meeting for a rafting outfitter, outdoor event center, food truck court and pop-up market, with City department recommendations such as dumpster enclosure requirements.

    Sept. 30, 2026 · 12 pages · 1.1 MB · PDS-Interdepartmental Review Summary Report

    Download Interdepartmental review summary report
  • Legal metes-and-bounds description of a 0.10-acre utility easement on a lot within a subdivision, prepared by a surveying firm for the vacation request, dated May 20, 2022.

    Aug. 20, 2026 · 2 pages · 784 KB · PDS-Other Small Docs

    Download Utility easement vacation description

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.