Assured water supply · Planning application
Water supply review under way for proposed cottage village
The city is reviewing an assured water supply application for a project described as a cottage village on vacant land. Filed Sept. 16, it includes a water demand estimate, a site plan and a location map. The number of homes is not stated.

From the filing
The application's description as it appears in City of Boise's record. See the official record
Cottage Village
Project name on file: Parcel R8123010344 - S Wilson St
Timeline
Sept. 28, 2026
Prescreen Review: Prescreen Approved
Sept. 21, 2026
Prescreen Review: Corrections Required
Please upload the Demand Estimate Worksheet as a PDF.
Sept. 16, 2026
Application Submittal: In Office
Sept. 16, 2026
Application filed
Documents
Site plans
- Download Compiled site location map and site plan
Five-page compilation of the site location map and site plan, with key notes for bike parking, EV charging, mailbox, utilities, fencing and a unit mix summary of five two-bedroom units.
Sept. 16, 2026 · 5 pages · 4.8 MB · PDS-Other Small Docs
Application
- Download Assured water supply application
Application for an assured water supply review for a Cottage Village project on a single parcel, submitted by The Land Architect LLC on behalf of the owner.
Sept. 16, 2026 · 2 pages · 153 KB · PDS-Application
- Download Filled-out assured water supply application B
Section A applicant information for an Assured Water Supply Application B, covering a development served by a city water provider, with contact details and a PLN.
Sept. 16, 2026 · 10 pages · 184 KB · PDS-Other Small Docs
Studies and reports
- Download Water demand estimate worksheet
Calculator worksheet estimating average and maximum daily water demand at buildout for five residential customers and no commercial or industrial customers.
Sept. 22, 2026 · 4 pages · 210 KB · PDS-Other Small Docs
Correspondence
- Download Veolia water serviceability letter
Veolia confirms water service is available under its current tariffs, requiring new mains, service lines and fire hydrants funded by the developer, with the letter expiring after twelve months.
Sept. 17, 2026 · 1 page · 264 KB · PDS-Other Small Docs
- Download Veolia Water fire flow availability letter
Veolia Water Idaho reports hydrant water pressure and flow available for fire sprinkler design, to be attached to plan sets for fire department review.
Sept. 16, 2026 · 1 page · 111 KB · PDS-Other Small Docs
Other documents
- Download Filled out demand estimate worksheet
Sept. 16, 2026 · 44 KB · PDS-Other Small Docs

