Skip to content

Subdivision · Planning application

Final plat for realigned Cherry Lane road approved

The city approved the plat on Oct. 20 with conditions, including proof that irrigation assessments are paid and a memorandum of understanding on Lift Station 5 improvements. The plat creates three residential, three commercial and one industrial lot, and final plats for the residential lots will come later.

ApprovedSPF-00291-2025Filed July 1, 2025North Nampa · Middleton Rd+7 related filings
Site plan for Final plat for realigned Cherry Lane road approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

The application is a final plat for the East Ranch-Cherry Lane Subdivision, which realigns Cherry Lane through the East Ranch development near Middleton Road in Nampa and creates new public right-of-way and new parcel boundaries along it. The plat covers five parcels totaling 134.57 acres, zoned BC (Community Business), IL (Light Industrial) and RS4 (Single Family Residential), with three residential, three commercial and one industrial lot proposed. Final plats for the residential lots will come later, and this item is a recommendation to City Council.

Collector road and utility improvements for the new proposed alignment of Cherry Lane and a portion of the existing Laster Lane. No single family dwelling are proposed as a part of this phase. This phase is for critical infrastructure required of the East Ranch Subdivision.

Project name on file: East Ranch Cherry Lane

Timeline

  1. July 15, 2026

    20 documents added

  2. July 15, 2026

    Landscape Approval

  3. Oct. 21, 2025

    City Council Decision/Action Letter

  4. Oct. 21, 2025

    P&Z Commision Decision/Action Letter

  5. Oct. 20, 2025

    Decision: Approved with Conditions

    Nampa City Council: Approved with Conditions.

  6. Oct. 20, 2025

    Public hearing: Nampa City Council

  7. Sept. 10, 2025

    Notice to Agencies/Departments

  8. Sept. 10, 2025

    Set Date for Public Meeting

  9. Sept. 4, 2025

    Assess Fees (Subdivision)

  10. July 16, 2025

    Plan Intake Passed

  11. July 16, 2025

    Accepted for review

  12. July 10, 2025

    Plan Intake Failed

  13. July 1, 2025

    Application filed

Documents

Site plans

  • Approved preliminary plat for East Ranch Subdivision, 10 pages, showing lot and block layout, easements, curve table, and general notes on setbacks, irrigation and drainage.

    July 1, 2025 · 10 pages · 5.3 MB · Preliminary Plat

    Download Approved preliminary plat

Plans

  • Approved landscape and irrigation plan sheets for the East Ranch subdivision on Cherry Lane, including plant schedules and overall landscape requirements.

    July 15, 2026 · 29 pages · 34.4 MB · APPROVED Landscape-Irrigation Plans

    Download Landscape and irrigation plans, approved set
  • Revised final subdivision plat for East Ranch Subdivision, Cherry Lane, with sheet index, legend, reference subdivisions and surveys, and monument certificate.

    Aug. 18, 2025 · 8 pages · 2.4 MB · Final Plat Revised

    Download Final plat, revised
  • July 16, 2025 · 1.5 MB · Phasing Plan

    Download Phasing plan
  • Character renderings of the single-family (RS4) homes proposed for the subdivision, shown on one page.

    July 1, 2025 · 1 page · 46 KB · Building Elevations

    Download Building elevations and character renderings, single-family (RS4)
  • Construction drawing set for the East Ranch Subdivision Cherry Lane project, with cover, general notes, demolition, paving, drainage, lighting, striping and utility sheets.

    July 1, 2025 · 53 pages · 44.8 MB · Improv/Const Drawings

    Download Civil improvement plans, full set
  • Landscape plan set for the East Ranch Subdivision on Cherry Lane, with a plant schedule of trees, shrubs, perennials, grasses and ground covers, plus tree-spacing requirements.

    July 1, 2025 · 14 pages · 17.3 MB · Landscape Plans

    Download Landscape plans, overall sheet and plant schedule
  • Zoning schedule and open space calculations for the subdivision, showing required versus provided qualified and common open space, including landscape buffer credit.

    July 1, 2025 · 1 page · 1.3 MB · Open Space Exhibit

    Download Overall open space exhibit

Project narrative

  • Cover letter from the project engineer submitting the final plat, summarizing 360 single-family lots, 45 common lots, 81.80 acres, and open space amenities.

    July 1, 2025 · 1 page · 20 KB · Narrative

    Download Cover letter for final plat application

Staff reports

Decisions

  • Letter from the Nampa Planning and Zoning Commission recommending approval of the final plat for the Cherry Lane realignment, subject to conditions of approval including surveyor, engineering, and irrigation district…

    Oct. 21, 2025 · 2 pages · 183 KB · Decision Letter

    Download Final plat approval decision letter

Application

  • Master application for the East Ranch Subdivision Cherry Lane right-of-way improvements, filed with the City of Nampa, listing applicant, owner, and project details.

    Aug. 18, 2025 · 2 pages · 475 KB · Application Revised

    Download Master application form, final subdivision plat
  • Application requesting public street names for a realigned Cherry Lane and new W. Lapin, W. Cobbler and W. Luxardo streets, tied to the final subdivision plat.

    July 1, 2025 · 1 page · 375 KB · Engrg Street Name Application

    Download Public street name application for East Ranch Subdivision

Studies and reports

  • Kimley-Horn memo analyzing whether a pedestrian crossing is warranted at the Cherry Lane and Stiehl Creek Drive intersection, prepared per a city council approval condition.

    July 1, 2025 · 7 pages · 6.2 MB · Ped Crossing Warrant Analysis

    Download Pedestrian crossing warrant analysis
  • Traffic speed study for the Cherry Lane road segment from the subdivision to Midland Boulevard, covering existing conditions, data analysis, MUTCD and FHWA methodology, and recommendations.

    July 1, 2025 · 21 pages · 6.6 MB · Cherry Ln Speed Study

    Download Speed study for Cherry Lane
  • Final drainage report for the Cherry Lane improvements in the East Ranch Subdivision, covering floodplain status, hydrology, storage volumes, conveyance and inlet sizing.

    July 1, 2025 · 51 pages · 3.1 MB · Storm Water Reports

    Download Final drainage report
  • Geotechnical evaluation of the 137-acre mixed-use East Ranch site covering soils, groundwater, seismicity and lab testing, prepared by GeoTek, Inc. for the developer.

    July 1, 2025 · 58 pages · 2.7 MB · Geotech/Soil Reports

    Download Preliminary geotechnical evaluation

Other documents

  • Checklist

    Sept. 4, 2025 · Checklist

  • Revised legal description

    Aug. 18, 2025 · Legal Description Revised

  • Affidavit of legal interest

    Sworn statement from the applicant establishing legal interest in the property covered by this final subdivision plat application.

    July 1, 2025 · Affidavit of Legal Interest

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.