Skip to content

Subdivision · Planning application

Nampa approves 216 single-family lots in first phase of East Ranch subdivision

The city approved the final plat for the first phase of the 79-acre East Ranch Subdivision on Dec. 1 with conditions, including traffic reports and irrigation approvals. Two additional rural-residential lots will be subdivided in later phases.

ApprovedSPF-00293-2025Filed Aug. 8, 2025North Nampa · N Middleton Rd+7 related filings
Site plan for Nampa approves 216 single-family lots in first phase of East Ranch subdivision
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Final plat for East Ranch Subdivision No. 1, a single-family residential subdivision on about 79 acres off N Middleton Rd in Nampa. The plan shows 216 residential lots and 19 common lots, and city staff recommend approval to the City Council subject to conditions.

216 single-family residential buildable lots within a phase of the East Ranch Subdivision. Two (2) other RS-4 lots will be created with this plat that will be subdivided with future phases.

Project name on file: East Ranch No 1

Timeline

  1. Sept. 17, 2026

    24 documents added

  2. Dec. 2, 2025

    City Council Decision/Action Letter

  3. Dec. 2, 2025

    P&Z Commision Decision/Action Letter

  4. Dec. 1, 2025

    Decision: Approved with Conditions

    Nampa City Council: Approved with Conditions.

  5. Dec. 1, 2025

    Public hearing: Nampa City Council

  6. Sept. 30, 2025

    Notice to Agencies/Departments

  7. Sept. 30, 2025

    Set Date for Public Meeting

  8. Sept. 29, 2025

    Plan Intake Passed

  9. Sept. 29, 2025

    Assess Fees (Subdivision)

  10. Sept. 29, 2025

    Accepted for review

  11. Aug. 12, 2025

    Plan Intake Failed

  12. Aug. 8, 2025

    Application filed

Documents

Site plans

  • Final plat for Cherry Lane Phase 1B showing lots, blocks and public right-of-way dedication, with Southwest District Health and county signatures noted in the filename.

    Sept. 17, 2026 · 7 pages · 2.9 MB · Available Online

    Download Cherry Lane Phase 1B final subdivision plat with signatures
  • Survey plat by Kimley-Horn that subdivides the land into lots and blocks and dedicates public right-of-way, easements, and tie lines for East Ranch Subdivision No. 1A.

    Sept. 16, 2026 · 8 pages · 20.6 MB · Phase 1A revision 09-11-2026

    Download Final subdivision plat, Phase 1A, revision 6
  • Revised overall open space plan and zoning schedule showing qualified and common open space calculations for Phase 1 of the East Ranch subdivision.

    Sept. 26, 2025 · 1 page · 2.1 MB · Open Space Exhibit Revised

    Download Open space exhibit, revised (Phase 1)
  • Approved preliminary plat for East Ranch Subdivision, 10 pages, showing lot and block layout, easements, curve table, and general notes on setbacks, irrigation and drainage.

    Aug. 8, 2025 · 10 pages · 5.3 MB · Preliminary Plat

    Download Approved preliminary plat

Plans

  • Landscape plan sheets for the East Ranch No. 1 subdivision, including plant schedule, fencing, paving, playground surfacing, and site furnishings, prepared by Kimley-Horn and Associates.

    Sept. 29, 2025 · 11 pages · 109.5 MB · Landscape Plans

    Download Landscape plans with plant schedule and reference notes
  • Revised final plat drawing for East Ranch Subdivision No. 1, showing blocks, lots, boundary lines, easements and survey monuments tied to section corners.

    Sept. 26, 2025 · 11 pages · 3.7 MB · Final Plat Revised

    Download Final plat, East Ranch Subdivision No. 1 (revised)
  • Character renderings of the single-family (RS4) homes proposed for the subdivision, shown on one page.

    Aug. 8, 2025 · 1 page · 46 KB · Building Elevations

    Download Building elevations and character renderings, single-family (RS4)
  • Civil improvement plans for the final plat, including the legal description, site data, sheet list and boundary calls for the subdivision's 216 residential lots and 14 common lots.

    Aug. 8, 2025 · 68 pages · 66.1 MB · Improv/Const Drawings

    Download Construction drawings, East Ranch Subdivision No. 1
  • Landscape plan sheets with plant schedule, fencing, mulch, playground surfacing, site furnishings and reference notes, prepared by Kimley-Horn and Associates.

    Aug. 8, 2025 · 11 pages · 109.5 MB · Landscape Plans

    Download Landscape plans, plant schedule and reference notes

Project narrative

  • Transmittal letter from the engineer describing the 360-lot single-family subdivision with 45 common lots, lot sizes, density, open space, and amenities.

    Aug. 8, 2025 · 1 page · 20 KB · Narrative

    Download Cover letter for final plat application

Staff reports

  • Staff recommends the final plat as substantially conforming to the preliminary plat, while noting the Idaho Transportation Department withholds plat signing until traffic reports are submitted.

    Nov. 19, 2025 · 27 pages · 7.1 MB · Available Online

    Download Staff report on East Ranch Subdivision No. 1 final plat

Decisions

Application

  • Planning and zoning master application for the final subdivision plat of East Ranch No 1, listing the applicant, owner and engineer contacts, with the related preliminary plat and application noted.

    Sept. 26, 2025 · 2 pages · 738 KB · Application Revised

    Download Master application for final subdivision plat
  • Application from Kimley-Horn & Associates requesting names for new local public streets in the East Ranch Subdivision No. 1, with a Master Site Plan attached for proposed names and layout.

    Aug. 8, 2025 · 2 pages · 1.3 MB · Public Street Name Application

    Download Public street name application

Studies and reports

  • Geotechnical evaluation by GeoTek, Inc. covering site soils, groundwater, seismicity, laboratory testing and conclusions for the 137-acre East Ranch mixed-use development.

    Aug. 8, 2025 · 67 pages · 3.1 MB · Geotech/Soil Reports

    Download Geotechnical evaluation report
  • Piezometer readings from test pits at the East Ranch site, September 2023 through August 2024, with a site exploration plan showing test pit locations.

    Aug. 8, 2025 · 2 pages · 174 KB · Groundwater Montoring

    Download Groundwater monitoring report
  • Kimley-Horn memo estimating when the study intersection will warrant a traffic signal as each phase of the development is built out, for the city engineer.

    Aug. 8, 2025 · 76 pages · 19.6 MB · Signal Threshold Phasing Analysis

    Download Signal threshold phasing analysis memo
  • Final drainage report for East Ranch Subdivision No. 1 covering floodplain classification, offsite hydrology, storage volumes, and storm drain and inlet conveyance sizing.

    Aug. 8, 2025 · 54 pages · 3.2 MB · Storm Water Reports

    Download Final drainage report

Other documents

  • Sept. 17, 2026 · 100 KB · Available Online

    Download Subdivision 1B third review
  • Final plat review checklist, third review

    Sept. 16, 2026 · Final plat review checklist-3rd review

  • Affidavit for East Ranch No. 1

    Sept. 29, 2025 · Affidavit

  • Application checklist

    Sept. 29, 2025 · Checklist

  • Legal description, East Ranch Subdivision No. 1

    Aug. 8, 2025 · Legal Description - Word

  • Legal description, Subdivision No. 1

    Aug. 8, 2025 · Legal Description

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.