Skip to content

Subdivision · Planning application

Final plat approved for 144 single-family lots in East Ranch Subdivision No. 2

The Nampa City Council approved the final plat on Dec. 15 with conditions covering traffic study review, abandoning any onsite wells or septic systems, and paying irrigation assessments. The phase covers about 28.77 acres and includes 19 common lots.

ApprovedSPF-00300-2025Filed Oct. 10, 2025North Nampa · 0 N Middleton Rd+7 related filings
Site plan for Final plat approved for 144 single-family lots in East Ranch Subdivision No. 2
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Lennar Homes of Idaho is seeking final plat approval for East Ranch Subdivision No. 2 on about 28.77 acres at 0 N Middleton Rd in Nampa, in the RS4 single-family residential zone. The plat would create 144 single-family residential lots and 19 common lots, and the item goes to the Planning & Zoning Commission as a consent agenda item with a staff recommendation to the City Council.

144 single-family residential buildable lots within a phase of the East Ranch Subdivision.

Project name on file: East Ranch No 2

Timeline

  1. Dec. 18, 2025

    City Council Decision/Action Letter

  2. Dec. 18, 2025

    P&Z Commision Decision/Action Letter

  3. Dec. 17, 2025

    18 documents added

  4. Dec. 15, 2025

    Decision: Approved

    Nampa City Council: Approved.

  5. Dec. 15, 2025

    Public hearing: Nampa City Council

  6. Nov. 6, 2025

    Set Date for Public Meeting

  7. Nov. 6, 2025

    Notice to Agencies/Departments

  8. Oct. 30, 2025

    Assess Fees (Subdivision)

  9. Oct. 15, 2025

    Plan Intake Passed

  10. Oct. 15, 2025

    Accepted for review

  11. Oct. 10, 2025

    Application filed

Documents

Site plans

  • Approved preliminary plat for East Ranch Subdivision, 10 pages, showing lot and block layout, easements, curve table, and general notes on setbacks, irrigation and drainage.

    Oct. 10, 2025 · 10 pages · 5.3 MB · Preliminary Plat

    Download Approved preliminary plat

Plans

  • Revised open space exhibit with zoning schedule showing qualified and common open space calculations and the overall open space plan for Phase 2 of East Ranch.

    Oct. 29, 2025 · 1 page · 1.9 MB · Open Space Exhibit Revised

    Download Open space exhibit, revised (Phase 2)
  • Character renderings of the single-family (RS4) homes proposed for the subdivision, shown on one page.

    Oct. 10, 2025 · 1 page · 46 KB · Building Elevations

    Download Building elevations and character renderings, single-family (RS4)
  • Civil construction drawing set for the second phase of the East Ranch subdivision in Nampa, prepared by Kimley-Horn and Associates, with cover sheet, contacts and sheet index.

    Oct. 10, 2025 · 53 pages · 46.5 MB · Improv/Const Drawings

    Download Civil improvement plans, cover sheet and sheet list
  • Survey plat showing lots, blocks, easements, monuments and boundary lines for the second phase of East Ranch Subdivision, with a monument certificate.

    Oct. 10, 2025 · 9 pages · 2.8 MB · Final Plat

    Download Final plat for East Ranch Subdivision No. 2
  • Landscape plan sheets for the subdivision, with the plant schedule (trees, shrubs and evergreens), hardscape and fencing notes, and site furnishings specifications.

    Oct. 10, 2025 · 8 pages · 21.0 MB · Landscape Plans

    Download Landscape plans, plant schedule and reference notes

Project narrative

Staff reports

  • Planning staff analysis recommending City Council approval of the final plat, with agency comments including Idaho Transportation Department's request for traffic generation figures.

    Dec. 11, 2025 · 52 pages · 42.0 MB · Staff Report

    Download Staff report for East Ranch Subdivision No. 2 final plat

Decisions

Application

  • Revised master application for the final subdivision plat of East Ranch No 2, filed by Kimley-Horn & Associates as project engineer for the owner, Lennar.

    Oct. 29, 2025 · 2 pages · 736 KB · Application revised

    Download Revised final subdivision plat application
  • Kimley-Horn & Associates applies for proposed public street names for new local streets in the East Ranch Subdivision No. 2, with a Master Site Plan attached.

    Oct. 10, 2025 · 2 pages · 1.2 MB · Street Name Application

    Download Public street name application

Studies and reports

  • Geotechnical evaluation by GeoTek, Inc. covering site soils, groundwater, seismicity, laboratory testing and conclusions for the 137-acre East Ranch mixed-use development.

    Oct. 10, 2025 · 67 pages · 3.1 MB · Geotech/Soil Reports

    Download Geotechnical evaluation report
  • Piezometer readings from test pits at the East Ranch site, September 2023 through August 2024, with a site exploration plan showing test pit locations.

    Oct. 10, 2025 · 2 pages · 174 KB · Groundwater Monitoring

    Download Groundwater monitoring report
  • Final drainage report for East Ranch Subdivision No. 2 covering floodplain classification, offsite hydrology, storage volumes, and storm drain and inlet sizing.

    Oct. 10, 2025 · 38 pages · 10.3 MB · Storm Water Reports

    Download Final drainage report

Other documents

  • Application checklist, East Ranch No. 2

    Oct. 30, 2025 · Checklist

  • Affidavit of legal interest

    Sworn statement from the applicant establishing legal interest in the property covered by this final subdivision plat application.

    Oct. 10, 2025 · Affidavit of Legal Interest

  • Legal description, East Ranch Subdivision No. 2

    Oct. 10, 2025 · Legal Description - Word

  • Legal description, subdivision No. 2

    Oct. 10, 2025 · Legal Description

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.