Skip to content

Subdivision · Planning application

Nampa approves plan for 43 cottage-style homes

The Planning and Zoning Commission approved the preliminary plat for 43 two-story, two-bedroom detached homes on about 3.06 acres on Jan. 13. Conditions require lots of at least 2,000 square feet before the final plat, and well and septic systems must be removed when each lot is built.

ApprovedSPP-00165-2025Filed Oct. 29, 2025South Nampa · 2321 Sunny Ridge Rd+4 related filings
Site plan for Nampa approves plan for 43 cottage-style homes
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Greenhurst Cottages proposes 43 detached cottage-style homes, each on its own small lot, on about 3.06 acres at 2321 Sunny Ridge Rd in Nampa, southwest of the Greenhurst and Sunnyridge intersection. The homes would be two-story with two bedrooms and a single-car garage, arranged around private streets and a shared central courtyard. This is a preliminary plat request that the Planning & Zoning Commission was scheduled to consider in January 2026.

Preliminary Plat for the Greenhurst Cottage Community, a 43 lot cottage style planned unit development for single family detached residential neighborhood.

Project name on file: Greenhurst Cottages

Timeline

  1. Jan. 14, 2026

    22 documents added

  2. Jan. 14, 2026

    Property Postings

  3. Jan. 14, 2026

    Notice to Area Property Owners

  4. Jan. 14, 2026

    P&Z Commision Decision/Action Letter

  5. Jan. 13, 2026

    Decision: Approved

    Nampa Planning and Zoning Commission: Approved.

  6. Jan. 13, 2026

    Public hearing: Nampa Planning and Zoning Commission

  7. Dec. 23, 2025

    Notice to Agencies/Departments

  8. Nov. 10, 2025

    Assess Fees (Subdivision)

  9. Oct. 30, 2025

    Plan Intake Passed

  10. Oct. 30, 2025

    Accepted for review

  11. Oct. 29, 2025

    Plan Intake Failed

  12. Oct. 29, 2025

    Application filed

Documents

Site plans

  • Signed preliminary plat sheets (PP1.0 and PP2.0) showing lot and block layout, private street sections and utilities, dated Jan. 5, 2026.

    Jan. 5, 2026 · 2 pages · 1.1 MB · PDF Prelim Plat

    Download Preliminary plat, Greenhurst Cottages Subdivision
  • Open space exhibit sheet for the Greenhurst Cottages preliminary subdivision plat, prepared by CSW and dated Oct. 17, 2025.

    Oct. 29, 2025 · 1 page · 736 KB · Open Space Exhibit

    Download Preliminary plat open space exhibit
  • Preliminary plat drawing sheets for the Greenhurst Cottages subdivision, showing lot dimensions, private streets, and a 29-foot private street section, dated Oct. 17, 2025.

    Oct. 29, 2025 · 2 pages · 1.0 MB · Prelim Plat

    Download Preliminary plat with lot layout and private street sections

Plans

Project narrative

  • Cover letter from the applicant's representative requesting preliminary plat approval for a 43-lot cottage cluster planned unit development, with a project narrative table of contents.

    Oct. 29, 2025 · 5 pages · 845 KB · Narrative

    Download Cover letter and project narrative for preliminary plat

Staff reports

  • Planning staff analysis recommending approval or denial of a 43-unit cottage subdivision preliminary plat, with zoning, utilities and applicable code sections reviewed.

    Jan. 14, 2026 · 46 pages · 24.0 MB · Staff Report

    Download Staff report for Greenhurst Cottages preliminary plat

Decisions

  • Planning and Zoning Commission approval of the 43-lot cottage subdivision preliminary plat, with conditions on lot sizes, wells and septic, water rights, and utilities.

    Jan. 14, 2026 · 2 pages · 182 KB · Decision letter

    Download Preliminary plat approval decision letter

Notices

  • Applicant's notice of a May 22, 2025 on-site neighborhood meeting on the proposed commercial/retail and cottage cluster residential development, required before filing applications.

    Oct. 30, 2025 · 1 page · 179 KB · Neighborhood Mtg Notice

    Download Neighborhood meeting notice for May 22 site meeting

Application

  • Staff notes from the Sept. 17, 2025 pre-application meeting covering zoning, PUD standards, landscaping, buffers, fencing and irrigation requirements for a cottage-style residential subdivision.

    Oct. 29, 2025 · 6 pages · 751 KB · Pre-Application Meeting Notes

    Download Pre-application planning and zoning property inquiry notes

Studies and reports

  • Drainage basin areas, runoff coefficients, and seepage bed sizing and volume calculations for four basins, prepared by Corinne Graham, PE, dated Jan. 5, 2026.

    Jan. 5, 2026 · 4 pages · 282 KB · Storm Water Reports

    Download Preliminary storm drainage calculations
  • Preliminary geotech opinion covering shallow bedrock, groundwater depths, surface soils suitability for structural fill, and a preliminary foundation bearing capacity.

    Oct. 29, 2025 · 10 pages · 1.2 MB · Geotech/Soil Reports

    Download Geotechnical feasibility opinion
  • Storm drainage basin characteristics, seepage bed sizing and volume adequacy checks for five basins, prepared by Corinne Graham, PE, dated October 24, 2025.

    Oct. 29, 2025 · 4 pages · 225 KB · Storm Water Reports

    Download Preliminary storm drainage calculations

Other documents

  • Preliminary plat checklist

    Nov. 10, 2025 · Checklist

  • Legal description, Parcel B

    Oct. 29, 2025 · Legal Description Parcel B - Word

  • Neighborhood meeting sign-in sheet

    Sign-in sheet from the neighborhood meeting held May 22, 2025, for the preliminary subdivision plat application.

    Oct. 29, 2025 · Neighborhood Mtg Sign-In Sheet

  • Parcel B legal description, signed

    Oct. 29, 2025 · Legal Description Parcel B

  • Signed affidavit of legal interest, Sunny Acre PBA

    Oct. 29, 2025 · Affidavit of Legal Interest

  • Vicinity map

    Oct. 29, 2025 · Vicinity Map

  • Warranty deed

    Warranty deed filed with the preliminary subdivision plat application; no text was available to describe its terms.

    Oct. 29, 2025 · Warranty Deed

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.