Skip to content

Planning project · Planning application

Changes to semi-truck sales and service facility approved

The Planning and Zoning Commission approved changes on May 20 to a previously approved truck sales and service site on 2.18 acres. The changes shrink the first phase, enlarge a later phase, and revise building designs, parking and landscaping.

ApprovedPLN25-00837Filed Sept. 24, 2025South Eisenman · 6880 S Eisenman Rd+6 related filings
Site plan for Changes to semi-truck sales and service facility approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Modification of an approved CUP and Design Review permit

Project name on file: 6880 S EISENMAN RD

Timeline

  1. May 20, 2026

    Planning Applications: Project Entitled

  2. March 30, 2026

    Pending Application Submittal: Planning Applications in Review

  3. March 30, 2026

    IDR Review Complete: Notes

    not required. applicant has decided to do a DR minor MOD instead.

  4. March 30, 2026

    IDR Review Complete: IDR Waived

    IDR not required. The scope of the project has been revised. A Major CUP Modification is no longer requested. The proposed design changes will be reviewed through a Minor Design Review application.

  5. March 30, 2026

    Neighborhood Meeting Review: Not Required

  6. Feb. 27, 2026

    Concept Review Complete: CR Complete - Type 3

  7. Feb. 26, 2026

    Concept Review Complete: Notes

    Reset per S. Mortensen

  8. Nov. 26, 2025

    Planning Applications: Project Entitled

  9. Nov. 20, 2025

    Planning Applications: Generate Additional Application

    Generate additional ROS per C. Bai

  10. Nov. 18, 2025

    Pending Application Submittal: Planning Applications in Review

  11. Sept. 29, 2025

    Concept Review Complete: CR Complete - Type 2

  12. Sept. 24, 2025

    Application Submittal: Online

  13. Sept. 24, 2025

    Application filed

Documents

Site plans

  • Site plan sheet for a second modification proposal, with project contacts, parcel calculations, zoning and dimensional standards, and utility notes.

    Feb. 26, 2026 · 3 pages · 4.5 MB · PDS-Other Small Docs

    Download Proposed second modification site plan
  • Site plan sheet showing project contacts, property size and parcel split, zoning and dimensional standards, and utility and easement notes for the proposed development.

    Nov. 10, 2025 · 6 pages · 8.7 MB · PDS-Other Small Docs

    Download Site and landscape plan modifications
  • Planner notes on a proposed site modification to an approved project: relocated building pads, revised parking, a parcel line adjustment for a future phase, and required submittals.

    Sept. 29, 2025 · 1 page · 448 KB · PDS-Concept Review Summary Report

    Download Concept review summary for design review modification
  • Option 1 site modification sheet with project contacts, dimensional standards and parking calculations, offered as a starting point for further discussion with the Planning and Zoning Commission.

    Sept. 24, 2025 · 1 page · 1.8 MB · PDS-Other Small Docs

    Download Option 1 site modification concept plan

Plans

  • Revised exterior elevation sheets (north, east, south) showing overhead and shop door canopies, metal panel and CMU facade materials, and building heights, marked as a modification to the design review and conditional…

    Feb. 27, 2026 · 2 pages · 4.5 MB · PDS-Other Small Docs

    Download Updated building elevations, revised canopy and facade
  • Architectural floor plan sheets (PA1.3) showing room layouts, square footages, and labeled bays, offices, storage and service areas.

    Nov. 10, 2025 · 3 pages · 6.7 MB · PDS-Other Small Docs

    Download Building elevations and floor plans

Project narrative

  • Planning concept review summary for a proposed modification to a semi-truck sales and service facility's conditional use and design review approvals, listing required applications and approval criteria.

    Feb. 27, 2026 · 3 pages · 471 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Planner's concept review summary for a proposed modification to a semi-truck sales and service facility's conditional use and design review approvals, listing required applications and CUP approval criteria.

    Feb. 27, 2026 · 3 pages · 471 KB · PDS-Concept Review Summary Report

    Download Concept review summary report

Application

  • Application form for a vehicle sales and repair use (major vehicle repair) on a MX-2 zoned business park parcel, referencing earlier related case files.

    Sept. 24, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.