Skip to content

Assured water supply · Planning application

Water supply review under way for commercial site project

The city is reviewing an assured water supply application filed Feb. 17. It includes a site plan of water utilities and a demand estimate. The filing does not say what would be built.

In reviewAWS25-00060Filed Feb. 17, 2026Lusk District · 860 W Sherwood St+6 related filings
Site plan for Water supply review under way for commercial site project
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

City of Boise hasn't published a description of this application yet. See the official record

Project name on file: 860 W SHERWOOD ST

Timeline

  1. Feb. 17, 2026

    Application Submittal: In Office

  2. Feb. 17, 2026

    Application filed

Documents

Site plans

  • Engineering site plan sheet C500 marking sanitary manhole rims, pipe inverts and grades for water-related utility systems, connections and easements; marked preliminary, not for construction.

    Feb. 17, 2026 · 1 page · 724 KB · PDS-Other Small Docs

    Download Site plan showing water-related utility systems and easements

Application

  • Application form for an assured water supply determination for a city-owned parcel, with applicant contact details and a signed owner's declaration; the form directs the applicant to submit Application B.

    Feb. 17, 2026 · 2 pages · 155 KB · PDS-Application

    Download Assured water supply application form
  • Blank city form for applicants seeking assured water supply certification for development served by a Designated Water Provider, with an applicant contact section.

    Feb. 17, 2026 · 10 pages · 186 KB · PDS-Other Small Docs

    Download Assured water supply application B (DWP service area)

Studies and reports

  • Calculator output estimating average and maximum daily water demand for 90 residential customers, with no commercial or industrial customers, for an assured water supply application.

    Feb. 17, 2026 · 4 pages · 70 KB · PDS-Other Small Docs

    Download Water demand estimate worksheet

Correspondence

  • Veolia states the project is serviceable under its current tariffs, lists needed service and hydrant work, and says the letter expires after twelve months.

    Feb. 17, 2026 · 1 page · 253 KB · PDS-Other Small Docs

    Download Veolia will-serve letter for water service

Other documents

  • Site location map

    Feb. 17, 2026 · 4.5 MB · PDS-Other Small Docs

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.